| 1 | Excavation in hilly area in all heights and depths in all kinds of soil by manual /mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiselling/wedging out of rock (where blasting is prohibited ) and other intermediate classification of soil setting out true to the required line, graded width cutting and trimming of side slopes and level as shown on the drawing and as directed by the Engineer-in-Charge at site according to the M.O.R.D Technical Specification Clause 300,1603.1,1603.2, sorting out useful material and stacking the same in all leads and lifts in acquired width of the road and transportation of useful material for filling in road way, camber ,embankments for grade improvements and disposal of all un-useful materials to required width of the road or on approved dumping sites, through all modes of transportation including head load or animals transport or mechanical means, along with its levelling fine dressing .and carriage of machineries, materials tools equipments and safety means and other incidentals necessary to complete the work by mechanical means and/or labour if required. All useful materials such as stone, shingles, aggregates, sand and slates shall be sorted out and stacked along road side which shall not be less than 1/3 (One third) for blasting work hard rock 1/6th (One sixth) blasting work soft rock 1/10th (one 10th) jumper work in all cases failing which recovery shall be effected on the prevailing market rates. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the entire Contractor which shall have to be duly compensated by him in all cases as per direction of the Engineer-in-Charge including carriage of material within all leads and lifts. The rate including octroi, royalty, Malkana, toll tax sale tax or other taxes imposed by the Government.A recovery of useful stones 63.82 cum. metre @ Rs. 300/- Per cubic metre shall be done on pro-rata basis in each running bill for this item .Any loos to the public and private property during the course of excavation shell be resorted by the controctor what so ever the nature of the same may be. The servicable material will be stacked out specified/ dimension in all leads and lift as per the direction of Engineer in charge. |
| 2 | Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1 with in all leads and lifts as per directed by the Engineer-in-Change |
| 3 | Earthwork in excavation for structures as per as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. with in all leads and lifts as per directed by the Engineer-in-Change |
| 4 | Plain/reinforced cement concrete (1:6:12) in open foundation complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203 within all leads and lifts as per directions of Engineer in charge |
| 5 | Plain/reinforced cement concrete (1:4:8) in open foundation complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203 within all leads and lifts as per directions of Engineer in charge |
| 6 | Randon Rubble Stone masonary in cement mortar 1:6 (1 Cement : 6 sand) for foundation complete as as per drawings and technical specification Clauses 702, 704,1202 and 1203 including carriage of material within all leadsa and lifts as per directions of Engineer in charge |
| 7 | Dry masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. |
| 8 | Providing and laying of Stone filling behind R/wall and wing wall and return walls with granular material complete as per MORD technical specification clause 1204.3.8 as directed by the Engineer-in-Change |
| 9 | Preparation of sub grade by dressing to combor(Earth work for the cutting involved for sub-grade to be paid for separately depending upon the classification of soil completed as per HPPWD specification. |
| 10 | Consolidation of sub grade with roller including making good the undulation etc.with earth or quarry soil etc. and rerolling the sub-grade completed as per HPPWD Specification. |
| 11 | Stone soling properly hand-packed filling interstices with spalls and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification 230mm spread thickness(finished work including materials and ladour) Please Enable Macros to View BoQ information |