|
| 1 | Supply installation testing and commissioning of fresh 11kv C.T by way of replacement of damaged / burnt out 11 KV C.T of same ratio type, make and class already installed in panel confirming to IEC 60044-1-2000 standards suitable for 11 KV VCB panels of make already installed at receiving stations. |
| 2 | Supply installation testing and commissioning of 11kv PT by way of replacement of damaged / burnt out 11 KV P.T of same ratio type, make and class already installed in panel confirming to IEC 60044-1-2000 standards suitable for 11 KV VCB panels of make already installed at receiving stations. |
| 3 | Supply installation testing and commissioningof Espout bushing for 11 kv vcb panel by way of replacement of damaged / burnt out 11 KV Espout bushing of same type, make and class already installed in panel confirming to IEC 60044-1-2000 standards suitable for 11 KV VCB panels of make already installed at receiving stations. |
| 4 | Supply installation testing and commissioning of 11kv bush with rods for 11 KV VCB panels by way of replacement of damaged / burnt out 11 KV bush with rods of same type, make and class already installed in panel confirming to IEC 60044-1-2000 standards suitable for 11 KV VCB panels of make already installed at receiving stations. |
| 5 | Supply installation testing and commissioning of 11kv vacuum interruptor by way of replacement of damaged / burnt out 11 KV Vaccum interruptor of same composition , type, make already installed in 11KV VCB panel for 11 KV VCB panels of make already installed at receiving stations. |
| 6 | Supply installation testing and commissioning of tripping coils (36V) by way of replacement of damaged / burnt out tripping coil of same composition, type , make already installed in 11 KV VCB Panel of make already installed at receiving stations. |
| 7 | Supply installation testing and commissioning of 11kv vacuum interruptor housing assembly by way of replacement of damaged / burnt out one of same composition, type , make already installed in 11 KV VCB Panel of make already installed at receiving stations. |
| 8 | Providing and installation , testing and commissioning of 11kv G.O set 600amp heavy duty (with earthing blade) conforming to latest version IS-9921 (Part-I to V) with earthing blade by way of relacement of damaged one. |
| 9 | Providing and fixing, installing, testing and commissioning of 11kv isolator 630 Amp conforming to IS 9921/IEC-129 without standard earthing blades. |
| 10 | Providing installation testing and commissioning of winding /oil temperature meter by way of replacement of damaged one suitable for 33/11 KV, 10 MVA / 6.3 MVA / 5.0 MVA power transformers. |
| 11 | Supply installation testing and commissioning of 11kv cable termination kit (Indoor / Outdoor type) 3M or Raychem suitable for Xipe Power cable. 120mm 3 core |
| 12 | Repairing of Re-setting links of 11kv VCB panel |
| 13 | Repairing of operating shaft of 11kv VCB Panel |
| 14 | Repairing of shower contact of 11kv VCB panel |
| 15 | Repairing of isolating socket of 11kv VCB panel |
| 16 | Repairing of High tension spring of 11kv VCB panel |
| 17 | Repairing of Tripping shaft of 11kv VCB panel |
| 18 | Repairing of latch assembly of 11kv VCB panel |
| 19 | Repairing of Gear assembly of 11kv VCB panel |
| 20 | Repairing of Tripping mechanism of 11kv VCB panel |
| 21 | Repairing of Spring chargh motor assembly of 11KV VCB panel |
| 22 | Panel control rewiring with 2.5 Sqmm flexible wire conneting ribs, bunching wire ,ferruling, thimbling etc |
| 23 | Supply installation testing and commissioning of Auxilary relay 30A by way of replacement of damaged / burnt out Auxilary relay 30A of same composition, type , make already installed in 11 KV VCB Panel of make already installed in receiving stations. |
| 24 | Supply installation testing and commissioning of Aux switch by way of replacement of damaged / burnt out Auxilary Switch of same composition, type. class and make already installed in panel. |
| 25 | Supply installation testing and commissioning of Trip circuit supervision relay by way of replacement of damaged / burnt out trip circuit supervision relay of same composition, type. class and make already installed in panel. |
| 26 | Repair and installation of ACB mechanical part 1600amp |
| 27 | Providing installation testing and commissioning of Numerical /Digital relay by way of replacement of damaged / burnt out of same ration (A.C & D.C) type , make and class already installed in panel. All relays shall conform to the requirement of IS:3231/IEC-60255 and IEC-61850 of (MIT 113 ER/ Ashida 141A). Operating voltage 30-36 Volts. |
| 28 | Supply installation testing and commissioning of Master trip relay 24-50 V by way of replacement of damaged / burnt out of same, type , make already installed in 11 KV VCB Panel. |
| 29 | Providing and fixing of CT ring type for LT panels. Please Enable Macros to View BoQ information |