|
| 1 | Item Rate BoQ1 BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer ED-3rd, Srinagar Name of Work: Rate Contract for repair, rebuilding of damaged distribution transformers of various capacities (Labour Part Only) for the year 2026-27 Contract No: e-NIT No. ED-III/02 of 2026-27, Dated: - 20/04/2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )1. The Financial Comparative will be prepared after downloading all the individual BOQ's of the bidders. The Financial Comparative/BOQ Comparative chart generated by the e-tender portal shall not construe any right to the bidder for claiming the interse position. In case of discrepancy between the manually prepared Financial Comparative and the electronically generated comparative because of technical reasons, the manually prepared Financial Comparative shall prevail.2. The rates will be reference and individual orders that will be issued depending upon the nature of work, its emergency. 3. Work can be distributed on L1 rates can be issued to other than L1 bidders (in case of excess work) as the discretion of the Corporation/Tender inviting authority. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE (with all taxes) Rs. Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT With Taxes inRs. TOTAL AMOUNT TOTAL AMOUNT In Words |
| 2 | Dismantling / taking of HT Coils out of core limbs and carriage upto the inspection site / table (Exclusive for HT Coils) for set of 3 limbs for (Including detanking of Job) |
| 3 | 16/25 KVA (Aluminium Wound) |
| 4 | 63/100 KVA (Aluminium Wound) |
| 5 | 200/250/300/315 KVA (Aluminium/Copper Wound) |
| 6 | 400 KVA (Copper Wound) |
| 7 | 500 KVA (Copper Wound) |
| 8 | 630 KVA (Copper Wound) |
| 9 | 1 MVA (Copper Wound) |
| 10 | Dismantling / taking of LT Coils out of core limbs and carriage upto inspection site / rebuilding site (Item includes opening of LT Coils for Limbs Set for 3 Limbs) for |
| 11 | 16/25 KVA (Aluminium Wound) |
| 12 | 63/100 KVA (Aluminium Wound) |
| 13 | 200/250/300/315 KVA (Aluminium/Copper Wound) |
| 14 | 400 KVA (Copper Wound) |
| 15 | 500 KVA (Copper Wound) |
| 16 | 630 KVA (Copper Wound) |
| 17 | 1 MVA (Copper Wound) |
| 18 | Fabrication / Winding of fresh HT Coils (Excluding cost of material) for |
| 19 | 16/25 KVA (Aluminium Wound) |
| 20 | 63/100 KVA (Aluminium Wound) |
| 21 | 200/250/300/315 KVA (Aluminium/Copper Wound) |
| 22 | 400 KVA (Copper Wound) |
| 23 | 500 KVA (Copper Wound) |
| 24 | 630 KVA (Copper Wound) |
| 25 | 1 MVA (Copper Wound) |
| 26 | Rewinding/Fabrication of LT Coils (Excluding cost of material) for |
| 27 | 16/25 KVA (Aluminium Wound) |
| 28 | 63/100 KVA (Aluminium Wound) |
| 29 | 200/250/300/315 KVA (Aluminium/Copper Wound) |
| 30 | 400 KVA (Copper Wound) |
| 31 | 500 KVA (Copper Wound) |
| 32 | 630 KVA (Copper Wound) |
| 33 | 1 MVA (Copper Wound) |
| 34 | Refitting of HT / LT Coils, Core Channels and fitting of repaired transformer into the tank (Complete Job) for |
| 35 | 16/25 KVA (Aluminium Wound) |
| 36 | 63/100 KVA (Aluminium Wound) |
| 37 | 200/250/300/315 KVA (Aluminium/Copper Wound) |
| 38 | 400 KVA (Copper Wound) |
| 39 | 500 KVA (Copper Wound) |
| 40 | 630 KVA (Copper Wound) |
| 41 | 1 MVA (Copper Wound) |
| 42 | Filtration of Transformer oil complete job (48-72 hours filtration) (Filtration machine to be provided departmentally) Total in Figures 0.0 23 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |