| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in all kind of soil. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) 40mm nominal size crushed. |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for :- |
| 4 | Foundations, footings, bases of columns. |
| 5 | Suspended floors, roofs, landings and access platforms. |
| 6 | Edges of slabs and breaks in floors and walls upto 20cm wide. |
| 7 | Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete TMT bars. ((Thermo-Mechanically Treated bars of grade Fe-500D or more.)) |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 10 | Carriage of Building Rubbish/Material at an average lead of 5KM by Mechanical Transport including loading, unloading and stacking. |
| 11 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 12 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 13 | Engaging Labour for cutting of trees and unwanted bushes |
| 14 | P/F of un-plasticised PVC pipe design to unplasticised sewerage pipes fixing in cement mortar 1:4 and making good the walls etc complete Make Supreme, Prince, Astral. 150mm dia. |
| 15 | Carriage of material by Mechanical Transport including loading / unloading and stacking at site complete. |
| 16 | Sand for an average lead of 15 Kms. |
| 17 | Stone aggregate below 40mm size for an average lead of 15 Kms. |
| 18 | Stone aggregate 40mm and above 40mm size for an average lead of 15 Kms. Please Enable Macros to View BoQ information |