| 1 | Loading of Poles |
| 2 | Loading of ST Pole 8.0m Long |
| 3 | Loading of ST Pole 9.0m Long |
| 4 | SLoading of ST Pole 11/13m Long |
| 5 | Loading of Wooden Pole |
| 6 | Unloading of pole at road side and its carriage upto 25 Mtr. ST Pole 8.0m Long |
| 7 | Unloading of pole at road side and its carriage upto 25 Mtr. ST Pole 9.0m Long |
| 8 | Unloading of pole at road side and its carriage upto 25 Mtr.ST Pole 11/13m Long |
| 9 | Unloading of pole at road side and its carriage upto 25 Mtr. Wooden Pole |
| 10 | Dragging/ Manual carriage of pole to site of work upto first 50 Mtr. ST Pole 8.0m Long |
| 11 | Dragging/ Manual carriage of pole to site of work upto first 50 Mtr. ST Pole 9.0m Long |
| 12 | Dragging/ Manual carriage of pole to site of work upto first 50 Mtr. ST Pole 11/13m Long |
| 13 | Dragging/ Manual carriage of pole to site of work upto first 50 Mtr. Wooden Pole |
| 14 | Dragging/ Manual carriage of pole to site of work for every subsequent 50 Mtr. ST Pole 8.0m Long |
| 15 | Dragging/ Manual carriage of pole to site of work for every subsequent 50 Mtr. ST Pole 9.0m Long |
| 16 | Dragging/ Manual carriage of pole to site of work for every subsequent 50 Mtr. ST Pole 11/13m Long |
| 17 | Dragging/ Manual carriage of pole to site of work for every subsequent 50 Mtr. Wooden Pole |
| 18 | Loading of line material. A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog etc. |
| 19 | Loading of line material. 11KV AB Cable/LT2.5Core/11KV PVC/XPLE Insulated Cable etc. |
| 20 | Loading of line material. M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire etc. |
| 21 | Loading of line material. Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set/LA etc. |
| 22 | Unloading and manual carriage of line material upto 25 Mtr. A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog etc. |
| 23 | Unloading and manual carriage of line material upto 25 Mtr. 11KV AB Cable/LT2.5Core/11KV PVC/XPLE Insulated Cable etc. |
| 24 | Unloading and manual carriage of line material upto 25 Mtr. M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire etc. |
| 25 | Unloading and manual carriage of line material upto 25 Mtr. Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set/LA etc. |
| 26 | Manual carriage of line material to site of work beyond 25 Mtr. for first 50 Mtr . A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog etc. |
| 27 | Manual carriage of line material to site of work beyond 25 Mtr. for first 50 Mtr . 11KV AB Cable/LT2.5Core/11KV PVC/XPLE Insulated Cable etc. |
| 28 | Manual carriage of line material to site of work beyond 25 Mtr. for first 50 Mtr .M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire etc. |
| 29 | Manual carriage of line material to site of work beyond 25 Mtr. for first 50 Mtr .Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set/LA etc. |
| 30 | Manual carriage of line material to site of work beyond 25 Mtr. for first 50 Mtr . A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog etc. |
| 31 | Manual carriage of line material to site of work beyond 25 Mtr. for first 50 Mtr . 11KV AB Cable/LT2.5Core/11KV PVC/XPLE Insulated Cable etc. |
| 32 | Manual carriage of line material to site of work beyond 25 Mtr. for first 50 Mtr . M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire etc. |
| 33 | Manual carriage of line material to site of work beyond 25 Mtr. for first 50 Mtr .Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set/LA etc. |
| 34 | Loading of 11/0.4 KV Distribution transformer Up to and including 63 KVA |
| 35 | Loading of 11/0.4 KV Distribution transformerFrom 100 KVA upto and including 300 KVA |
| 36 | Loading of 11/0.4 KV Distribution transformer Above 300 KVA upto and including 630 KVA |
| 37 | Loading of 11/0.4 KV Distribution transformerAbove 630 KVA upto and including 2000 KVA |
| 38 | Unloading of 11/0.4 KV Distribution transformerUp to and including 63 KVA |
| 39 | Unloading of 11/0.4 KV Distribution transformer From 100 KVA upto and including 300 KVA |
| 40 | Unloading of 11/0.4 KV Distribution transformerAbove 300 KVA upto and including 630 KVA |
| 41 | Unloading of 11/0.4 KV Distribution transformer Above 630 KVA upto and including 2000 KVA |
| 42 | 1Dragging of 11/0.4 KV Distribution transformer upto first 10 Mtr. 6 KVA upto and including 25 KVA |
| 43 | Dragging of 11/0.4 KV Distribution transformer upto first 10 Mtr. 25 KVA upto and including 63 KVA |
| 44 | Dragging of 11/0.4 KV Distribution transformer upto first 10 Mtr. 100 KVA upto and including 300 KVA |
| 45 | Dragging of 11/0.4 KV Distribution transformer upto first 10 Mtr. 300 KVA upto and including 630 KVA |
| 46 | Dragging of 11/0.4 KV Distribution transformer upto first 10 Mtr.630 KVA upto and including 2000 KVA |
| 47 | Dragging of 11/0.4 KV Distribution transformer for every subsequent 10 Mtr.16 KVA upto and including 25 KVA |
| 48 | Dragging of 11/0.4 KV Distribution transformer for every subsequent 10 Mtr. 25 KVA upto and including 100 KVA |
| 49 | Dragging of 11/0.4 KV Distribution transformer for every subsequent 10 Mtr. 100 KVA upto and including 300 KVA |
| 50 | Dragging of 11/0.4 KV Distribution transformer for every subsequent 10 Mtr. 300 KVA upto and including 630 KVA |
| 51 | Dragging of 11/0.4 KV Distribution transformer for every subsequent 10 Mtr. 630 KVA upto and including 2000 KVA |
| 52 | Loading charges Diesel Generators DG set 5KVA to 50KVA |
| 53 | Loading charges Diesel Generators DG set 51KVA to 250KVA |
| 54 | Loading charges Diesel Generators DG set 251KVA to 500KVA |
| 55 | Loading charges Diesel GeneratorsDG set above 500KVA |
| 56 | Unloading charges Diesel GeneratorsDG set 5KVA to 50KVA |
| 57 | Unloading charges Diesel Generators DG set 51KVA to 250KVA |
| 58 | Unloading charges Diesel Generators DG set 251KVA to 500KVA |
| 59 | Unloading charges Diesel GeneratorsDG set above 500KVA |
| 60 | Dragging of Diesel Generator upto first 10 Mtr. DG set 5KVA to 50KVA |
| 61 | Dragging of Diesel Generator upto first 10 Mtr. DG set 51KVA to 250KVA |
| 62 | Dragging of Diesel Generator upto first 10 Mtr.DG set 251KVA to 500KVA |
| 63 | Dragging of Diesel Generator upto first 10 Mtr. DG set above 500KVA |
| 64 | Dragging of Diesel Generator for every subsequent 10 Mtr. DG set 5KVA to 50KVA |
| 65 | Dragging of Diesel Generator for every subsequent 10 Mtr.DG set 51KVA to 250KVA |
| 66 | Dragging of Diesel Generator for every subsequent 10 Mtr.DG set 251KVA to 500KVA |
| 67 | Dragging of Diesel Generator for every subsequent 10 Mtr.DG set above 500KVA |
| 68 | Loading charges of LT/11KV Panel/Control Panel etc Dragging charges of LT/11KV Panel/Control Panel etc for every subsequent 10 Mtr. |
| 69 | Dismentaling of 8/9 Mtr long ST Poles at Divisional Store. |
| 70 | Loading charges of Oil Filteration Plant 1000LPH to 5000LPH |
| 71 | Unloading charges of Oil Filteration Plant 1000LPH to 5000LPH |
| 72 | Dragging charges of Oil Filteration Plant 1000LPH to 5000LPH for every subsequent 10 Mtr. |
| 73 | Loading charges of Transformer Oil/Colant/M-Oil Barrel |
| 74 | Unloading charges of Transformer Oil/Colant/M-Oil Barrel |
| 75 | Dragging charges of Transformer Oil/Colant/M-Oil Barrel upto first 25 Mtr. |
| 76 | Dragging charges of Transformer Oil Barrel for every subsequent 10 Mtr. |
| 77 | Per Day Charges of Skilled labour (Electrician/Fitter) |
| 78 | Per Day Charges of Semi Skilled labour (Assistant Electrician/Assistant Fitter) |
| 79 | Per Day Charges of Un-Skilled labour |
| 80 | Skilled labour for Loading/Unloading of HSD Oil At Div. Store per 1KL |
| 81 | Un-Skilled labour Loading/Unloading of HSD Oil At Div. Store per 1KL Please Enable Macros to View BoQ information |