| 1 | SUPPLY |
| 2 | ACCESSORIES |
| 3 | Tower Accessories as UPPTCL Standard |
| 4 | Number Plate |
| 5 | Danger plate |
| 6 | Phase Plate |
| 7 | Earthing material Pipe type |
| 8 | Circuit Plate |
| 9 | Conductor Accessories Suitable for ACSR ZEBRA as per |
| 10 | Vibration Dampers |
| 11 | Repair sleeves |
| 12 | Hardwares & Insulator Accessories for Zebra Conductor |
| 13 | SINGLE TENSION FTTG |
| 14 | DOUBLE TENSION.FTTG |
| 15 | Insulator,Polymer, tension , 160 KN 245 KV with all accessories |
| 16 | Anchor Bolt 28x925 for gantory |
| 17 | OPGW Accessories |
| 18 | Joint Box |
| 19 | Supply of OPGW |
| 20 | 24 Fibre(DWSM) OPGW Fibre Optic Cable |
| 21 | Supply and Installation of Hardware set for 24 Fibre OPGW |
| 22 | Opgw Approach cable |
| 23 | Hardware set for approach cable ,OPGW, 24 Fibre |
| 24 | FODP for 48 Fibre |
| 25 | Installation, termiantion, testing and commsioning of FODP 48 Fibre |
| 26 | (ERECTION WORK) |
| 27 | Details survey of obove propoed line.This work includes route alingement of proposed , preapration of profile, tower schedule, schedule of materials, marking of of location (Route length), GPS survey of line, with co-ordinates of each tower (length of the line shall be authenticated by GPS Survey).All NOCs (Safety etc) required for erection/charging of the line has to obtain by the contractor and all ROW has to solve by the contractor including collecting of forms, completion of all required documuntations,submission in triplicate to respective offices including clearance from revenue department has to be done by the firm. |
| 28 | Check Survey |
| 29 | Soil investigation (All kind of Soil) |
| 30 | Cost of excavation of 220 KV tower foundation pits including all earth work, backfilling levelling etc |
| 31 | 220 KV Tower |
| 32 | 220 KV Gantory |
| 33 | Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers. The work also includes carriage of material from the store to the site. |
| 34 | STUB-SETTING(220 KV C+0/5) |
| 35 | STUB-SETTING(220 KV C+10/15) |
| 36 | Cost of concreting of all type of tower foundation including cost of cement, dewatering, shoring and shuttering, forming, curring but excluding cost of reinforcement bars |
| 37 | 1:2:4 concreting for Tower |
| 38 | 1:2:4 concreting for Gantory |
| 39 | Erection of superstructure of 220KV Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger numer, phase plates, bird guard and fixing & punching for 220 KV SC/DC lines names. The work also includes carriage of material from the store to the site. |
| 40 | 220 KV Tower |
| 41 | 220 KV Gantory |
| 42 | Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground levvel whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrode & application of Zinc rich Aluminium paint of the affected surface including cost of all material including tack welding of river crossing tower & Anchor towers. |
| 43 | Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting bending placing dinding etc. |
| 44 | 220 KV Tower |
| 45 | 220 KV Gantory |
| 46 | Laying, stringing, tensioning clamping, jointing etc of ACSR 'ZEBRA' conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting Armour rods, vibration dampers etc, on all Six phases of 220 KV DC Lines . The work also includes carriage of material from the store to the site, identification of LT lines and shut down clearances from discom. |
| 47 | Laying, stringing,tensioning,clamping,jointing including fitting of all necessary Hardware and accessories of OPGW& OFAC,termination at S/S ,end to end connectivity& testing etc. on 220 KV Lines with complete work to through data to SLDC of all of the equipments for successfully data validation. The work also includes carriage of material from the store to the site, identification of LT lines and shut down clearances from discom. |
| 48 | Grounding work including earthwork etc for Pipe type grounding including cost of coke & salt. The work also includes carriage of material from the store to the site. Please Enable Macros to View BoQ information |