| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity (Tranch) including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 3 | providing concrete for plain/reinforced concrete P.C.C. Grade M-10 (1:3:6) in open foundations complete as per drawing and technical specifications. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 4 | Providing and laying reinforced cement concrete pipe NP3 (600mm dia) for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 5 | Providing and laying reinforced cement concrete pipe NP3 (1000mm dia) for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 6 | Brick masonry work in cement mortar in foundation complete excepting pointing and plastering, as per drawing and technical specification Clauses 600, 1202 & 1203. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 7 | Pointing with cement mortar (1:3) on brick work, as per drawing and technical specification Clauses 613.3 and 1204. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 10 | Construction of un-reinforced plain cement concrete pavement, 15 cm thickness as per design over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 Grade coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side frame work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the framework as per drawing), spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints by providing 12mm thick dura board at the specified spacing, applying debonding strips primer, sealant near approaches to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 but including cost of polythene sheet . but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 11 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 (M-20) in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. Binding wire of supplied by the contractor free of cost including making of drip coarse. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. |
| 12 | Mild steel or TMT Bars(Fe-500D grade or higher) or HYSD Bars or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel. but including cost of polythene sheet. Including all Taxes but Excluding cost of GST. Please Enable Macros to View BoQ information |