| 1 | Providing, laying, aligning, and jointing 200 mm diameter (i/d) M.S. spiral welded pipe having 8 mm wall thickness, fabricated as per IS:3589 (2001) from Fe-330 grade steel plates conforming to IS:2062 and manufactured by approved makes such as TATA, Jindal, or ESL. The work includes cutting, leveling, grinding, and jointing of the pipes with radiographic-quality welding. The internal surface and outer surface of the pipe shall be coated with a minimum 200-micron thick food-grade epoxy lining, complete in all respects as per specifications and as per the direction and to the entire satisfaction of the Engineer-in-Charge. |
| 2 | Providing, laying, aligning, and jointing 150 mm diameter (i/d) M.S. spiral welded pipe having 8 mm wall thickness, fabricated as per IS:3589 (2001) from Fe-330 grade steel plates conforming to IS:2062 and manufactured by approved makes such as TATA, Jindal, or ESL. The work includes cutting, leveling, grinding, and jointing of the pipes with radiographic-quality welding. The internal surface and outer surface of the pipe shall be coated with a minimum 200-micron thick food-grade epoxy lining, complete in all respects as per specifications and as per the direction and to the entire satisfaction of the Engineer-in-Charge. |
| 3 | Providing, laying, aligning, and jointing 400 mm diameter (i/d) M.S. spiral welded pipe having 10 mm wall thickness, fabricated as per IS:3589 (2001) from Fe-330 grade steel plates conforming to IS:2062 and manufactured by approved makes such as TATA, Jindal, or ESL. The work includes cutting, leveling, grinding, and jointing of the pipes with radiographic-quality welding. The internal surface and outer surface of the pipe shall be coated with a minimum 200-micron thick food-grade epoxy lining, complete in all respects as per specifications and as per the direction and to the entire satisfaction of the Engineer-in-Charge. |
| 4 | Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty. complete in all respect as per satisfaction of engineer in charge.Make:-Philips,Bajaj,GE,Wipro,K- lite,crompton greaves |
| 5 | Pumping arrangement for diversion of flow after pluggingand during execution of work for repairing of settled mastersewer line with 2 Nos pumps atleast 20 to 50 HP with GenSet 30 KVA to 125 KVA including cost of diesel, panel board,PVC houz pipe, electrician and pump operator round theclock etc. complete in all respect. For 450mm i/d to 600mmi/d master sewer line |
| 6 | Plugging of both side existing M.H`s of master sewer line ofvarious sizes at upstream and downstream for cleaning ofblockage and repairing of settled master sewer line withdismantling of RCC slab, placing of jamuna sand bag,providing labour for plugging and cleaning of M.H`s, M.S.Sheet, hiring hydra for lifting of M.S. Sheet, safetyequipment etc. complete in all respect. 450mm to 600mmdia master sewer line |
| 7 | Operation and Maintenance of storm water disposal system including operation and maintenance of 200 kVA transformer, 2 Nos. starter panels for 40 HP non-clog submersible motor pumps, 2 Nos. non-clog submersible motor pumping sets of 40 HP each, 200 kVA DG set, all valves and specials, 2 Nos. 150 mm dia MS delivery lines from sump well to 400 mm dia MS header line and 400 mm dia DI delivery line from storm water disposal to Mathura Road, including periodical desilting of sump well as required, complete electrical installations, deployment of operator and sewer man, including 3 months trial run and 2 years comprehensive OandM, complete in all respects as per directions and to the entire satisfaction of the Engineer-in-Charge. |
| 8 | Supply and fixing of EC bags for making bandh including providing EC bags with filled sand, Cartage, labour charges, loading and unloading of filled bags, placing in position as directed and removal of all EC bags after completion of work. The work shall include all necessary safety measures and compliance with labour safety codes complete in all respect as per the direction and entire satisfaction of the Engineer-in-Charge. |
| 9 | Construction of Storm water Disposal including sumpwell near Sarai Fatak along with laying of 400mm DI line from railway culvert to Mathura road and all other works contingent thereto, MC Faridabad Please Enable Macros to View BoQ information |