| 1 | Item No.1:- Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete |
| 2 | Item No. 2:- Excavation for foundation in soft rock including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete. |
| 3 | Item No.3:- Excavation for foundation in hard rock by blasting including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete. |
| 4 | Item No.4:- Providing and laying in situ / ready mix / ready mix M15 CC of trap/ granite /quartzite /gneiss metal for the bottom plugs of wells in the dry condition including compaction and curing wherever necessary etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand) |
| 5 | Item No.5:- Providing and laying Cast in situ/Ready Mix cement concrete in M-20 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including centering, formwork, cover blocks, laying/pumping, compacting , curing , finishing and rougheningthem if special finish is to be provided and curing complete.(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality |
| 6 | Item No.6:- Providing and laying in situ/ready mix M-25 controlled cement concrete of trap/granite/quartzite/gneiss metal for RCC work in solid/deck slab etc. including ramming, vibrating, curing, formwork, centering and finishing in cement plaster excluding reinforcement etc. complete.(with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant/pan mixer and fine agreegates of required specifications(VSI sand finely washed etc) i) Height up to 5 m, normal rate. ii) Height 5 to 7.50 m, add 5 percent extra over basic rate. iii) Height 7.50 to 10 m, 7.50 percent extra. iv) Over 10m Height, add 10 percent extra for every 2.50m rise. (Item No. 14.15) |
| 7 | Item No.7:- Providing cast in situ/ready mix M20 grade cement concrete for head walls of CD work/retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete.(with reversible drum type mixer/concrete batch mix plant(pan mixer) with SCADA ( |
| 8 | Item No.8:- Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete. |
| 9 | Item No.9:- Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 450mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. |
| 10 | Item No.10:- Back filling behind abutment, wing wall and return wall as per drawings and technical specifications etc. complete. (by granular material) |
| 11 | Item No.11:- Providing and laying weep holes of 100 mm diameter AC/PVC pipes as per drawing for abutment returns, return walls etc. Complete. |
| 12 | Item No.12:- Providing earth work in embankment with approved materials obtained from departmental land upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etc. complete.(Material obtained from departmental Land) |
| 13 | Item No.13:- Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) |
| 14 | Item No.14:- Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 15 | Item No 15:- Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 16 | Item No 16:- Providing and laying in-situ M 20 Grade unreinforced plain cement concrete pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant/ non tilting mixer and Weigh batcher as per approved mix design, admixtures, transporting to site, spreading, laying compacting and finished in a continuous operation, finishing to lines and grades as directed by Engineer-in-charge and curing by curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. |
| 17 | Item No 17:- Providing dry rubble stone pitching 23 cm (about 9 ) thick including all material, quarry spalls, labour etc. complete. |
| 18 | Item No.18:- Providing and fixing 60 cm x 45 cm Marble plate engraving 10 cm. height letter, figures including painting the lefters/figures with approved colour and shade complete |
| 19 | Item No 19:- Quality Control testing charges for STEEL BAR TESTING Above 16 mm (Set of 3 Bars) |
| 20 | Item No 20:- Quality control testing charges (compressive strength og c.c. cube (set of 3 cubes) |
| 21 | Item No 21:- Concrete Mix Design ( With All Test On Basic Materials ) |
| 22 | Item No 22 :- Reimbrsement of royalty charges if contractor provides orignal royalty challan from revenue department. Sand |
| 23 | Item No 23 :- Reimbrsement of royalty charges if contractor provides orignal royalty challan from revenue department. Rubble |
| 24 | Item No 24 :- Add 18 % For GST Charges |
| 25 | Item No .25 :- Add 1 % For Labour Insurance Charges |
| 26 | Item No 26:- Add 1 % For SQM Charges Please Enable Macros to View BoQ information |