| 1 | fo|qr forj.k [k.M [kqtkZ ds dk;Z{ks= esa iw.kZ tek ;kstuk en esa ykbZu fuek.kZ bR;kfn dk;ZA |
| 2 | Carriage Of Followings From Esc. Bsr To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Rcquricd For Proper Completion Of Work, Distance About To 60 Kms. |
| 3 | Steel Tubular Pole 13 Mtr. Long |
| 4 | Steel Tubular Pole 11 Mtr. Long |
| 5 | Steel Tubular Pole 09 Mtr. Long |
| 6 | Pcc Pole 11 Mtr. Long |
| 7 | Pcc Pole 09 Mtr. Long |
| 8 | Pcc Pole 8.5 Mtr Long. |
| 9 | Loading/Unloading & Carriage Of Transformer. From Esc. Bsr To Pit Site On Kachcha Pacaa Road Including Loading And Unloading Chagres At Both Ends, Rcquricd For Proper Completion Of Work, Distance About To 60 Kms. |
| 10 | 10 Kva Transformer. |
| 11 | 16 Kva Transformer. |
| 12 | 25 Kva Transformer. |
| 13 | 63 Kva Transformer. |
| 14 | 100 Kva Transformer. |
| 15 | 250 Kva Transformer. |
| 16 | Carriage Of All Line Material From Store Center Bsr To Je Store Sub Station As Acsr Weasel Conductor, Abc Conductor Gi Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator Etc. |
| 17 | Carriage Of 33kv/11kv Ct/Pt Unit From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km). |
| 18 | Carriage Of 33kv/11kv Metering Cubical Set Complete, From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km). |
| 19 | Carriage Of 11 Kv Vcb Complete, From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km). |
| 20 | Carriage Of Xlpe Cable From Store Center To Je Sub Station/Any Other Place Including Loading And Unloading At Both End. |
| 21 | 11 KV XLPE Cable 3x70 Sq. mm. |
| 22 | 11 KV XLPE Cable 3x120 AND 3X185 Sq. mm. |
| 23 | 33 KV XLPE CABLE 3X185 AND 3X300 SQ MM |
| 24 | Erection Of Single Pole Support Including Complete 1 It Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. |
| 25 | Steel Tubular Pole 13 Mtr. Long |
| 26 | Steel Tubular Pole 11 Mtr. Long |
| 27 | Steel Tubular Pole 09 Mtr. Long |
| 28 | Pcc Pole 11 Mtr. Long |
| 29 | Pcc Pole 09 Mtr. Long |
| 30 | Pcc Pole 8.5 Mtr Long. |
| 31 | Erection Of Double Pole/Section Double Pole Support Including Complete 1 It Fittings As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. |
| 32 | Steel Tubular Pole 13 Mtr. Long |
| 33 | Steel Tubular Pole 11 Mtr. Long |
| 34 | Steel Tubular Pole 09 Mtr. Long |
| 35 | Pcc Pole 11 Mtr. Long |
| 36 | Pcc Pole 09 Mtr. Long |
| 37 | Pcc Pole 8.5 Mtr Long. |
| 38 | Grouting Of Single Support Shall Be Grouted With Cement, Sand And Birck Ballast/Stone Ballast In Ratio 1:4:8 30x3030 Cms, Including The Cost Of Cement, Sand, Birck Ballast/Stone Ballast, Etc. As Per Actual Size Requirement, As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. |
| 39 | Steel Tubular Pole 13 Mtr. Long |
| 40 | Steel Tubular Pole 11 Mtr. Long |
| 41 | Steel Tubular Pole 09 Mtr. Long |
| 42 | Pcc Pole 11 Mtr. Long |
| 43 | Pcc Pole 09 Mtr. Long |
| 44 | Pcc Pole 8.5 Mtr Long. |
| 45 | Grouting Of Double Pole/Section Double Pole Support Shall Be Grouted With Cement, Sand And Birck Ballast/Stone Ballast In Ratio 1:4:8 =30x3030 Cms. Including The Cost Of Cement, Sand, Birck Ballast/Stone Ballast, Etc. As Per Actual Size Requirement, As Per Respo Manual And As Per Direction Of Engineer In Charge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. |
| 46 | Steel Tubular Pole 13 Mtr. Long |
| 47 | Steel Tubular Pole 11 Mtr. Long |
| 48 | Steel Tubular Pole 09 Mtr. Long |
| 49 | Pcc Pole 11 Mtr. Long |
| 50 | Pcc Pole 09 Mtr. Long |
| 51 | Pcc Pole 8.5 Mtr Long. |
| 52 | Carriage Of All Line Material From J.E Store Sub Station To Pit Site Acsr Weasel Conductor, Abc Conductor Gi Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator Etc. |
| 53 | Fabrication And Cutting/Drilling/Welding Of Ms Angle Iron T-Off Channel Etc. For Making Guarding Angle Of Various Size Including The Work Of Fixing The Bracket On Pcc/St Pole For Construction Of The Line. |
| 54 | Laying Of 11 Kv Xlpe Cable 3*70/3*120/3*185 Square Mm & Outer Size Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work. |
| 55 | Laying Of 33 Kv Xlpe Cable 3x185/3x240/3x300 Square Mm & Outer Size Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work. |
| 56 | Laying Of 33/11 Kv Xlpe Cable 3x185/300 With Cost Of Digging, Bricks And Sand Completed In All Accessories. |
| 57 | Laying, Sagging. Stringing And Binding And Jumpering Of Lt Xlpe Cable Size 3.5 X150/240/400 Square Mm & Outher Size Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc.Requried For Proper Completion Of Work. |
| 58 | Laying, Sagging. Stringing And Binding And Jumpering Of Acsr Weasal, Rabbit, Dog Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work. |
| 59 | Acsr Weasal Conductor |
| 60 | Acsr Rabbit Conductor |
| 61 | Acsr Dog Conductor |
| 62 | Abc Cable 1*16 Square Mm |
| 63 | Abc Cable 3*50 Square Mm |
| 64 | Abc Cable 3*95 Square Mm |
| 65 | Abc Cable 3*120 Square Mm |
| 66 | Fixing Of 11 Kv Stay Rod With Stay Wire In Proper Way With Nozelling |
| 67 | Grouting Of 11 Kv Stay Rods |
| 68 | Plinth Of Pole/Kiking Of Pole Up Nuturel Ground Level With Material Sand, Brick Etc. Provide By The Contractor Requried For Proper Completion Of Work. |
| 69 | Fixing Of 33 Kv Stay Rod With Stay Wire In Proper Way With Nozelling |
| 70 | Grouting Of 33 Kv Stay Rods |
| 71 | Fixing Of 11 Kv Pin Insulator |
| 72 | Fixing Of 33 Kv Pin Insulator |
| 73 | Fixing Of Single Phase Distribution Box |
| 74 | Fixing Of Three Phase Distribution Box |
| 75 | Fixing 11 Kv Disc Insulator |
| 76 | Fixing Of 11 Kv Disc Fitting |
| 77 | Fixing 33 Kv Disc Insulator |
| 78 | Fixing Of 33 Kv Disc Fitting |
| 79 | Fixing Of Number Plate With Clamp, Nut And Bolt. |
| 80 | Fixing Of Danger Board With Clamp, Nut And Bolt. |
| 81 | Fixing Of T-Off Channel |
| 82 | Fixing Of 11 Kv Cross Arm V-Type. |
| 83 | Fixing Of 33 Kv Cross Arm V-Type. |
| 84 | Fixing Of Top/Drop Channel |
| 85 | Fixing Of Sub Station Angle. |
| 86 | Erection & Fixing Of 11kv. Fuse Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Fuse Set Will Be Provided By The Department. |
| 87 | Erection & Fixing Of 11kv. Tpmo Set On Stp/Pcc Pole, By Providing All Required Fixing Materials As Per Respo/Norms And As Per Direction Of Site Incharge. (Only Tpmo Set Will Be Provided By The Department). |
| 88 | Fixing Of Barbet Wire. |
| 89 | Painting Of Pole With Aluminium Paint. |
| 90 | Painting Of Pole With Red Oxide Paint. |
| 91 | Fixing Of Aluminium Binding Wire 06 Swg |
| 92 | Fixing Of G.I. Pile 6\\" Dia. |
| 93 | Fixing Of Aluminium Joindint Sleeves. |
| 94 | Fixing Of I-Bolt. |
| 95 | Fixing Of 6 Swg G.I. Wire. |
| 96 | Fixing Of U-Clamp. |
| 97 | Fixing Of Pearcing Connector. |
| 98 | Fixing Of Lugs Ht/Lt Of Various Size Xlpe Cable. |
| 99 | Making/Filling Of 11 Kv Cable Jointing Kit/Straight Through Of Various Size Xlpe Cable |
| 100 | Making/Filling Of 33 Kv Cable Jointing Kit/Straight Through Of Various Size Xlpe Cable |
| 101 | Earthing Of Supports With Ms Earth Rod Of (20x2500)Mm Long Including Excavation Of Pit And Driving M.S. Rod 3.0 M Apart From Support And 0.5m Below The Ground Level And Connection Below The Earth Electrodes With The Help Of G.I. Wire & Earthing Lugs As Per Respo Drawing/Norms By Providing Proper Size Nuts & Bolts, As Per Direction Of Site Incharge. |
| 102 | Laying, Hosting And Commissiong Of 33 Kv Xlpe Cable Of 3x240/3x300 Sq.Mm. In Double Ckt. Cable Through Hdpe Pipe By Manual Trenchless Method With Three Sides Of Bricks And One Side Of Sand Complete Work In All Respect. |
| 103 | Laying, Hosting And Commissiong Of 33 Kv 3x300sqmm Xlpe Cable Double Ckt. Cable In Hdpe Pipe Through Hdd Trenchless Method By Machine With Complete Work In All Respect. |
| 104 | Digging Of Pits Of Size 4 Mtr X 4 Mtr X 1.5 Mtr For Cable Loop And Making Risers At Double Pole And Re-Filling Of Pits In Proper Manner With Required Material At Kacha/Pakka And Hot Mix Road. (All Work And Material In The Scope Of Contractor) |
| 105 | Laying Of 33kv Of 3x240/3x300 Sq.Mm Xlpe Cable In The Air On Cable Riser Double Pole, Existing Trench Cable Trench, G.I.Pipe And Making Connection Complete At Both Ends. |
| 106 | Drilling Of Dia 220 Mm In Bores For Double Curcuit By Trenchless Method By Horizontal Boring Machine At A Depth Of 1.50 Mtrs To 2.50 Mtrs. (As Per Site Requirement) Below The Ground Level At Kaccha/Pakka Road/Road Crossing/As Per Site Requirement With Complete Work In All Respect As Per Respo. |
| 107 | Laying Of 33 Kv Xlpe Cable Of Size 3x185/3x240/3x300 Sq.Mm Undergound Into Hdpe Pipe, Spare Cable Shall Be Left In The Loop Shape At Both Ends As Per Respo/Norms, As Per Direction Of Site Incharge.(Rate Will Be Charge As Per Actual Length Of Work) |
| 108 | Laying Of 11 Kv Xlpe Cable Of Size 3x70/3x120/3x185/3x240/3x300 Sq.Mm Undergound Into Hdpe Pipe, Spare Cable Shall Be Left In The Loop Shape At Both Ends As Per Respo/Norms, As Per Direction Of Site Incharge.(Rate Will Be Charge As Per Actual Length Of Work) |
| 109 | Laying And Interconnecting Of Above Hdpe Pipe Pe-80, Pn-6, Dn-140mm, 6\\" Dia By Hdd Trenchless Method For Hosting Of 33 Kv 3x300sq.Mm And 11 Kv Xlpe Cable Of Various Size With Complete Work In All Respect. |
| 110 | Laying Of 140/160mm O/D Pn-4pe-80 Pn-4 Grade Uv Stabilized Hdpe Pipe As Per Is Of 6meter, For Laying Of Underground Cable As Per Respo/Norms, Including Cost Of Above Hdpe Pipe, As Per Direction Of Site Incharge. (Rate Will Be Charge As Per Actual Length Of Work) |
| 111 | Safely Installing The 33 Kv Ct/Pt Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge. |
| 112 | Safely Installing of vcb With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge. |
| 113 | Safely Installing The 33 Kv Meter Cubicle Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge. |
| 114 | Safely Installing The 33 Kv Meter Pilfer Unit With The Help Of Crane/Manual Labour At Sub- Station Double Pole/Plinth, As Per Direction Of Site Incharge. |
| 115 | Construction Of Transformer. Plinth Suitable For 250/400 Kva Transformer. (Size Of 2 X 2 X 1.5 Mt.) As Per Drawing, Cc Work In Foundation In Ratio 1:3:6 (Cement, Sand & Brick Ballast). Ist Class Brick Work In Side Walls Cc Ratio Of 1:4 (Cement & Fine Sand). 12mm Thick Plaster In Ratio 1:4 (Cement & Fine Sand). The Rcc Work On Top Of Plinth In Ratio 1:2:4 After Duly Filling Of Brick Ballast Inside The Plinth & Ramming The Same, Including Cost Of All Material & Labour, As Per Direction Of Site Incharge. |
| 116 | Construction Of Plinth & Foundation of VCB. |
| 117 | Construction Of Safety Fencing (Ms) Size 3x3x2 Mtr. For Transformer 11/0.4 Kv Sub Station, With Supply Of Material Required For Ms Fencing (50x50x3 Mm) M.S. Wire Mesh Construction Utilizing Vertical Post Duly Grouted/Fitted In Ground/On Floor. Horizontal Angle/T-Iron To Be Fitted On Vertical Posts. Pickets (If Required) Fitted To Rail And Gate To Facilitate Entry And Exit. The Vertical Posts/Horizontal Post Shall Be Made Of M.S. Angle 75x75x6mm. Such Post Shall Be Kept Preferably At Distance Of 800-1000 Mm. And Shall Be Grounded With Cc Ratio 1:4:8. The Length Of Vertical Post Shall Be Sufficient To Take Care Of Fencing As Requirement At Site, And As Per Direction Of Site Incharge. |
| 118 | Providing, Carrying Of Tailless Unit, Circuit Having 3 Phase For 500 Amp Load. Each Job Includes 2 Tail Less Units. |
| 119 | Erection & Installation Charges For Tail Less Unit. Each Job Includes 2 Tail Less Unit. |
| 120 | Providing, Carrying Of Mccb Ith Box & Busbar. |
| 121 | Providing, Carrying Of Mccb Ith Box & Busbar. |
| 122 | Providing And Installation Of Maintenance Free Multifaceted Proactive And Corrosion Free Chemical Earthing Electrod Size 80mm X 3000 Mm Complete With 50kg Backfill Compound With All Required Accessories For Body/Neutral Earthing Of Transformers, Including Cost OfM.S. Earth Strip For Connection The Earth Strip Will Be Welded To The Earthing And Neutral Support, As Per Respo/Norms And As Per Direction Of Site Incharge. |
| 123 | Digging Of Earth And Refling With Road Restoration Pacca Road Charge As Per Respo/Drawing Norms. As Per Direction Of Site Incharge. |
| 124 | Digging Of Earth And Refilling With Road Restoration Kaccha/Footpath Charge As Per Respo/Drawing Norms. As Per Direction Of Site Incharge. |
| 125 | Dismantling/Removal Of Old Line To One Side For Double Circuit. |
| 126 | Mounting & Installation Of Transformer. From D/P |
| 127 | 10 Kva Transformer. |
| 128 | 16 Kva Transformer. |
| 129 | 25 Kva Transformer. |
| 130 | 63 Kva Transformer. |
| 131 | 100 Kva Transformer. |
| 132 | 250 Kva Transformer. |
| 133 | Supply Of Below De-Centralised/Market Material For Completing The Works As Per Respo.(Contractor Will Provide The Material At His Own Cost.) |
| 134 | 11 Kv Cross Arm Holding Clamp. |
| 135 | 33 Kv Cross Arm Holding Clamp. |
| 136 | 11 Kv Cable Jointing Kit/Straight Through Of Size 3X70/3X120X3X185 Square Mm. |
| 137 | 33 Kv Cable Jointing Kit/Straight Through Of Size 3X240/3X300 Square Mm. |
| 138 | Jumpheing Work Of Lt/Ht Line For Proper Energization Of Line. |
| 139 | Providing Of 33 Kv Cable Jointing Kit 3*300 Square Mm Straight Throuth/ Outdoor. |
| 140 | Providing Of Single Phase Distribution Box |
| 141 | Providing Of Three Phase Distribution Box |
| 142 | Providing Of Number Plate With Clamp, Nut And Bolt. |
| 143 | Providing Of Danger Board With Clamp, Nut And Bolt. |
| 144 | Providing Of Barbet Wire. |
| 145 | Providing Of Aluminium Paint. |
| 146 | Providing Of Red Oxide Paint. |
| 147 | Providing Of Aluminium Binding Wire 06 Swg |
| 148 | Providing Of G.I. Pile 6\\" Dia. |
| 149 | Providing Of 140mm Od Pn-6-Pe-80, 6\\" Dia Grade Uv Stabilized Hdpe Pipe.(Pvvnl Gtp Approved) |
| 150 | Providing Of Lugs Ht/Lt Of Various Size Xlpe Cable. |
| 151 | Providing Of Aluminium Joindint Sleeves. |
| 152 | Providing Of I-Bolt. |
| 153 | Providing Of 6 Swg G.I. Wire. |
| 154 | Providing Of U-Clamp. |
| 155 | Providing Of Pearcing Connector. |
| 156 | Double Pole Clamp |
| 157 | F Clamp |
| 158 | F-Bracket For 11 Kv Line |
| 159 | F-Bracket For 33 Kv Line |
| 160 | Lt Clamp |
| 161 | Tf Clamp 4 Nos. Set |
| 162 | Pg Clamp |
| 163 | Jhook |
| 164 | Earth Clamp |
| 165 | Stay Clamp |
| 166 | Dead & Clamps |
| 167 | Stay Insulator For 11 Kv |
| 168 | Suspension Clamps |
| 169 | Lt Insulator |
| 170 | Providing & Fixing Of Nut & Bolt With Washer As Per Site Requirement. Please Enable Macros to View BoQ information |