|
| 1 | PART 1 –Operations & Maintenance of Software along with development/ configuration/ customization of LMS modules |
| 2 | Annual Support Services for Year 1 |
| 3 | Annual Support Services for Year 2 |
| 4 | Annual Support Services for Year 3 |
| 5 | Annual Support Services for Year 4 |
| 6 | Annual Support Services for Year 5 |
| 7 | Note: 1. The above mentioned Operations & Comprehensive Maintenance cost is inclusive of integration of LMS with other applications like Enterprise Dashboard/ MIS, SAP, i3MS.2. It includes all the modules of LMS as part of Sow defined in Clause 3.1.16 excluding the new developments. |
| 8 | PART 2 –Comprehensive Annual Maintenance (CAM) of Existing Hardware |
| 9 | Comprehensive Annual Maintenance of Existing Hardware for Year 1 |
| 10 | Comprehensive Annual Maintenance of Existing Hardware for Year 2 |
| 11 | Comprehensive Annual Maintenance of Existing Hardware for Year 3 |
| 12 | Comprehensive Annual Maintenance of Existing Hardware for Year 4 |
| 13 | Comprehensive Annual Maintenance of Existing Hardware for Year 5 |
| 14 | Note: 1. The bidder has to submit the breakup of Part-2 in PDF Format available in the e-procurement portal (The Pdf File should be uploaded only in the Financial bid Section. The bid may be rejected if it is uploaded in Techno-commercial bid.2. Year wise Price break up in the pdf Format shall be same as quoted in PART-2 of this Price bid (Year wise Comprehensive annual Maintenance Charges) |
| 15 | PART 3 –Development Charges for new modules of Software: |
| 16 | Charges of development including its integration with LMS for Customization at Weighbridges through AI Solution |
| 17 | Charges of development including its integration with LMS for AI based violation detection |
| 18 | Charges of development including its integration with LMS for Geofencing for Stockyard Operations |
| 19 | Man-days rate for any future customization/ development (CR) after go-live |
| 20 | Additional future Integration required with i3ms |
| 21 | Additional future integration required with SAP system |
| 22 | PART 4 – Charges for supply &Installation of New HardwareSupply & installation of following items should include comprehensive warranty for five years or till Completion of the Contract including extensions, if any whichever is earlier |
| 23 | Integrated RFID Reader and Antenna |
| 24 | Cantilever for RFID with foundation |
| 25 | Fixed CCTV Camera |
| 26 | Dome Camera |
| 27 | PTZ Camera |
| 28 | 10-meter pole for PTZ camera with foundation |
| 29 | Automatic Boom Barrier Gate at Entry |
| 30 | WB Controller |
| 31 | L2 Industrial Grade switch |
| 32 | Online 2 KVA UPS with 1 Hour back up |
| 33 | Junction Box |
| 34 | Monitor, Mouse, QWERTY Keyboard |
| 35 | 2D barcode Scanner |
| 36 | Cabling, earthing, surge protection arrangement |
| 37 | Public Address (PA)- Amplifier |
| 38 | Public Address (PA) speaker |
| 39 | 2 Mtr MS painted pole with foundation for mounting LED Display Board |
| 40 | Traffic Lights with Pole |
| 41 | SVDS System |
| 42 | Online 1 KVA UPS with 1 Hour back up |
| 43 | Cantilever Pole (SVD Area) With foundation |
| 44 | Network Storage including 200 TB Enterprise HDD |
| 45 | Camera License for Video Management System-for 130 cameras |
| 46 | QR code Reader |
| 47 | LED Display Board |
| 48 | Aerial OFC in meters - (All dielectric self-sustaining cable) 24 Cores |
| 49 | Splice Enclosure |
| 50 | RCC Poles including consists of Precast Pole, Foundation, Support wires, Pole Mounted Cable Support and Support wire foundation |
| 51 | Thermal Printer |
| 52 | Firewall |
| 53 | Joystick for CCTV |
| 54 | NVR Server for CCTV |
| 55 | PA Central Console |
| 56 | Parking Controller |
| 57 | LMS Servers |
| 58 | UPS - 10KVA (N+1) |
| 59 | Video Wall- 2X2 Matrix LED Video wall each cube of 50 inches |
| 60 | Network Switch-L3 |
| 61 | Lightening Arrester |
| 62 | Chemical Earthing |
| 63 | Surge Protection Device |
| 64 | PART 5 – Cloud Hosting |
| 65 | Cloud hosting charge in Year 1 |
| 66 | Cloud hosting charge in Year 2 |
| 67 | Cloud hosting charge in Year 3 |
| 68 | Cloud hosting charge in Year 4 |
| 69 | Cloud hosting charge in Year 5 |
| 70 | PART 6 – Deployed Manpower |
| 71 | Annual Manpower Charges for Year 1 including Team Lead |
| 72 | Annual Manpower Charges for Year 2 including Team Lead |
| 73 | Annual Manpower Charges for Year 3 including Team Lead |
| 74 | Annual Manpower Charges for Year 4 including Team Lead |
| 75 | Annual Manpower Charges for Year 5 including Team Lead Please Enable Macros to View BoQ information |