|
| 1 | Part- I: Erection of 11KV OH 3PH 3W Line with AAAC-100mm²-0.760 KM , 9MTR PSC - 16 No.s Stay -02 No.sas per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances ,contigency,salvage etc. Complete required for the work as per direction of the Engineer-in-charge 9Mtr long 330kg PSC pole (Stud) |
| 2 | Base Plate for PSC Pole |
| 3 | Straight Cross Arm Channel 100X50X5mm, 9.56KG/Mtr., each channel length 1.2 mtr. |
| 4 | Straight Cross Arm Top Channel 100X50X5mm,9.56 KG/mtr, each channel length 0.306 Mtr. |
| 5 | Fish Plate 50X8 mm., 0.97kg/Mtr., each 0.280 mtr. Length |
| 6 | Danger Plate, 1 no |
| 7 | Back Clamp for danger Plate 25X3 mm. flat,0.59Kg/Mtr. Flat of 0.510mtr 1 no |
| 8 | GI barbed wire anticlimbing device 3 Kg. Persupport |
| 9 | Back Clamp for anticlimbing device 25X3mm.flat, 0.59Kg/Mtr. Flat of 0.510 mtr length 4 no's |
| 10 | 11kV,5kN pin insulator polymer |
| 11 | 11kV V cross Arm (GI) |
| 12 | GI Back Clamp for 11kV 'V' Cros Arm |
| 13 | Top bracket 100X50X5mm GI channel |
| 14 | H W fitting(B&S) 70KN, 3Bolt |
| 15 | Disc insulator (B&S) 70 KN polymer |
| 16 | Earthing of Support ( Coil Type ) |
| 17 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr.For connecting pole with Coil earthing |
| 18 | PG Clamp for 100 mm2 AAAC conductor |
| 19 | GI Nut , Bolt & Washer of different sizes |
| 20 | H.T. Stay clamp |
| 21 | H.T. Stay set (Complete ) |
| 22 | H.T. Stay Insulator |
| 23 | 7/10 SWG Stay Wire |
| 24 | 100mm2 All Alloy Aluminium Conductor-AAAC |
| 25 | Black Paint |
| 26 | Yellow Colour Paint for Background |
| 27 | Sunderies |
| 28 | Civil ServiceCement concreting for stay anchor plate withC.C. 1:2:4, 0.2 Cum @ 6177.92/- |
| 29 | Concreting of 8/9Mtr Poles in ratio 1:1.5:3=0.375Cum. @6648.85 |
| 30 | Couping of support in ratio C.C. 1:1.5:3, 0.1125Cum |
| 31 | GIS Services |
| 32 | Dismantling PartDismantling of 9/8m PAC Poles |
| 33 | Dismantling 80-100 sqmm AAAC Conductor |
| 34 | ESTIMATE FOR SHIFTING OF 11KV AGRICULTURE LINE DUE TO ROAD WIDENING WORK OF SIKIRI- NUAGAON PWD ROAD UNDERELECTRICAL SECTION HINJLICUT (SKECH-II- GIRIA VILLAGE ) Part- I: Erection of 11KV OH 3PH 3W Line with AAAC-100mm²-0.365 KM , 9MTR PSC - 15 No.s Stay -09 No.s, Guarding -01no. 9Mtr long 330kg PSC pole (Stud) |
| 35 | Base Plate for PSC Pole |
| 36 | Straight Cross Arm Channel 100X50X5mm, 9.56KG/Mtr., each channel length 1.2 mtr. |
| 37 | Straight Cross Arm Top Channel 100X50X5mm,9.56 KG/mtr, each channel length 0.306 Mtr. |
| 38 | Fish Plate 50X8 mm., 0.97kg/Mtr., each 0.280 mtr.Length |
| 39 | Danger Plate, 1 no |
| 40 | Back Clamp for danger Plate 25X3 mm. flat,0.59Kg/Mtr. Flat of 0.510mtr 1 no |
| 41 | GI barbed wire anticlimbing device 3 Kg. Persupport |
| 42 | Back Clamp for anticlimbing device 25X3mm.flat, 0.59Kg/Mtr. Flat of 0.510 mtr length 4 no's |
| 43 | 11kV,5kN pin insulator polymer |
| 44 | 11kV V cross Arm (GI) |
| 45 | GI Back Clamp for 11kV 'V' Cros Arm |
| 46 | Top bracket 100X50X5mm GI channel |
| 47 | H W fitting(B&S) 70KN, 3Bolt |
| 48 | Disc insulator (B&S) 70 KN polymer |
| 49 | Earthing of Support ( Coil Type ) |
| 50 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr.For connecting pole with Coil earthing |
| 51 | PG Clamp for 100 mm2 AAAC conductor |
| 52 | GI Nut , Bolt & Washer of different sizes |
| 53 | H.T. Stay clamp |
| 54 | H.T. Stay set (Complete ) |
| 55 | H.T. Stay Insulator |
| 56 | 7/10 SWG Stay Wire |
| 57 | 100mm2 All Alloy Aluminium Conductor-AAAC |
| 58 | Black Paint |
| 59 | Yellow Colour Paint for Background |
| 60 | Guarding cross arm of 75X40X4.8mm GI Channel 1.7 mtr long 4Nos @7.14Kg/mtr |
| 61 | No. 10 GI wire cross lacing (0.08Kg/mtr) |
| 62 | No. 8 GI wire cross lacing (0.131Kg/mtr) |
| 63 | No-6 G I wire (Dia 4.8mm) (0.182kg/mtr) |
| 64 | Eye hook |
| 65 | GI Nut , Bolt & Washer of different sizes |
| 66 | G.I pipe Earthing 40 mm dia mediumgauge(3.25mm thick ness) 3 mtr |
| 67 | 25x6 mm GI flat for earthing |
| 68 | Sunderies |
| 69 | Civil ServiceCement concreting for stay anchor plate withC.C. 1:2:4, 0.2 Cum @ 6177.92/- |
| 70 | Concreting of 8/9Mtr Poles in ratio 1:1.5:3=0.375Cum. @6648.85 |
| 71 | Couping of support in ratio C.C. 1:1.5:3, 0.1125Cum |
| 72 | Material for earthing including masonary workfor earth pit, and cement plate cover with salt,charcoal etc. |
| 73 | GIS Services |
| 74 | Dismantling of 9/8m PAC Poles |
| 75 | Dismantling 80-100 sqmm AAAC Conductor |
| 76 | ESTIMATE FOR SHIFTING OF 11KV AGRICULTURE LINE DUE TO ROAD WIDENING WORK OF SIKIRI- NUAGAON PWD ROAD UNDERELECTRICAL SECTION HINJLICUT (SKECH-III: GIRI TO ALLAPUR ROAD) Part- I: Erection of 11KV OH 3PH 3W Line with AAAC-100mm²-0.83 KM , 9MTR PSC -21No.s , Stay -08 No.s, Guarding -01no.9Mtr long 330kg PSC pole (Stud) |
| 77 | Base Plate for PSC Pole |
| 78 | Straight Cross Arm Channel 100X50X5mm, 9.56KG/Mtr., each channel length 1.2 mtr. |
| 79 | Straight Cross Arm Top Channel 100X50X5mm,9.56 KG/mtr, each channel length 0.306 Mtr. |
| 80 | Fish Plate 50X8 mm., 0.97kg/Mtr., each 0.280 mtr.Length |
| 81 | Danger Plate, 1 no |
| 82 | Back Clamp for danger Plate 25X3 mm. flat,0.59Kg/Mtr. Flat of 0.510mtr 1 no |
| 83 | GI barbed wire anticlimbing device 3 Kg. Persupport |
| 84 | Back Clamp for anticlimbing device 25X3mm.flat, 0.59Kg/Mtr. Flat of 0.510 mtr length 4 no's |
| 85 | 11kV,5kN pin insulator polymer |
| 86 | 11kV V cross Arm (GI) |
| 87 | GI Back Clamp for 11kV 'V' Cros Arm |
| 88 | Top bracket 100X50X5mm GI channel |
| 89 | H W fitting(B&S) 70KN, 3Bolt |
| 90 | Disc insulator (B&S) 70 KN polymer |
| 91 | Earthing of Support ( Coil Type ) |
| 92 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr.For connecting pole with Coil earthing |
| 93 | PG Clamp for 100 mm2 AAAC conductor |
| 94 | GI Nut , Bolt & Washer of different sizes |
| 95 | H.T. Stay clamp |
| 96 | H.T. Stay set (Complete ) |
| 97 | H.T. Stay Insulator |
| 98 | 7/10 SWG Stay Wire |
| 99 | 100mm2 All Alloy Aluminium Conductor-AAAC |
| 100 | Black Paint |
| 101 | Yellow Colour Paint for Background |
| 102 | Guarding cross arm of 75X40X4.8mm GI Channel 1.7 mtr long 4Nos @7.14Kg/mtr |
| 103 | No. 10 GI wire cross lacing (0.08Kg/mtr) |
| 104 | No. 8 GI wire cross lacing (0.131Kg/mtr) |
| 105 | No-6 G I wire (Dia 4.8mm) (0.182kg/mtr) |
| 106 | Eye hook |
| 107 | GI Nut , Bolt & Washer of different sizes |
| 108 | G.I pipe Earthing 40 mm dia mediumgauge(3.25mm thick ness) |
| 109 | 25x6 mm GI flat for earthing |
| 110 | Sunderies |
| 111 | Civil ServiceCement concreting for stay anchor plate withC.C. 1:2:4, 0.2 Cum @ 6177.92/- |
| 112 | Concreting of 8/9Mtr Poles in ratio 1:1.5:3=0.375Cum. @6648.85 |
| 113 | Couping of support in ratio C.C. 1:1.5:3, 0.1125Cum |
| 114 | Material for earthing including masonary workfor earth pit, and cement plate cover with salt,charcoal etc. |
| 115 | GIS Services |
| 116 | Dismantling of 9/8m PAC Poles |
| 117 | Dismantling 80-100 sqmm AAAC Conductor |
| 118 | ESTIMATE FOR SHIFTING OF 11KV AGRICULTURE LINE DUE TO ROAD WIDENING WORK OF SIKIRI- NUAGAON PWD ROAD UNDER ELECTRICALSECTION HINJLICUT (SKECH-IV: ALLAPUR ROAD) Part- I: Erection of 11KV OH 3PH 3W Line with AAAC-100mm²-0.58 KM , 9MTR PSC -12No.s , Stay -03.9Mtr long 330kg PSC pole (Stud) |
| 119 | Base Plate for PSC Pole |
| 120 | Straight Cross Arm Channel 100X50X5mm, 9.56KG/Mtr., each channel length 1.2 mtr. |
| 121 | Straight Cross Arm Top Channel 100X50X5mm,9.56 KG/mtr, each channel length 0.306 Mtr. |
| 122 | Fish Plate 50X8 mm., 0.97kg/Mtr., each 0.280 mtr.Length |
| 123 | Danger Plate, 1 no |
| 124 | Back Clamp for danger Plate 25X3 mm. flat,0.59Kg/Mtr. Flat of 0.510mtr 1 no |
| 125 | GI barbed wire anticlimbing device 3 Kg. Persupport |
| 126 | Back Clamp for anticlimbing device 25X3mm.flat, 0.59Kg/Mtr. Flat of 0.510 mtr length 4 no's |
| 127 | 11kV,5kN pin insulator polymer |
| 128 | 11kV V cross Arm (GI) |
| 129 | GI Back Clamp for 11kV 'V' Cros Arm |
| 130 | Top bracket 100X50X5mm GI channel |
| 131 | H W fitting(B&S) 70KN, 3Bolt |
| 132 | Disc insulator (B&S) 70 KN polymer |
| 133 | Earthing of Support ( Coil Type ) |
| 134 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr.For connecting pole with Coil earthing |
| 135 | PG Clamp for 100 mm2 AAAC conductor |
| 136 | GI Nut , Bolt & Washer of different sizes |
| 137 | H.T. Stay clamp |
| 138 | H.T. Stay set (Complete ) |
| 139 | H.T. Stay Insulator |
| 140 | 7/10 SWG Stay Wire |
| 141 | 100mm2 All Alloy Aluminium Conductor-AAAC |
| 142 | Black Paint |
| 143 | Yellow Colour Paint for Background |
| 144 | Civil ServiceCement concreting for stay anchor plate withC.C. 1:2:4, 0.2 Cum @ 6177.92/- |
| 145 | Concreting of 8/9Mtr Poles in ratio 1:1.5:3=0.375Cum. @6648.85 |
| 146 | Couping of support in ratio C.C. 1:1.5:3, 0.1125Cum |
| 147 | GIS Services |
| 148 | Dismantling of 9/8m PAC Poles |
| 149 | Dismantling 80-100 sqmm AAAC Conductor |
| 150 | ESTIMATE FOR SHIFTING OF 11KV SIKIRI FEEDER LINE DUE TO ROAD WIDENING WORK OF SIKIRI- NUAGAON PWD ROAD UNDER ELECTRICALSECTION HINJLICUT (Fig-1 Sikiri to Kharida- Giria Road) Part- I: Erection of 11KV OH 3PH 3W Line with AAAC-80mm²-0.85 KM , 11mtr WPB -21 No.sWPB 160x152 (30.44KG/Mtr.),11 mtr |
| 151 | Straight Cross Arm Channel 100X50X5mm, 9.56KG/Mtr., each channel length 1.2 mtr. |
| 152 | Straight Cross Arm Top Channel 100X50X5mm,9.56 KG/mtr, each channel length 0.306 Mtr. |
| 153 | Fish Plate 50X8 mm., 0.97kg/Mtr., each 0.280 mtr.Length |
| 154 | Danger Plate, 1 no |
| 155 | Back Clamp for danger Plate 25X3 mm. flat,0.59Kg/Mtr. Flat of 0.510mtr 1 no |
| 156 | GI barbed wire anticlimbing device 3 Kg. Persupport |
| 157 | Back Clamp for anticlimbing device 25X3mm.flat, 0.59Kg/Mtr. Flat of 0.510 mtr length 4 no's |
| 158 | 11kV,5kN pin insulator polymer |
| 159 | 11kV V cross Arm (GI) |
| 160 | GI Back Clamp for 11kV 'V' Cros Arm |
| 161 | Top bracket 100X50X5mm GI channel |
| 162 | H W fitting(B&S) 70KN, 3Bolt |
| 163 | Disc insulator (B&S) 70 KN polymer |
| 164 | Earthing of Support ( Coil Type ) |
| 165 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr.For connecting pole with Coil earthing |
| 166 | PG Clamp for 100 mm2 AAAC conductor |
| 167 | GI Nut , Bolt & Washer of different sizes |
| 168 | H.T. Stay clamp |
| 169 | H.T. Stay set (Complete ) |
| 170 | H.T. Stay Insulator |
| 171 | 7/10 SWG Stay Wire |
| 172 | 80mm2 All Alloy Aluminium Conductor-AAAC |
| 173 | Black Paint |
| 174 | Yellow Colour Paint for Background |
| 175 | Sunderies |
| 176 | Part-II: Erection of LT line with 3x50+1x35+1x16 mm2 LT XLPE ABC-360mtr, With HT/LT & 8Mtr PSC 2No.s , LT Stay-2 No.8Mtr long PSC Pole |
| 177 | RCC Base plate |
| 178 | 3x50+1x35+1x16 mm2 LT XLPE ABC |
| 179 | LT Stay Set (Complete) |
| 180 | LT Stay Insulator |
| 181 | LT Stay Clamp |
| 182 | 7/12 SWG GI stay wire |
| 183 | Suspension clamp with Eye hook |
| 184 | Dead End Clamp suitable for XLPE Cable |
| 185 | Pole clamp for Eye Hook (For AB Cable) |
| 186 | insulated piercing connector type-A main 16-95mm2 & tap 2.5 to 10 sqmm |
| 187 | insulated piercing connector type-B main 16-95mm2 & tap 2.5 to 10 sqmm |
| 188 | Danger Plate, 1 no |
| 189 | Back Clamp for danger Plate 25X3 mm. flat,0.59Kg/Mtr. Flat of 0.510mtr 1 no |
| 190 | GI barbed wire anticlimbing device 3 Kg. Persupport |
| 191 | Back Clamp for anticlimbing device 25X3mm.flat, |
| 192 | Earthing Support (Coil Type) |
| 193 | G.I. Nuts and Bolts |
| 194 | Sunderies (Al Binding tape,Insulation tape, GISNumbering, etc.) |
| 195 | Civil ServiceCement concreting for stay anchor plate withC.C. 1:2:4, 0.2 Cum @ 6177.92/- |
| 196 | Concreting of 8/9Mtr Poles in ratio 1:1.5:3=0.375Cum. @6648.85 |
| 197 | Concreting of support C.C. 1:1.5:3, 0.45 Cum. @6648.85/- for 11 Mtr. Joist Pole/WPB |
| 198 | Couping of support in ratio C.C. 1:1.5:3, 0.1125Cum |
| 199 | GIS Services |
| 200 | Dismantle of RSJ/WPB pole 9/11 Mtr. |
| 201 | Dismantling of 9/8m PAC Poles |
| 202 | Dismantling 80-100 sqmm AAAC Conductor |
| 203 | Dismantle-LT AB Cable with acces |
| 204 | Dismantling of Steel Structure |
| 205 | ESTIMATE FOR SHIFTING OF 11KV SIKIRI FEEDER LINE DUE TO ROAD WIDENING WORK OF SIKIRI- NUAGAON PWD ROAD UNDER ELECTRICAL SECTION HINJLICUT (Fig-2 Giria Village) Part-I: Erection of LT line with 3x50+1x35+1x16 mm2 LT XLPE ABC-245mtr, 8Mtr PSC 8No.s8Mtr long PSC Pole |
| 206 | RCC Base plate |
| 207 | 3x50+1x35+1x16 mm2 LT XLPE ABC |
| 208 | Suspension clamp with Eye hook |
| 209 | Dead End Clamp suitable for XLPE Cable |
| 210 | Pole clamp for Eye Hook (For AB Cable) |
| 211 | insulated piercing connector type-A main 16-95mm2 & tap 2.5 to 10 sqmm |
| 212 | insulated piercing connector type-B main 16-95mm2 & tap 2.5 to 10 sqmm |
| 213 | Danger Plate, 1 no |
| 214 | Back Clamp for danger Plate 25X3 mm. flat,0.59Kg/Mtr. Flat of 0.510mtr 1 no |
| 215 | GI barbed wire anticlimbing device 3 Kg. Persupport |
| 216 | Back Clamp for anticlimbing device 25X3mm.flat, |
| 217 | Earthing Support (Coil Type) |
| 218 | G.I. Nuts and Bolts |
| 219 | Sunderies (Al Binding tape,Insulation tape, GISNumbering, etc.) |
| 220 | Civil ServiceConcreting of 8/9Mtr Poles in ratio 1:1.5:3=0.375Cum. @6648.85 |
| 221 | Couping of support in ratio C.C. 1:1.5:3, 0.1125Cum |
| 222 | GIS Services for LT |
| 223 | Dismantling of 9/8m PAC Poles |
| 224 | Dismantle-LT AB Cable with acces |
| 225 | ESTIMATE FOR SHIFTING OF 11KV SIKIRI FEEDER LINE DUE TO ROAD WIDENING WORK OF SIKIRI- NUAGAON PWD ROAD UNDER ELECTRICAL SECTION HINJLICUT (Fig-3 Giria to Allapur Road) Part- I: Erection of 11KV OH 3PH 3W Line with AAAC-80mm²-0.3 KM , 11mtr WPB -2No.s ,9mtr PSC-04 No., Stud -01No.,HT Stay-02 No,sWPB 160x152 (30.44KG/Mtr.),11 mtr |
| 226 | 9Mtr long 330kg PSC pole |
| 227 | 9Mtr long 330kg PSC pole (Stud) |
| 228 | Base Plate for PSC Pole |
| 229 | Straight Cross Arm Channel 100X50X5mm, 9.56KG/Mtr., each channel length 1.2 mtr. |
| 230 | Straight Cross Arm Top Channel 100X50X5mm,9.56 KG/mtr, each channel length 0.306 Mtr. |
| 231 | Fish Plate 50X8 mm., 0.97kg/Mtr., each 0.280 mtr.Length |
| 232 | Danger Plate, 1 no |
| 233 | Back Clamp for danger Plate 25X3 mm. flat,0.59Kg/Mtr. Flat of 0.510mtr 1 no |
| 234 | GI barbed wire anticlimbing device 3 Kg. Persupport |
| 235 | Back Clamp for anticlimbing device 25X3mm.flat, 0.59Kg/Mtr. Flat of 0.510 mtr length 4 no's |
| 236 | 11kV,5kN pin insulator polymer |
| 237 | 11kV V cross Arm (GI) |
| 238 | GI Back Clamp for 11kV 'V' Cros Arm |
| 239 | Top bracket 100X50X5mm GI channel |
| 240 | H W fitting(B&S) 70KN, 3Bolt |
| 241 | Disc insulator (B&S) 70 KN polymer |
| 242 | Earthing of Support ( Coil Type ) |
| 243 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr.For connecting pole with Coil earthing |
| 244 | PG Clamp for 100 mm2 AAAC conductor |
| 245 | GI Nut , Bolt & Washer of different sizes |
| 246 | H.T. Stay clamp |
| 247 | H.T. Stay set (Complete ) |
| 248 | H.T. Stay Insulator |
| 249 | 7/10 SWG Stay Wire |
| 250 | 80mm2 All Alloy Aluminium Conductor-AAAC |
| 251 | Black Paint |
| 252 | Yellow Colour Paint for Background |
| 253 | Sunderies |
| 254 | Civil ServiceCement concreting for stay anchor plate withC.C. 1:2:4, 0.2 Cum @ 6177.92/- |
| 255 | Concreting of 8/9Mtr Poles in ratio 1:1.5:3=0.375Cum. @6648.85 |
| 256 | Concreting of support C.C. 1:1.5:3, 0.45 Cum. @6648.85/- for 11 Mtr. Joist Pole/WPB |
| 257 | Couping of support in ratio C.C. 1:1.5:3, 0.1125Cum |
| 258 | GIS Services |
| 259 | Dismantle of RSJ/WPB pole 9/11 Mtr. |
| 260 | Dismantling of 9/8m PSC Poles |
| 261 | Dismantling 80-100 sqmm AAAC Conductor |
| 262 | Dismantling of Steel Structure Please Enable Macros to View BoQ information |