| 1 | LABOUR |
| 2 | (955) Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 3 | (163) Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit(0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 4 | (726) Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading & unloading charges. |
| 5 | (119) Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 6 | (926) Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). |
| 7 | (929) Laying HT XLPE UG cable of sizes identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing |
| 8 | (931) Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cablejointer and other sundries etc. as per thedirection of departmental officers at site. |
| 9 | (933) Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 10 | (167) Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 11 | (171) Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 12 | (363) Drilling hole of various sizes on existing Channel/Cross Arm. |
| 13 | (117) Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing(excluding provision of earthing). |
| 14 | (703) Labour charges for loading HT A type pole from the stacking place and unloading the same at work site(transportation by any vehicle). |
| 15 | (164) Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 16 | (934) Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. |
| 17 | (C-20232 4-4567-1 6) Doing Horizontal Directional Drilling (HDD) along and across roads, supplying 125mm HDPE pipe duct for drawing XLPE UG cable upto the size of 3 X 300 sq mm, through the ductincluding surveying the route for other utilities like cables, pipes etc and making inspection pits. |
| 18 | (30.1) Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessaryexcluding cut point works. |
| 19 | (30.2) Providing bridging at Cut points for 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalent (1 conductors) using IPC and respective conductors |
| 20 | (112) Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawingsufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 21 | (702) Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 22 | Total of BoQ1 Please Enable Macros to View BoQ information |