| 1 | Supplying all materials, labour T&P for earth work excavation in pipe line trenches in all kind of soil within 50m, initial lead and initial lift including dressing and leveling of bed and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. |
| 2 | Supplying all materials, labour T&P for laying in trenches centrifugally cast (spun) ductile iron pressure , socket and spigot pipes class- K9 without cement mortar lininig conforming to IS : 8329 - 2000 of the following nominal dia as per specification complete. (Earth work in excavation in trenches jointing of pipes, specials & fittings to be measured & paid separately) |
| 3 | 250mm dia D.I pipe [K-9] |
| 4 | 250mm dia D.I pipe [K-7] |
| 5 | 200mm dia D.I pipe [K-7] |
| 6 | 100mm dia D.I pipe [K-7] |
| 7 | Supplying all material, labour T&P & laying in trenches M.S pipes & specials for culvert, nallah & other difficult places as per IS-3589 of the following nominal diameter as per specification complete including cost & carriage of pipes within 5 K.M and painting Pipes two coats with anti corosive paint of approved quality (earth work in excavation in trenches jointing of pipes& specials to be measured separately) |
| 8 | 250mm dia.M.S pipe(6.30mm thick wall) |
| 9 | 200mm dia.M.S pipe(6.30mm thick wall) |
| 10 | 100mm dia.M.S pipe(4.00mm thick wall) |
| 11 | Supplying all material, labour T&P and cutting of M.S pipes for making specials etc all complete as per direction of Engineer-in-charge. |
| 12 | Providing joints by welding with two welding beads/pass, confirming to IS: 816-1998 to M.S pipes & fitting at site by using welding generator including testing of joints, as per specification complete. |
| 13 | Supplying all materials, labour T&P for push on joints conforming to IS: 3114-1994 to Centrifugally (Spun) Cast Iron Pipes/Ductile Iron pipes using Rubber Gaskets conforming to IS: 5382 of S.B.R quality including testing of joints as per specification complete.(excluding tyton rubber ring). |
| 14 | 250mm dia.= |
| 15 | 200mm dia.= |
| 16 | 100mm dia.= |
| 17 | Supplying all materials, labour T&P for fitting, fixing of D.I specials in pipe line such as bend & Tee as per specification complete ( 3% of weight of the pipe line for specials on feeder mains.) |
| 18 | Supplying all materials, labour T&P for fitting, fixing of M.S. specials in pipe line such as bend & Tee as per specification complete |
| 19 | 100mm dia 900 plain bend |
| 20 | 200mm dia 900 plain bend |
| 21 | 250mm dia 900 plain bend |
| 22 | 100x100x100 equal Tee |
| 23 | 200x200x200 equal Tee |
| 24 | 250x250x250 equal Tee |
| 25 | 200x100x200 unequal Tee |
| 26 | 250x100x250 unequal Tee |
| 27 | 250x200x250 unequal Tee |
| 28 | 200mmx100mm reducer |
| 29 | 250mmx200mm reducer |
| 30 | Supplying all materials, labour T&P for Back Filling in Rising Main of trenches, foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge . |
| 31 | Supplying all materials, labour and T&P for Supply, Installation & Testing of Ductile Iron Resilient Seated Glandless Sluice Valve of RATING PN - 1.6 (IS 14846) with double flanged ends for water works purpose of the following rating and nominal diameters, all complete as per specification and direction of Engineer-in-Charge,(including cost of Nut bolt & Washer,Rubber Insertion sheet, etc.) (Make:VAG/ Talis/ AVK/IVC/ Kirloskar/Hawle/Equivalent make with approval of the authority) |
| 32 | 50mm dia Kinetic Air release Valve |
| 33 | 100mm dia. SV of P.N.1.6 |
| 34 | 200mm dia .SV of P.N.1.6 |
| 35 | 250mm dia SV of P.N.1.6 |
| 36 | Supplying all materials, labour T&P for Construction of valve Chamber as per drawing including earthwork in excavation, backfilling in 150 mm layers, watering & consolidating, pumping & bailing out water, shoring, strutting & planking as required, disposal of surplus earth, dressing the site etc complete in all respects with all labour , material & T&P as per specification & direction of Engineer In Charge. |
| 37 | Air valve chamber[0.75x0.75x1.10mtr] |
| 38 | S.V.chamber for 200-250mmdia. S/V. |
| 39 | S.V.chamber size up to 150mm dia. S/V. |
| 40 | Supplying all materials, labour T&P for Cutting of asphalt road for taking pipe line mending the same as per direction of Engineer-in-Charge etc. all complete. |
| 41 | Supplying all materials, labour T&P for Cutting of cement concrete road for taking pipe line as per direction of Engineer-in-Charge etc. all complete. |
| 42 | Supplying all materials, labour T&P for mending of road cutting with cement concrete(1:2:4) with 12mm size hard granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . |
| 43 | Supplying all materials, labour T&P for filling foundation and plinth with sand, watered and rammed including cost of all labour ,materials with all taxes, lead ,T & P etc all complete . |
| 44 | Supplying all , labour T&P for taking of surplus earth from the pipe lime by using mechanical device as per direction of Engineer In Charge. |
| 45 | Supplying all materials , Labour & T & P for providing House service connections to beneificiares from PHE Deptt./WATCO CI/DI pipe line to the property of beneficiaries ( both new & existing) including earth work excavation ,cutting of concrete / Metal/ BT road, refilling the trenches & making good to the damages road with CC (1:2:4) after completition of the work, lifting of excess excavated materials / debrises from work site & disposed within 5 KM radious by mechanical transport , fixing 1/8\\" dia brass/ GM ferrule with following dia composite Strap Saddle in the CI/DI pipe line , cutting holes in brick/ stone / RCC masonary work , repair the broken holes , cost of uPVC Schedule - 80 pipe (25 mm / 20 mm dia up to 7.0mtr /10 mtr respectively ) & fittings , 1 No of PVC Tap of approved make etc. complete as per technical & PH specification and direction of Engineer - in Charge. |
| 46 | Supplying all materials Labour & T & P for fitting & fixing of 20mm dia MDPE pipe (PE -80, 10 kgf/cm2) with compression fittings for connection with ferrule & uPVC service pipe of different diameter to make the connection leak proof including cost of required length of MDPE pipe,both side elbow/Female threaded elbow/Male threaded elbow/Both side adopter/Male threaded adoptor/ Female threaded adoptor etc. complete as per site condition & ditrection of Engineer in charge. Please Enable Macros to View BoQ information |