| 1 | Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Managing Director Name of Work: Providing, fabricating & installation of Roof gutters by removing existing roof gutters of Mumbai Monorail's Stations. Tender Reference No.: Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description Item Code / Make Qty Units Estimated Rate(Excl. GST) Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Per Unit Rate(Excluding GST)Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without GST(51=4*13) TOTAL AMOUNT with Taxes(53=51*1.18) TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Providing, fabricating & installation of Roof gutters by removing existing roof gutters of Mumbai Monorail's Stations. |
| 3 | Dismantling and removal of existing Galvanized Iron (GI) roof rainwater gutter and connected rainwater downpipes, installed at a height of approximately 20 to 25 meters from ground level including all associated accessories such as fittings, bends, tees, clamps, brackets, fasteners, support hangers, and downpipe connections. The work includes safe dismantling, lowering, and disposal of materials as directed by the Engineer-in-Charge.ANDSupply, Providing, Fabricating and Erecting Hot Dipped Galvanised \\"Rain Water Gutters' using 3.15 mm thick mild sheets including all accessories, connections sleeves for connecting rain water pipes to Gutters placed at roof along all valleys of Buildings including site seal welding at all Joints to make water tight. Thickness of galvanized coating shall not be less than 50 microns, etc. Size of Gutter 300+350+400=1050mm (ANNEXURE-A)Note:- The rate shall includes;1. All material required, labour, tools, equipment, and compliance with all applicable safety norms.2. Manlifter for working at required height with safe working load of men & material.3. Rate includes all the necessary coordination of traffic & civic authorities shall be done by contractor.4. Civil Engineer and 4 traffic warden shall be provided during the course of work by considering the safety of existing running road traffic & Monorail services.5. Work shall be carried out during Non-revenue hours of Monorail and minimum vehicular traffic moment i.e. night shift 12:15 AM to 4:00 AM. |
| 4 | Providing and fixing SWR uPVC pipes , 6kg/sq.cm. rating, as per lS:4985, including all fittings e.g. bends, junctions, Tees etc. jointing with solvent cement , including fixing the pipe on to the Pier / Pier Cap by drilling / fixing fasteners providing clamps etc.Note:-The Rate Includes1) All material required, Labour , tools,equipment and compliance with all safety norms.2) Manlifter for working at required height with safe working load of men & material. |
| 5 | 200MM dia pipe |
| 6 | 150MM dia pipe |
| 7 | Providing, erecting, maintaining, and dismantling of bamboo scaffolding up to a working height of 25 meters, strictly for access to roof-level areas required for the dismantling and removal of existing G.I. rainwater gutters and the installation of new roof gutters. The scaffolding shall be constructed using well-seasoned, straight, anddefect-free bamboo poles, securely tied with coir rope, jute, or approved synthetic rope with proper lashing and knotting techniques to ensure structural stability. The system shall include adequate cross and diagonal bracing, ties to the building for support, access ladders, working platforms made of closely spaced bamboo or timber planks, guardrails at 1.0m height, mid-rails, and toe boards of minimum 150mm height to ensure safety. All components must comply with IS3696 Part 1 and applicable local safety regulations. The scopeincludes transportation of materials, erection, on-site supervision, regular maintenance, and safe dismantling after work completion. Scaffolding must be erected and inspected only by trained personnel. excluded from this scope. Total in Figures 0.0 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |