| 1 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up inembankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m :All kinds of soil |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.a) All kinds of soil. |
| 4 | b) Ordinary rock |
| 5 | Dumping stone including cost of stones. in Horizontal on level |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 7 | b) 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand:12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 9 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4(1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). |
| 10 | Providing and laying 60mm thick factory made cement in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid joints with line sand etc. all complete as per the direction of Engineer-in-charge. |
| 11 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall beapproved by Engineer-in-charge). |
| 12 | Supplying and stacking of good earth at site including royalty and carriage upto 1km (earth measured in stacks will be reduced by 20% for payment). |
| 13 | Supplying and stacking at site dump manure from Badlioro the rapproved source, including carriage upto 1km manure measured in stacks will be reduced by 8% for payment): Screened through sieve of I.S. designation 4.75mm |
| 14 | Fine dressing the ground. |
| 15 | Mixing earth and sludge or manure in proportion specified or directed. |
| 16 | Grassing with ‘Doob’ grass including water in gand maintenance of the lawn for 30days or more till the grass forms a thick lawn free from weeds and fit for mowing including supplying good earth if needed (the good earth shall be paid for separately). In rows 5 cm apart in either direction. |
| 17 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In cement mortar |
| 18 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In mud mortar |
| 19 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below |
| 20 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of:G.S. Sheet |
| 21 | Carriage of material from source to site by MT including loading, unloading and stacking complete job. a) Cement an avg. lead of 02km |
| 22 | b) Sand an avg. lead of 15km |
| 23 | c) Stone Agg. An average lead of 15km |
| 24 | d) Stone an avg. lead of 20km Please Enable Macros to View BoQ information |