| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complete. |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. |
| 3 | Providing first class M-100 brick work in 1:4 CM 3 m lift and 60 M lead including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. |
| 4 | Ordinary Centering and shuttering for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. |
| 5 | R.C.C. M-20(1:1.5:3) with cement, coarse sand & 20 mm down graded stone grit in deck slab and approach slab including cost of material, labour T&P etc. but excluding cost of centering shuttering and reinforcement required for proper completion of work. |
| 6 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. |
| 7 | Providing and Laying lean concrtet (1:4:8) cement concrete including cost of all materials, labour, T & P, all lifts and leads etc. |
| 8 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. |
| 9 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position,Including cost of all labour and T&P etc. Complete as directed by Engineer-in -charge. |
| 10 | Providing and fixing Drainage Spouts (100 mm dia) complete as per drawing including cost of all material, labour and T&P etc. required for proper completion of work. |
| 11 | Providing struck deep pointing in 1:2 cement mortar on brick masonary including cost of all material ,labour ,T&P ,all lifts and leads etc complete. |
| 12 | Providing and fixing of expansion joint with angle iron 75x75x10 mm size, with M.S. flat 32x6 mm, filled with filled with bitumen and stone dust including cost of all material, labour T&P all lifts and leads etc .compete as per direction of Engineer-in-charge. |
| 13 | Supplying and laying tarfelt in two layers under deck slab bearing painted with maxphalt including cost of all material,labour and T. & P. etc. complete |
| 14 | Earth work in making ramp on approach road by power transported earth with a lead beyond 200 m and upto 1.00 Km. including excavation, loading, unloading, royalty, manual compaction, dressing and all lifts complete required for proper completion of work. |
| 15 | Supplying and fixing wheel guard size 150 x 150 x 900 mm with cost of all material, labour and T&P required for proper completion of work. |
| 16 | S/Fixing Marble B.M.Plate of Size 150 x 150 x 25 mm/Nos. |
| 17 | S/Fixing Marble Name Plate of Size 300x200x25 mm/Nos. |
| 18 | Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. |
| 19 | Dismantling of existing metalled road including disposal with in 30 m |
| 20 | 1st Class Brick work in mud mortar with cost of of all material, labour, T & P complete required for proper completion of work. |
| 21 | Construction of granular sub-base Grade-1 by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 22 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. |
| 23 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 24 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 25 | Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface incliding supply of all meterial T&P and labour cess etc. and exluding cost of bitumen but excluding cost of GST as per direction of Engineer in charge. |
| 26 | P/L of open graded premix carpeting of 20mm thick composed with 13.2 mm and 11.2mm grit aggregate or approved graded grit @ 0.27 cum/10Sqm. using 80/100 bitumen @ 146.00 Kg./100Sqm. as bearing course, including heating of bitumen to required temperature, and incliding supply of all meterial T&P and labour cess etc. and exluding cost of bitumen but excluding cost of GST as per direction of Engineer in charge.. |
| 27 | Providing and applying seal coat type ‘C’ with 6.8 mm gauge stone grit @ 0.90 cum/100 Sqm & bitumen 65 kg/100 Sqm including heating of bitumen to required temperature, mixing of stone gri with suitable mixol, laying and rolling with a smooth wheeled roller including cost of all material, Labour, royalty, T&P and all taxes etc required for proper completion of work and roller charges and exluding cost of bitumen but excluding cost of GST as per direction of Engineering in charge. Please Enable Macros to View BoQ information |