| 1 | BOQ perticulars |
| 2 | Clearing and taking away of remains of existing fencing components viz, MS rods, pvc pipes etc., |
| 3 | Earth work excavation by manual means for pits of size as shown in the drawing/as directed by the Engineer-in- charge for fixing of fencing poles in soft rock/strata as per technical specifications, including setting out, barricading, caution lights, including dressing of excavated surfaces, stacking excavated stuff or sorting & stacking the selected stuff for reuse including cost of labour, tools, usage& other appurtenances required to complete |
| 4 | Providing and fixing granite Stone Poles of size 0.125x0.1x1.50 m to the proper alignment including Cost of Material, boulders for packing with available excavated earth, compaction, ramming, Labour, Transportation, conveyance, Tools and plants, HOM complete. |
| 5 | Fencing with G.I. barbed wire, Granite Stone Poles placed at required distance, embedded boulders/earth, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of earthwork excavation for pits, Granite Stone Pole, fixing with boulders/earth to be paid separately) :- Payment to be made per metre cost of total length of barbed wire used |
| 6 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates |
| 7 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. |
| 8 | Providing and fixing 1.5mm thick GI sheet for gates by welding including applying a priming coat of red lead paint cost of materials, Transportation , labour,T& P etc. all complete |
| 9 | Finishing with Epoxy paint (two coats) at all locations preparedand applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Enginer-in-charge. Please Enable Macros to View BoQ information |