| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. (a) Soft / Disintegrated rock |
| 3 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto (d) 20 mm |
| 4 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5 |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;(d) 20mm |
| 6 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. |
| 7 | Brick masonry (using well burnt clay bricks of size 230 x 110 x 70 mm, class designation 75 as per specification) up to plinth including all leads of all construction materials including curing etc. complete ) In cement sand mortar 1:4) |
| 8 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness:12 mm (Add extra over for plaster done over ceiling.) |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: 1 |
| 10 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape whenever required . 1.0 mm thick with zinc coating not less than 275 gm/m2 |
| 11 | Dry stone masonry including all leads of all construction materials. |
| 12 | Providing and Laying 80 mm thick cement concrete blocks of M-40 Grade (Manufactured with fully mechanised dry cast process with forced action mixer whose arms revolve along the main axis and rotate about its own axis also, having humidity sensor for moisture control of w/c ratio in concrete mix. Manufactured with steel moulds(Milled and manufactured in CSI diamond or CSI Nitro process for accuracy) on steel base plate of min 16 mm thick; Having Vibration and pressing action both together with the help of mutiplesynchronised vibrators. Power of hydraulic station should be minimum 50KW for compaction and cured in controlled chambers having humidity control and automated air circulation system) spreading 25mm thick sand underneath and filling joints with sand on existing W.B.M.base, as per IS15658:2006 and all materials shall conform to MoRTH Specification Clause 602. |
| 13 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding:new work (two or more coats)over and scraping and priming coat with cement primer Please Enable Macros to View BoQ information |