| 1 | (40.26) Scraping & Removing of white wash/ distemper/oil paint /algli etc. from lime plaster highly decorative, ornamental and stucco work with at most care by using fine sand paper under the close supervision tokeep intact the old designs. |
| 2 | (40.24) Removing of old lime plaster up to 75 mm thick in patches with heightup to 4.5 m. Disposal up to 100 meter lead |
| 3 | (40.34) De-vegetation from monument by removing bushes, trees including complete uprooting from the wall & roofs/structures carefully including suitable chemical treatment to roots to avoid further growth including disposal of rubbish with in 50 mtr. Lead as per direction ofEngineer in-charge. |
| 4 | (40.22) Tuman masonry by brick bats/ stones in grinded mortar of Lime Surkhi mortar 1:2/lime sand mortar 1:2 including racking and removal of all old loose plaster and cleaning the wall surface properly as perdirection of Engineer In-charge. |
| 5 | (40.5) P & L Lime Surkhi Plaster lime surkhi mortar 1:2 (1 Lime : 2 Surkhi) including preparation of mortar by traditional practice (by grinding) in specified course for base coarse and subsequent course & Loi, tamping, beating, curing till the shrinkage cracks are disappear. The work is to be done with all lead as the work is of restoration nature as per Jaipur practice including adding gur, methi & gugal on old walls including removal of all old loose and decade plaster, each coat to bedone after 3 days of previous coat. |
| 6 | (51258) 45 mm thick in four coats |
| 7 | (40.8) Add extra over item no. 40.5 to 40.6 for Lime plaster work done overSpherical or groin ceiling/ladao ceiling of domes. |
| 8 | (40.1) Add extra over item no. 40.5 to 40.6 for Lime plaster work done overcurved/circular masonry work (curved or circular surface.) |
| 9 | (40.7) Making Mehrab's, Arches, pillars, highly decorative creepers, flower of small sizes etc.in lime Surkhi plaster (1:2) as per B248old traditional practices (Arches, Mehrab's) in three coats for base course and subsequent course and Loi tamping, beating till the shrinkage cracks are disappear than making ornamental flowering/design etc. The work is to done with all leads and lifts as per work of restoration nature asper Jaipur practice. |
| 10 | (40.18) Stucco work in lime, Surkhi, mortar (1:2) as per existing design work/ traditional practices by skilled craftsman, the stucco work should be done as per restoration nature, the mortar should be prepared by grinding mill adding gur, methi & gugal.. The thickness varies from 50 mm to 100mm as per the design (minimum rectangular surface areato be measured). |
| 11 | (40.19) Providing & applying Lime kara 1:2 (1lime cream : 2 Zikki powder) grinding mortar with grinding mill/manually on lime base, on ceiling and all flat surface in two coats. First coat applying 3 mm to 4 mm thick and curing properly at least 7 days, second finishing coat done after 7 days of previous coat as per traditional practice.(thickness notmore than 6 mm.) |
| 12 | (40.2) Add extra for Lime Kara work (on lime plaster base) other than flat surface as per traditional practice with all lead & lift with fine finishingcomplete in all respect on : |
| 13 | (40.20.1) Domical surface/spherical/domical ceiling. |
| 14 | (40.20.2) Curved Surface |
| 15 | (40.17) Khamira Colour Washing as per old traditional practice to prepare the Khamira the lime should be slaked at least for 7-10 days and regularly it should be stirred by adding cured, Gugal, for non-synthetic colour adding gum (babool gum) as per specification. Then applying prepared solution on walls three to four thin coats as desiredfinishing. |
| 16 | (40.29) Providing and laying lime Dhar on roofing as per Rajasthan, Jaipur traditional practice with lime, Surkhi, old lime powder, brick aggregate 12 to 20mm (1:2:2:2) and using Methi, Gur, Hemp, Belgiri etc. including beating and temping 100 to 150 mm thick as perspecifications. Including dismantling of old deteriorated roofing |
| 17 | (40.3) Painting on Stucco work with stone colours including base coat of khameera as per traditional practice (minimum rectangular to bemeasured). |
| 18 | (1.1.2) Carriage of Materials by mechanical transport including loading, unloading and stacking : Sand, bazri, ballast, kankar: Beyond 5kmupto 10km |
| 19 | (Non SOR) Providing and fixing double scaffolding system on the exterior side, upto seven story height made with bamboo sticks and maintaining it in a serviceable condition for the required duration as approved and removing it there after complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose. (To be used for maintenance workjudicially) |
| 20 | (Non SOR) Providing khat work on finished surface of khamira wash as pertraditional practice (jaipur pattern) as per E.I.C. |
| 21 | (Non SOR) Providing and spray/brushing of gur gugal methi solution for bonding of lime work as per specification (200gm gugal, 200gm methi powder and 1kg gur mixed in 20ltr of water, boiled and stirred till the solutionvolume reduces upt 3/4th ) |
| 22 | (Non SOR) Making bend patta cornice gola and string course with grinded lime surkhi mortar and fine finished with lime 1:2 as per exisitng matching/ traditional practice complete in all aspect Size 15cmX10cm. |
| 23 | (Non SOR) Making gardana under ceiling/chajja with grinded lime surkhi mortar and fine finished with lime 1:2 as per exisitng matching/ traditionalpractice complete in all aspect: Size 25cm X 25cm |
| 24 | (Non SOR) Carefully removal of detoriated plaster, vegetation from all surface of per nala between kangoora and replastering it in 1:1:1 lime mortarand finishing it with khamira as per tradtional practice. Please Enable Macros to View BoQ information |