|
| 1 | Supply of Decentralized material as per UPCL Norms. |
| 2 | Mid Span Insulator J.sleeve for LT ABC |
| 3 | LT DB Holding Clamp With N&B |
| 4 | Holding Clamp J-I hook for AB cable |
| 5 | LT BARE N.CONN. PG CLAMP FOR DB 50-50MM² |
| 6 | SHEAR HEAD TYPE IPC 70-35 SQ MM |
| 7 | Piercing Connector for 120-95 mm² |
| 8 | Dead End Clamp with I Hook |
| 9 | Piercing Connector 120 to 35 sq. Mm |
| 10 | MS CLAMP PCC WITH N/B FOR SUSP.CLAMP |
| 11 | Stay Clamp for Pcc Pole |
| 12 | LT Clamp For Pcc Pole |
| 13 | STAY INSULATOR |
| 14 | PG CLAMP 95-25 SQ.mm |
| 15 | LT DISTRUBITON BOX 3 PHAS |
| 16 | SUSPENSION CLAMP WITH EYE HOOK |
| 17 | Following work as per UPCL norms & site requirement. |
| 18 | BACK HEAD LOAD CAPETTY MAT. 1-3KM |
| 19 | HEADLOAD CARTAGE PCC POLE(1-3 KM) |
| 20 | RENOZZELING OF EXISTING STAY SET |
| 21 | DIGGING OF PIT THROUGH HAMMER AT CC, DAM |
| 22 | MAKING OF SECTION POLE |
| 23 | ERECTION OF EARTHING ROD |
| 24 | HEADLOAD CARTAGE OF MATERIAL(1-3 KM) |
| 25 | FIXING OF JOINTING SLEEVES FOR AB CABLE |
| 26 | FIXING OF SUSPENSION CLAMP WITH I HOOK. |
| 27 | FIXING OF PIERCING CONNECTOR 70-35 SQMM |
| 28 | LAYING OF LT XLPE ABC 3X95+1X70 SQ.MM |
| 29 | BACK CARTAGE OF PETTY MATERIAL,51-70 KM |
| 30 | FIXING OF HEAT SHRINK CAP FOR AB CABLE |
| 31 | DISMANTLING OF LT LINE 1 P 2 W(WEASEL) |
| 32 | FIXING OF PIERCING CONNECTOR L2L 70-70 |
| 33 | STRAIGHTENING OF TILTED PCC POLES |
| 34 | ERECTION OF SINGLE PCC POLE |
| 35 | ERECTION OF J-HOOK |
| 36 | LAYING AND FIXING OF 1X35SQMM XLPE CABLE |
| 37 | INST & FIX OF AL LUG FOR AB CABLE AT DTR |
| 38 | FIXING OF PIERCING CONNECTOR L2L 120-120 |
| 39 | SUPPLY & FIXING OF LT CLAMP FOR PCC POLE |
| 40 | FIXING OF PG CLAMP L2L 50-50 |
| 41 | FIXING OF PG CLAMP L2B 50-25 |
| 42 | FIXING OF MS CLAMP |
| 43 | FIXING OF DEAD END CLAMP |
| 44 | INSTALLATION OF 240SQ. MM LT AL LUGS |
| 45 | DISCONNECTION & RECONNECTION OF CONsumer |
| 46 | CARTAGE OF PETTY MATERIAL,51-70 KM |
| 47 | CARTAGE PCC POLE, 51-70 KM |
| 48 | LAYING OF LT SERVICE CABLE(OVERHEAD) |
| 49 | INSTALLATION OF LT DISTRIBUTION BOX |
| 50 | RECTIFICATION OF JUMPERS ON HT/LT POLE |
| 51 | ERECTION OF SUITABLE RATING LUGS,GLANDS |
| 52 | LOOPING AND CHOPPING OF TREE BRANCHES Please Enable Macros to View BoQ information |