| 1 | 1. Supply Part :- DC Distribution Panel (30V, DC) with all allied Accessories of HBL, Statcon, Ultima, Redetron, L&T Automation, JVV make only . |
| 2 | 11 KV GO AB Switch Unit (11 KV, 400A, 25KA) Tripple Pole Out Door Type Prefect Sales make |
| 3 | 11 kV Cable (11 kV, 400 mm², XLPE, Three Core, Armoured) {Transformer to 11 kV Bus} {50m+Spare-50m} Cable Corporation of India, Havells Industries, Jamshedpur, KEI Industries Ltd., New Delhi, Polycab Industries Daman Pvt. Ltd., Ravin Industries Pvt. Ltd., MMP Industries Nagpur, RR Kabel, Sarsavati Cables, Una. make only |
| 4 | 11 kV XLPE Cable Termination Kit (400 mm², Outdoor Type) Raychem Industries, 3-M Electro Communication India Ltd. Mumbai., Denson make only |
| 5 | 11 kV XLPE Cable Termination Kit (400 mm², Indoor Type) Raychem Industries, 3-M Electro Communication India Ltd. Mumbai., Denson make only |
| 6 | ACSR 30/7/3.00mm 2 conductor for re-condr. Of bus bar wolf 30/7/2.59 |
| 7 | PG clamps 200mm |
| 8 | Earthing (33kV Sub-Station) (Chemical Type Earthing) |
| 9 | 33 KV Lightening Arrestor (30kV, 10KA) Lamco, Oblum Electrical Industries Pvt. Ltd, Crompton Grieves Power & Industrial Solutions Ltd., Gurgaon, Shreem Electricals Ltd. Kohlapur, New Aquaria Electech Pvt. Ltd. Make Only |
| 10 | 2. Erection Part :- AUGMENTATION OF POWER TRANSFORMERS: : : Dismentaling of old existing 33/11KV Power Transformer , 3.15 MVA and all allied equipments /material complete in all respect. And stacking it at appropriate place in the yard as directed by the Engineering- In-Charge of work. |
| 11 | Erection of new 33/11KV, 6.3MVA Power Transformer the work includes complete erection, testing and commissioning of a 33/11 kV, 6.3 MVA power transformer, including assembly of all accessories, oil filling/filtration, alignment and connection with the system as per specifications. It also covers carrying out all pre-commissioning tests such as IR, winding resistance, ratio, vector group and oil tests as per relevant IS/IEC standards. The scope further includes providing complete earthing of the transformer with body and neutral earthing using GI strips connected to the earth grid. All control wiring, terminations and protection checks shall be ensured before energization(Including dehydration & hiring charges of Hydra etc.) |
| 12 | Erection of new VCB 36kV, 1250A a/w C&R Panel, CT etc. and making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 13 | Replacement of 33KV Isolator with new 33KV Isolator (With and Without Earth Switch) including dismentaling of old Isolator and stacking it at appropriate place in yard, Erection of new 33KV Isolator, making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 14 | Erection of Installation of Lightening Arrestor making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. . |
| 15 | Erection of One Set of GO AB Switch Assembly and allied material including MS Channel X-Arms,GO Switch Assembly & making its connections , testing, commissioning etc.complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 16 | Replacement of One Set 33KV Potential Transformers (PTs) with new Potential Transformers (PTs) including dismentaling of old Potential Transformers (PTs) and stacking it at appropriate place in the yard, Erection of new 33KV Potential Transformers (PTs), making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 17 | Replacement of One Set of 33KV Current Transformers (CTs) with new 33KV Current Transformer (CT) including dismentaling of old 33KV Current Transformer (CT) and stacking it at appropriate place in yard, Erection of new 33KV Current Transformer (CT), making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 18 | Replacement of old Battery Bank 30V, 100AH with new Battery Bank 30V, 100AH i.e. dismentaling of exicting Battery bank and stacking it at appropriate place, Erection of new Battery Bank and making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. . |
| 19 | Replacement of defective Battery Charger 30V, 100AH with new Battery Charger 30V, 100AH i.e. dismentaling of exicting Battery Charger and stacking it at appropriate place, Erection of new Battery Charger and making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 20 | Replacement of defective DCDV 30V, 100AH with new Battery Charger 30V, 100AH i.e. dismentaling of exicting DCDV and stacking it at appropriate place, Erection of new DCDV and making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL |
| 21 | Replacemennt of defective ACDB 415V with new ACDB 415V i.e. dismentaling of exicting ACDB and stacking it at appropriate place, Erection of new ACDB and making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 22 | Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Set). |
| 23 | Erection of 11 kV Cable (11 kV, 400 mm², XLPE, Three Core as per latest standard practices /specification of REC / HPSEBL making its necessary connections, testing and commissioning of the same complete in all respect as per latest standard practices /specification of REC / HPSEBL. |
| 24 | Erection of 11 kV Cable (11 kV, 400 mm², XLPE, Three Core End Termination Kits (I/D ,O/D) TYPE as per latest standard practices /specification of REC / HPSEBL (Per Set). |
| 25 | 3. OTHER CHARGES:Add Transportation charges i/c Manual Carriage.Rs. 49*x105 = 5145 x 2Trips |
| 26 | 4. OTHER CHARGES: Add Testing & Commissioning Charges:- Paid to HP GoHP Scale C Item 6 @ Rs. 4500/- & as per schedule of Tariff & & General Service Charges Page 428 , Para C2 i.e. 15000+(Visiting Charges 3500x2days=7000)+ Journey Charges @ Rs.16x150km= 2400/-) Total = 28,900/ |
| 27 | Labour Cess (@ 1% of the total amount of the supply, erection, testing & commissioning Augmentation of 33/11KV S/Stn., Sujanpur to 2x6.3MVA Power Transformers(for complete Job). Please Enable Macros to View BoQ information |