| 1 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 2 | FittingandprovidingoneStrutusingHTPSCpoleincludingdiggingand back filling pit in ordinary soil. |
| 3 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole includingdiggingandbackfillingpitsinordinarysoil,drawingsufficient lengthofGIearthleadstothegroundforearthing(excludingprovisionof earthing). |
| 4 | Fitting one set AB switch on existing DP, giving connection and drawing sufficientlengthofGIearthingleadstothegroundforearthing,excluding provision of earthing. |
| 5 | Additionalrateforprovidingonediscset,PGclampetc.complete,onany type of HT pole for making cut point. |
| 6 | FittingoneAdditional75x40mm,1.8mChannelcrossarminexisting single pole including conveyance of materials. |
| 7 | FittingoneAdditional2.4m/3mChannelcrossarm(100x50x6mm),in existing 11kV DP including conveyance of materials. |
| 8 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding typeanchoringclampsincludingcuttingandremovingtreebranches wherever necessary excluding cut point works.conductorstopininsulatorsusingsuitabletieandanchoringwithwedge |
| 9 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 10 | DisconnectingandloweringdownthethreephaseWPserviceconnection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 11 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 12 | Dismantling(withoutdamage)oneLTPSC/RCCpoleafterdisconnecting stays, strut etc. attached thereon and stacking the same. |
| 13 | LabourchargesforloadingLTPSCpolefromthestackingplaceand unloading the same at work site (transportation by any vehicle). |
| 14 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 15 | AdditionalrateforexcavationofonePitforHTPole/HTStayinHard Laterite. |
| 16 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 17 | LabourchargesforloadingHTPSCpolefromthestackingplaceand unloading the same at work site (transportation by any vehicle). |
| 18 | FittinganderectingoneHTPSCSinglePoleinposition,includingfitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 19 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back fillingpit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 20 | LabourchargesforloadingHTAtypepolefromthestackingplaceand unloading the same at work site (transportation by any vehicle). |
| 21 | Providingconcretemuffingofsize0.45x0.45x1.5m(0.5maboveGLand 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 22 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 23 | ProvidingoneCoilEarthusingNo.8GI-earthwire(50mmdia,115turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 24 | AdditionalrateforexcavationofonePitforCoilEarthinginHardLaterite. |
| 25 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 26 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete. |
| 27 | Fitting one No. Section fuse on LT line with dropping cables, crimpingsockets, connecting with bolt & nut etc. |
| 28 | Quoted Amount of BOQ1 in figures |
| 29 | GST Rate in percentage Please Enable Macros to View BoQ information |