| 1 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soil of all types ,sand,gravel and soft murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed , normal dewatering, preparing the bed for foundation and excluding backfilling , etc. complete |
| 2 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum and boulders ,W.B.M. Road including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling , etc. complete |
| 3 | Item No.3:- Providing & laying in situ. C.C of trap granite/ quartzite / gneiss/ metal for foundation & bedding including dewatering , from work,compacting, curing, finishing etc. complete. M 150 |
| 4 | Item No.4 :- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. ( By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-250grade chajjas/ paropels/ qurtain boalls/ partition wall / pardies R.C.C. M-150 for protection wall |
| 5 | Item No.5:- Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations,slabs, beams, columns, canopies, staircases. newels, chajjas,lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete.(including cost of binding wire) IS 1786, (Bd-F-17/306) Tor steel |
| 6 | Itemno:6- Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. |
| 7 | Item No.7:- Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. |
| 8 | Item No.8 :- Compressive Strength OF C.C. Cube (Set of 3 cubes). |
| 9 | Item.no:9 - ADD GST 18% Please Enable Macros to View BoQ information |