|
| 1 | Supply of Decentralized material as per UPCL Norms. |
| 2 | C-Wedge Connector Rabbit to Rabbit |
| 3 | MS CLAMP 65X6 MM WITH N&B |
| 4 | M-SEAL COMPOUND |
| 5 | Fluid Compound for Chemical Earthing Rod |
| 6 | Ace Chemrod DIA60MM Length 3000M |
| 7 | PG Clamp |
| 8 | STAY CLAMP FOR ST POLE WITH NUT BOLT |
| 9 | MS NUT & BOLT OFF SIZE |
| 10 | SHACKLE INSULATOR 75X90 mm WITH NUT BOL |
| 11 | STAY INSULATOR |
| 12 | LT CLAMP FOR PCC POLE WITH N&B |
| 13 | Earth Clamp off Size |
| 14 | AL. CRIMPING TYPE LUGS 120 SQ.mm |
| 15 | AL. CRIMPING TYPE LUGS 70 SQ.mm |
| 16 | Following work as per UPCL norms & site requirement. |
| 17 | DISMANTLING OF 25 KVA DTR |
| 18 | HEADLOAD CARTAGE OF 63 KVA DTR(0-1 KM) |
| 19 | JUMPERING OF D/P TPMO, FUSE SET AND T/F |
| 20 | LOOPING AND CHOPPING OF TREE BRANCHES |
| 21 | CARTAGE OF PETTY MATERIAL,21-50 KM |
| 22 | ERECTION OF 11 KV STAY SET |
| 23 | RESAGGING OF LT AB CABLE |
| 24 | GROUTING OF STAY SET |
| 25 | CARTAGE PCC POLE, 21-50 KM |
| 26 | DISMANTLING OF 100 KVA DTR NOS 2,596.00 10 25,960.00 0 0.0011 160710 CHEMI |
| 27 | CHEMICAL EARTHING OF T/F |
| 28 | INST. OF 25 KVA DTR ON POLE STRUCTURE |
| 29 | FIXING OF FUSE SET |
| 30 | INST. OF 100 KVA DTR ON POLE STRUCTURE |
| 31 | ERECTION OF PCC DOUBLE POLE |
| 32 | FABRICATION OF STEEL |
| 33 | DISMANTLING OF 63 KVA DTR |
| 34 | HEADLOAD CARTAGE OF 100 KVA DTR(0-1 KM) |
| 35 | EXCAVATION OF PIT FOR POLE |
| 36 | RESAGGING OF 11 KV LINE |
| 37 | ERECTION OF SP-55 DOUBLE POLE |
| 38 | LAYING & FIXING LT XLPE CABLE |
| 39 | HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM) |
| 40 | INST. OF 63 KVA DTR ON POLE STRUCTURE |
| 41 | EXCAVATION OF PIT FOR STAY SET |
| 42 | HEADLOAD CARTAGE SP-55 POLE(0-1 KM) |
| 43 | GROUTING OF POLE |
| 44 | FIXING OF MS CLAMP |
| 45 | HEADLOAD CARTAGE PCC POLE(0-1 KM) |
| 46 | DISMANTLING OF LT XLPE/ PVC CABLE |
| 47 | CARTAGE SP-55 POLE, 21-50 KM |
| 48 | ERECTION OF EARTHING ROD Please Enable Macros to View BoQ information |