Name of Work:- Cleaning of Storm water drain at I/A Khushkhera, IID Centre Khushkhera, Tapukara and Karoli
Sl. No.
Item Description
1
Regular desilting cleaning of existing effluent storm water carrying drainage system all types of section of small(open/covered/box type) drains of Industrial areas The scope of work includes regular cleaning of drains, approaches and cross drainage works (slab/box/hume pipe) upto bed level of the drain, culvert, CD work complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes proper disposal of Sludge/Silt/ Garbage etc and transportation of the same with all due care to a suitable ultimate disposal site or outside the Industrial area with all lead and lift as per the direction of Engineer in charge. The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge/Silt/ Garbage etc as per the scopeof work mentioned in bid document and directions of EIC.Note: Complete desilting of drains, approaches & CD works shall be done twice in a year. Initially in first 03 months from the date of commencement of work and then after 06 months of initial desilting. However, uninterrupted flow in drains shall be maintained throughout the year.
2
Desilting cleaning of existing effluent storm water carrying drainage (open big drain / Nallah / disposal drain) of Industrial areas. The scope of work includes regular cleaning of drains upto bed level of the drain complete in all respect to ensure the uninterrupted flow in the drainage system of Industrial Area throughout the year. The work also includes proper disposal of Sludge/Silt/ Garbage etc and transportation of the same with all due care to a suitable ultimate disposal site or outside the Industrial area with all lead and lift as per the direction of Engineer in charge. The adjoining sides of the drain should be properly cleaned and dressed after removal of the Sludge/Silt/ Garbage etc as per the scope of work mentioned in bid document and directions of EIC.Note: Complete desilting of drains, approaches & CD works shall be done twice in a year. Initially in first 03 months from the date of commencement of work and then after 06 months of initial desilting. However, uninterrupted flow in drains shall be maintained throughout the year Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.