| 1 | Part A: Power Transformer |
| 2 | Labour Charges includes unloading at firm's works, detanking/deassembling for assesment of damages, re-assembling, re-fitting of coils, parts to be replaced and tanking up of core , testing complete job & loading at firms works for dispatch |
| 3 | 6.3MVA |
| 4 | 10MVA |
| 5 | Re- conditioning of HV/LV leg coil copper |
| 6 | Supply and Fabrication of New HV/LV copper conductor (base rate of copper to be fixed and final applicable rate as per IEEMA |
| 7 | Providing of High density Permali wood (30mm thickness ) |
| 8 | Providing of New insulating press board |
| 9 | Providing of Fresh EHV Grade transformer Oil |
| 10 | Cleaning & spray painting of tank, radiators, conservator , tap changer, marshalling box etc. with one coat of primer & two coats of approved paint and inside the tank with epoxy paint. |
| 11 | 6.3MVA |
| 12 | 10MVA |
| 13 | Providing of core laminations |
| 14 | Providing of sundry items |
| 15 | 6.3MVA |
| 16 | 10MVA |
| 17 | Providing of 36 KV HV Bushing |
| 18 | Providing of 12 KV LV Bushing |
| 19 | Providing of 36 KV HV Bush Rod |
| 20 | Providing of 12 KV LV Bush Rod |
| 21 | Providing of C.I clamp for HV Bushing |
| 22 | Providing of C.I clamp for LV Bushing |
| 23 | Providing of Arcing Horn Assembly for 33/11KV Bushing |
| 24 | Providing of Phase separator with insulation between coil |
| 25 | Providing of Buchholz relay (with alarm & trip contact) |
| 26 | Providing of Radiator valve |
| 27 | Providing Oil level gauge in conservator |
| 28 | Providing of Oil Temperature Indicator (with alarm & trip contact) |
| 29 | Providing of Winding Temperature Indicator (with alarm & trip contact) |
| 30 | Repairing of tank by way of complete assessment of all leakages and repair of same by way of welding etc. |
| 31 | Replacement of dammaged Radiator for 10MVA6.3MVA/5MVA Power Transformer |
| 32 | Providing of magnetical guage |
| 33 | Repairing of Conservator , marshalling box |
| 34 | Filtration of Transformers Oil if reusable |
| 35 | Providing of set of Gasket for |
| 36 | 6.3MVA |
| 37 | 10MVA |
| 38 | Providing of oil filter valve |
| 39 | Providing of air release plug |
| 40 | Providing of pressure relief valve |
| 41 | Providing of oil drain valve |
| 42 | Providing of OFF Load Tap Changer |
| 43 | Repairing of OFF Load Tap Changer |
| 44 | Providing of ON Load Tap Changer |
| 45 | Repairing of ON Load Tap Changer |
| 46 | Re-conditioning of Silica gel |
| 47 | Providing of Silica gel |
| 48 | Heat Treatment (to be applied till desired values are acheived) |
| 49 | Hot oil bath of power transformer incl. flushing out of sludge, carbon deposits from whole power transformer incl. core conductor radiator transformer tank valves etc. |
| 50 | Scrap old copper conductor |
| 51 | Scrap old / carbonized transformer oil |
| 52 | Scrap Red Iron Ms iron and Brass parts |
| 53 | Scrap core material. |
| 54 | Part B: Hnadling of Power Transformer |
| 55 | Disconnecting of (10/6.3/5MVA) Power Transformer from Circuit including dismantling of its accessories complete job (Including shifting of power cables/control cables as and when required as per site requirement and then relaying of same back to its original postion) |
| 56 | Loading of Power Transformer from substation bed to the platform of truck i/c manual dragging, rotation etc (if any required) (Complete Job) |
| 57 | 10 MVA |
| 58 | 6.3MVA |
| 59 | Unloading of Power Transformer from the platform truck to receiving station bed i/c manual dragging, rotation etc (if any required) (Complete Job) |
| 60 | 10 MVA |
| 61 | 6.3MVA |
| 62 | Carriage of Power Transformer upto 5km |
| 63 | 10 MVA |
| 64 | 6.3MVA |
| 65 | Carriage of Power Transformer (10/6.3/5MVA) beyond 5km upto 10km |
| 66 | Carriage of Power Transformer(10/6.3/5MVA) beyond 10km upto 20km |
| 67 | Carriage of Power Transformer (10/6.3/5MVA) beyond 20km |
| 68 | Installation, testing & commissioning of (10/6.3/5MVA) Power Transformer ( including assembly viz fixing of bushes, radiators, fans (if any), thermometer, wiring of instruments etc. ) Complete Job (Including shifting of power cables/control cables as and when required as per site requirement and then relaying of same back to its original postion) Please Enable Macros to View BoQ information |