|
| 1 | Please Enable Macros to View BoQ information |
| 2 | For Providing Annual Comprehensive Mantenance and Operation of Diesel Generators (160 KVA & 400 KVA ), 33/0.433 KVA Sub-Station, Distribution Panels & Distribution Boxes built in JP Hospital campus-1250, Bhopal (MP)(Detail Schedule Attached) SECTION 4 BILL OF QUANTITIES (BOQ) General Description of work : For Providing Annual Comprehensive Mantenance and Operation of Diesel Generators (160 KVA & 400 KVA ), 33/0.433 KVA Sub-Station, Distribution Panels & Distribution Boxes built in JP Hospital campus-1250, Bhopal (MP) 1st Call. P. A. C. 2875185.00 on Electrical SOR 01-01-2024 SOR, Completion period 365 Days (i/c rainy season) Probable Amount of Contract : (Rs. In Figure) :- 2875185.0 (Rs. In Words) :- Twenty Eight Lakh Seventy Five Thousand One Hundred Eighty Five Only SOR Item No. Particulars of Item of Work Quantity Unit Rate Amount (in figure) Amount (in words) Remarks I II III IV V VI VIII IX PART A: (Annual Comprehensive Maintenance) |
| 3 | Providing Full Annual comprehensive maintenance of 'Silent Type' diesel generating set 160 KVA, 415V.With electronic governor. Periodic maintenance of DG set & AMF control panel as per manufacturer 's maintenance manual inclu iding changing of LUB. Oil Filter + Element V8/V6 , Filter element with O Ring, Filter Insert with O Ring, Element BSK 2501/3 , Element BSK 2501/4 , Gasket - Cylinder Head Cover, Greaves Lub. Oil 20 L CI-4, Greaves Lub. Oil CI4- 10 L, V Belt AX-52 Cogged, AX-45 Cogged Belt, Coolant Additive 5 L Pack , Set Sealing Rings D2V12RC, Set Of Hoses- TBD2V6 RC, Set of Hose Clips- TBDV6, Set of Flex Fuel Pipes, Paper Insert Oil centrifuge, acid battery water and service charges, including battery replacement, if required & as per CPWD specification and CPCB - II Norms complete. NOTE- Work will be treated round the year for one year, excluding consumable such as Diesel for the period of 1 (One) year. |
| 4 | Providing Full Annual comprehensive maintenance of 'Silent Type' diesel generating set 400 KVA, 415V.With electronic governor. Periodic maintenance of DG set & AMF control panel as per manufacturer's maintenance manual inclu iding changing of LUB. Oil Filter (232V12), Filter element with O Ring, Filter Insert with O Ring, Gasket - Cyclinder Head Cover, Air Outer & Inner element, Greaves Lub Oil 5OL CI-4, V Belt AX-66 Cogged, AX-45 Cogged Belt, Coolant Additive 10 L Pack , Set Sealing Rings D2V12RC, Set Of Hoses- TBD3V12 RC, Set of Hose Clips- TBD3V12, Set of Flex Fuel Pipes, Paper Insert Oil CENTRFUG, acid battery water and service charges, including battery replacement, if required and as per CPWD specification and CPCB - II Norms complete. NOTE- Work will be treated round the year for one year, excluding consumable such as Diesel for the period of 1 (One) year. |
| 5 | Providing Full Annual comprehensive maintenance of 33/ 0.4KV Sub-station incluiding 02 No X 1 MVA transformers- Periodic maintenance of Sub-station including cables, change of transformer oil, make-up oil & lubricant, grease, change of DO fuse, change of Oil filters, filteration of transformer oil, Bimetallic connector (HT & LT), Gasket 70 CR Type, HT/LT bushings set, LT/HT metal parts etc. and all other minor repairs within sub - station, main panel etc. complete. The material required for unforseen condition keep the electrical services in working condition shall be arranged by the contractor. NOTE- Work will be treated round the year for 1 (One) year. Total PART A: 571100.0 PART B: Operation of Diesel Generator Sets, Distribution Panels, 33/0.433 kVA Sub-station & Other Internal & External Electrical Works. Operation of 2 No. DG Sets, Panel Rooms, Distribution Panels and DBs etc. (including internal and external electrical related work) 33/0.433 kVA Sub-station cover up the time of 03 shifts per day every month per year as per the scope of work i.e.: emergency services. (Rate Analysis & Workers Abstract enclosed) One Skilled worker/ Operator & 1 Helper/ Semi-skilled worker (3 shifts: 08:00 to 16:00 Hrs & 16:00 to 24:00 Hrs & 00:00 Hrs to 08:00 Hrs) are needed.(Labour Rates as per Reference: MP Labour Comission Office, Indore letter no. 1/ 11/ अन्वे/ पांच / 2024/ 24861, Indore, dated: 01.10.2025, Rate effective from 01.10.2025) (12 months = 1 year) For Working Days |
| 6 | Licensed Wireman/ Skilled Worker (1 Worker/shift x 3 shifts x 1 year= 3 workers) |
| 7 | Helper/ Semi-Skilled Worker (1 Worker/shift x 3 shifts x 1 year= 3 workers) For Weekly Holiday/Any Holiday |
| 8 | Reliever-Licensed Wireman/ Skilled Worker (1 Worker/shift x 3 shifts x 0.5 year = 1 worker) |
| 9 | Reliever-Helper/ Semi-Skilled Worker (1 Worker/shift x 3 shifts x 0.5 year = 1.5 worker) Total PART B: 1917864.9 PART C: Other Emergency Internal &External Electrical Woks PWD E/M SOR 2024 Other various miscelleneous external and internal electrification works,As per the Electrical SOR wef 01-01-2024.The work shall be verified by engineer -in-charge. 1.0 Each 386220.0 386220.0 Total PART C: 386220.0 Total (A + B + C) PAC Amount: 2875185.0 Executive EngineerPWD E/M Division No. 1, Bhopal |