| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer Electric Division-III , JPDCL Jammu Name of Work : Shifting/Creation of 250 KVA Distribution Sub Station including laying of required 11 KV at Udheywala (JDA) for dispersal of power falling under the jurisdiction of Electric Sub Division Canal on Turnkey basis. Contract No: e-NIT No. 05 of 2026-27 dt. 20.04.2026 Bidder Name : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # |
| 2 | Item Description |
| 3 | Shifting/Creation of 250 KVA Distribution Sub Station for dispersal of power falling under the jurisdiction of Electric Sub Division Canal on Turnkey basis. By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) OLD 250KVA Transformer available at site is to be used |
| 4 | 11/0.433 KV, 3 Phase 250 KVA Distribution Transformer with Bi-Mettalic Terminal Connectors (Energy Level-2) Aluminium wound with extremely fitted MCCB 200 amp with cable box and 4x4 mtrs. Suitable cable of ratings (OLD 250KVA Transformer available at site is to be used) |
| 5 | Gapless Surge Arrester, 9 KV, 10 KA, Lightening Arrestor with Polymer housing Station Type by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 6 | 11 KV GO, AB Switch 3 Phase, 3 Pole, 200 amp, vertical type by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 7 | 11 KV Horn Gap Fuse Set 3 Phase, 200 amp by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 8 | 185 mm² Single core cable, 1.1KV Grade, PVC insulated stranded conductor FRLS type by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 9 | ST Poles 9.0 Mtr long (ST -410 SP 33) by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 10 | 11 KV Polymeric Composite Disc Insulators 12KV, min following load 45 KN, Lightening impulse 75KV positive and 80KV negative, creepage distance 320mm with Fittings by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 11 | GI Channel/Angle/Flat of sizes including clamps by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 12 | Galvinized Nuts & Bolts by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 13 | Earthing of Sub-Station -Excavation of earth pitof diameter 650mm and deapth 3000mm, installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5m long as per IS 1239 GI Strip for neutral earthing of size 25mm into 3 mm for connection of transformer body, GO Set and lightening arrestor as per IS 2629/85, GI Nuts & Bolts, refilled with earth enhancement material by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 14 | 11 KV Polymeric composite Pin Insulators 12KV, 5KN,lighting inpulse 75KV positive and 80KV negative, creepage distance 320mm by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 15 | Galvanized Stay Set with 50X8mm Stay clamp, Guy insulator (2 Nos), anchor plate (200X200X6mm) Nuts & Bolts, 2 nos turn buckles,1.8mm long, 16mm diameter solid GS stay rod and 7/3.15mm dia GI standard wire complete by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 16 | Wedge connectors/PG Clamps by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 17 | Danger Plates with Clamps by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 18 | GI Barbed wire for Anti Climbing by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 19 | Cement Bottoming 1:2:4 mix as per REC Standards 0.5cum/pole by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 20 | Painting of Poles Red-Oxide by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 21 | Painting of Poles Aluminium Paint by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 22 | Sundry items like Aluminium Lugs, Jumpers, Binding Tape Aluminium Thimbles etc.by means of Providing/Supplying, Erection/Installation, Testing & commissioning comp |
| 23 | Dismantling of Existing 250 KVA Distribution substation. The bill will be considered only after the Write back report from Divisional Store. |
| 24 | Erection of 1.35Km11 KV line on PCC Poles 9.0 Mtr long using ACSR Dog with half 52 meter for newly shifted 250 KVA Distribution Sub Station at Udheywala. ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 25 | PCC Poles 9.0 Mtr long ( WL:300Kg)(By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 26 | GI V- Cross arm with top bracket including clamp( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 27 | GI Channel X-arm including clamp and braces( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 28 | ACSR Dog Conductor(100 mm²) ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 29 | PG Clamps for 100mm2 ACSR Conductor ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 30 | 33 KV Polymer composite Pin Insulators 36KV,10KN, Lighting impulse 170KV positive and 180KV negative, creepage distance 900mm ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 31 | 33 KV Polymeric Composite Disc Insulators 36KV, min following load 70 KN, Lightening impulse 170KV positive and 180KV negative, creepage distance 900mm with Fittings( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 32 | Galvanized nuts & Bolts ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 33 | Danger Plates with Clamps ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 34 | Anti Climbing Device with Clamps ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 35 | Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr long through GI Strip ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 36 | Cement Bottoming 1:2:4 mix as per REC Standards 0.5cum/pole ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 37 | Aluminium Jointing sleeves ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 38 | Galvanized Stay Set with 50X8mm Stay clamp, Guy insulator (2 Nos), anchor plate (200X200X6mm) Nuts & Bolts, 2 nos turn buckles,1.8mm long, 16mm diameter solid GS stay rod and 7/3.15mm dia GI standard wire complete ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 39 | Dismantalling of existing 800mtr 11KV Line .The bill will be considered only after the Write back report from Divisional Store. |
| 40 | Creation of Two pole structure using 11 mtr ST Ples for Road Crossing for newly shifted 250 KVA Distribution Sub Station at Udheywala. ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 41 | ST Poles 11.0 Mtr long |
| 42 | GI V- Cross arm with top bracket including clamp |
| 43 | GI Channel X-arm including clamp and braces |
| 44 | ACSR Weasel Conductor(30 mm²) |
| 45 | PG Clamps for 30mm2 ACSR Conductor |
| 46 | 11KV Polymer composite Pin Insulators 12KV,5KN, Lighting impulse 75KV positive and 80KV negative, creepage distance 320mm |
| 47 | 11 KV Polymeric Composite Disc Insulators 12KV, min following load 45 KN, Lightening impulse 75KV positive and 80KV negative, creepage distance 320mm with Fittings |
| 48 | Galvanized nuts & Bolts |
| 49 | Danger Plates with Clamps |
| 50 | Anti Climbing Device with Clamps |
| 51 | Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr long through GI Strip |
| 52 | Cement Bottoming 1:2:4 mix as per REC Standards 0.5cum/pole |
| 53 | Painting of Poles Red-Oxide |
| 54 | Painting of Poles Aluminium Paint |
| 55 | Cement Bottoming 1:2:4 mix as per REC Standards 0.5cum/pole |
| 56 | Galvanized Stay Set with 50X8mm Stay clamp, Guy insulator (2 Nos), anchor plate (200X200X6mm) Nuts & Bolts, 2 nos turn buckles,1.8mm long, 16mm diameter solid GS stay rod and 7/3.15mm dia GI standard wire complete |
| 57 | Erection of 1 No 11KV Tapping point for newly shifted 250 KVA Distribution Sub Station at Udheywala. ( By means of Providing/Supplying, Erection/Installation, Testing & commissioning comp Job) |
| 58 | 9 Mtr PCC Pole (PCC WL: 300Kg) |
| 59 | GI V- Cross arm with top bracket including clamp |
| 60 | GI Channel /An=gle iron including clamp |
| 61 | 11KV GO, AB Switch 3-Phase, 3-Pole,200Amp, vertical Type |
| 62 | ACSR Rabbit Conductor(50 mm²) |
| 63 | PG Clamps for 50mm2 ACSR Conductor |
| 64 | 11 KV Polymer composite Pin Insulators 12KV,5KN, Lighting impulse 75KV positive and 80KV negative, creepage distance 320mm |
| 65 | 11 KV Polymeric Composite Disc Insulators 12KV, min following load 45 KN, Lightening impulse 75 KV positive and 80KV negative, creepage distance 320mm with Fittings |
| 66 | Galvanized nuts & Bolts |
| 67 | Danger Plates with Clamps |
| 68 | Anti Climbing Device with Clamps |
| 69 | Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr long through GI Strip |
| 70 | Stone Pad(300mmx300mmx75mm) |
| 71 | Galvanized Stay Set with 50X8mm Stay clamp, Guy insulator (2 Nos), anchor plate (200X200X6mm) Nuts & Bolts, 2 nos turn buckles,1.8mm long, 16mm diameter solid GS stay rod and 7/3.15mm dia GI standard wire complete Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 No Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information Compatibility Report for BOQe-NIT68.xls Run on 05-03-2024 17:31 If the workbook is saved in an earlier file format or opened in an earlier version of Microsoft Excel, the listed features will not be available. Significant loss of functionality # of occurrences Version Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear truncated. 3.0 Excel 97-2003 Some cells in this workbook contain data validation rules, which refer to values on other worksheets. These rules won't be saved. 4.0 Excel 97-2003 Minor loss of fidelity Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. 4.0 Excel 97-2003 |