| 1 | Dismantaling and removing RCC columns, beams, slab, staircase, landing, lintels including stacking the materials for reuse and removing the debries within 50 m. lead. |
| 2 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. |
| 3 | Filling foundation and plinth with sand and wel watered & rammedetc . Complete including cost of sand . |
| 4 | Cement concrete of proportion (1:3:6) in F&F using 4 cm size bhg C.B metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect . |
| 5 | R.C.C work of proportion M-25 in Concrete using 20 mm size cbhg chips of approved quality including cost, conveyance, taxes, royalties of all materials, watering & curing for 28 days & cost of all labour with T&P etc. complete. |
| 6 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 7 | Rigid smooth centering & shuttering cost, conveyance, taxes, royalties of all materials, cost of all labour with T&P etc. complete.Column |
| 8 | Rigid smooth centering & shuttering cost, conveyance, taxes, royalties of all materials, cost of all labour with T&P etc. complete.Column |
| 9 | Rigid smooth centering & shuttering cost, conveyance, taxes, royalties of all materials, cost of all labour with T&P etc. complete.Wash Basin Slab |
| 10 | Fly ash Brick masonary in cement mortar (1:6) by using 9\\" size Bricks including all cost, conveyance etc. complete. |
| 11 | G.I safety grill for frames of door & windows including fixing,fitting and welding, conveyance, all cost and required labour and T & P other taxes etc all complete . |
| 12 | 16mm thick cement plaster with (1:6) cement mortar including cost of materials, watering, curing, conveyance lead royalty etc complete. |
| 13 | 12mm (1/2\\") thick cement plaster (1:6) over brick masonary after racking out the joints watering and curing etc. complete with cost, conveyance royalties and taxes of all materials & all labour with T & P required for the work etc. all complete in all respect as per the Direction of the Engineer in charge. |
| 14 | Providing and fixing of Vertified floor tiles, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles of premium grade having thickness 8 mm to 10 mm confirming to IS:13756 (60cm x 60cm plain (Ivory) including rubbing and polishing complete all cost of precast tiles as directed by the Engineer-in-charge. |
| 15 | Wall painting 2 coats with weather coat of approved shade on new work to give an even shade including cost of weather coat etc complete. |
| 16 | Providing, fitting and fixing of Electrification ( Light & Fan ) at Classrooms and Verandah side of building area including cost of materials, labour for fixing etc all complete for work.( Voucher for submitted ) |
| 17 | Photocopy & Sign Board Please Enable Macros to View BoQ information |