| 1 | Following SoW for Role conversion of INS Sutlej to be undertaken |
| 2 | Removal of existing SMB davits includinggearbox, motor, winch including SWR and foundations along with base plate |
| 3 | Degutting and regutting of lagging / panelling / fitting etc from below compartments: |
| 4 | Degutting and removal of Drum Controller from boat deck and control panels from Deck No 2 |
| 5 | Removal of cables from main supply DB to controlpanel and from control panel to drum controller of all four SMB davit motors |
| 6 | Cable gland are to be broken prior removal of cables and blanking of cable glands affected during cable removal: |
| 7 | Restoration of paint scheme in all hot work affected areas: |
| 8 | Removal of existing hydrographic davit and foundations along with base plate: |
| 9 | Cable glands are to be broken prior removal ofcables and blanking of cable glands affected during cable removal: |
| 10 | Restoration of paint scheme in all hot work affected areas: |
| 11 | Degutting and shifting of plotter |
| 12 | Degutting and re-gutting of lagging/paneling/fittings/ etc: |
| 13 | Mission critical Equipment.Removal of Multibeam Echosounder to be undertaken in the presence of OEM reps, M/s PAN India and the equipment to be preserved for fitment onboard other survey ships: The scope of work involves: -Cutting of technical window in instrument room for removal of MSES server rack (approx: Size- 7ft x 5ft) and re-fitment post removal of MSES server rack |
| 14 | Degutting and Removal of HSDS MSES server rack, Analog Electronic unit, Digital ElectronicUnit and Interconnection unit along with cabling and supply |
| 15 | Cutting of gondola structure and packing of keelbase plate and other shell touching compartments post degutting |
| 16 | Removal of transducer and transducer assembly |
| 17 | Carry out DP test of affected underwater structure |
| 18 | Pressure testing of FW tank No: 2 and 3 |
| 19 | Air Pressure testing of cluster 3,4&5 |
| 20 | Restoration of paint scheme in all hot work affected areas |
| 21 | Degutting and regutting of lagging/ panelling/fittings/ etc:in survey instrument room |
| 22 | Removal of Data Cables & Supply Cables from gondola on the keel to survey ops room |
| 23 | Removal of cable tray glands and related appendages |
| 24 | Removal of DIP switch cable from survey ops room to bridge |
| 25 | Preservation of equipment and accessories for transportation to next station |
| 26 | Removal of existing CTD winch including gearbox,motor, winch including SWR and foundations along with base fate: |
| 27 | Degutting and regutting of lagging/ panelling/ fittings/ etc from below compartment: |
| 28 | Blanking of cable glands post removal of cables: |
| 29 | Restoration of paint scheme in all hot work affected areas |
| 30 | Removal of cables and other appendages in survey ops room |
| 31 | Removal of existing oceanographic winch including gearbox, motor, winch including SWRand foundations along with base plate: |
| 32 | Degutting and regutting of lagging / panelling / fitting / etc: |
| 33 | Removal of cables from main supply DB to control panel |
| 34 | Blanking of cable glands post removal of cables: |
| 35 | Restoration of paint scheme in all hot work affected areas: |
| 36 | Removal of SSV sensor and blanking of sea chest |
| 37 | Degutting & blanking of cable gland pipe line passing through 24 Men Mess, magazine and log compartment |
| 38 | Removal of sensor cable & power supply cable from kneel to survey ops room |
| 39 | Extension of trunking for main exhaust trunk in ship's galley till combi-steamer size-(2350mm X 200mm X 100mm), mat - GI |
| 40 | Drilling/tapping for, provisioning of flow meter (05) and temperature gauge (03) in FCUs9:1: Degutting and regutting of cold lagging in FCUs (qty - 10 rmt) ,9:2: Pressure testing of chilled water line post installation of flow meter and temperature gauqe: |
| 41 | Removal of transducers from the kneel packing ofkneel base plate and other shell touching compartments post dequtting : |
| 42 | Removal of existing Transducer cables from FWD SPDC lobby to plotting room and blanking of the surface: |
| 43 | Breakage of cable glands prior removal of cables and Blanking of cable glands affected during cable removal |
| 44 | Removal of cables along with conduits |
| 45 | Degutting of conduits |
| 46 | Carry out DP test of affected underwater structure |
| 47 | Restoration of affected areas |
| 48 | Removal of distribution box fitted in plotting room: |
| 49 | Removal of one 33 & 200 KHz transducer |
| 50 | Breakage of cable glands prior removal of cables and Blanking of cable glands affected during cable removal: |
| 51 | Removal of old cable from FWD Hydro store to plotting room: |
| 52 | Transport of SMBs: Scope of work involves: -13:1: Manufacturing of chokes for 04 SMB's insitu |
| 53 | 13:2: Provisioning of 04 suitable transports for shifting of 04 SMB's from M/s L&T Shipyard, Katupalli to HSU Mumbai, HSU Karwar, HSU Kochi and HSU Port Blair: |
| 54 | Inclining experiment (IE) is to be undertaken post role conversion iaw NCO 0104: Please Enable Macros to View BoQ information |