| 1 | Solar power pack for Net Metering |
| 2 | Supplying, installing, testing and commissioning of 15 kWp ON-GRID Solar PV System / Plant consisting Solar PV Mono/ Poly Crystalline Panel of total 15 kW capacity and Solar ON- GRID Inverter of similar capacity (THD<3%) with interconnecting wires / cables up to solar ON GRID inverter, proper base plate, canopy box to house Inverter and necessary accessories i.e. ACDB/DCDB, MCB etc. wiring up to solar Inverter in casing and capping, display board, sign board, two distinct earthing, lightning arrester, liaisoning charges, remote monitoring system with maintaining card/chip for 5 years including net charges for RMS System, complete up to net meter installation and export to the grid with 5 year ON-SITE warranty and fully comprehensive maintenance contract as per Specification no. ESD-RT-ONG (PWD Electrical CSR 22-23 | N 4-5-4) |
| 3 | Additional kW Capacity of ON-GRID Solar PV System / Plant (PWD Electrical CSR 22-23 | N 4-5 Note 1 Page No 79) |
| 4 | Cable for Solar power pack |
| 5 | Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 16sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid inprovided trench/ pipe as per specification no. CB-LT/CU (PWD Electrical CSR 22-23 IN 7-2-34) |
| 6 | STRUCTURE, FENCING & PCC FOR SOLAR PANEL |
| 7 | For structure Providing structural steel work in trusses,other similar trussed purlins and members with all bracing, gusset plates, etc. as per detailed design and drawing or as directed by Engineer-incharge including cutting, fabricating, hoisting, erecting and fixing in position, making riveted / bolted/welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc.complete.(Bd-C- 8/278) (MJP SSR 2023-24 Section F, Item No.6 page no. 46) |
| 8 | For structure Providing and applying material & labour for hot dip galvanizing of above structure including transport for galvanizing as per R.C |
| 9 | FOUNDATION- Making cement concrete foundation including excavation (45 x 45 x 120) cm deep in 1:3:6 cement concrete, 20 to 25 mm stone metal, (45 x 45 x 45) cm /45cm dia. x 45 cm height plinth duly plastered, with necessary curing and finishing complete. (for 6 m pole) |
| 10 | Solar Panel Cleaning |
| 11 | Supplying and installation of Solar PV Module cleaning unit consisting of nozzles spray, necessary pipes, valves, post, electronic panel board concealed with weather proof cabinet, spreading water periodically for removal of dust, related motor pump, controller, timer and nozzles set suitable for covering 5KW Solar PV Module. (Approx. 35 Sq. Mtr, PV Module area). (PWD Electrical CSR 22-23 IN 4-8-8) |
| 12 | For additional kW capacity of Solar PV Module cleaning unit Note For item no. 4-8-8 for additional kW capacity, add Rs. 4000/- for every 5kW.(PWD Electrical CSR 22-23 IN 4-8-8 Note Page No 83) Please Enable Macros to View BoQ information |