| 1 | fo|qr forj.k [k.M [kqtkZ ds vUrxZr iw.kZ tek ;kstuk en esa 33 dsoh] 11 dsoh ,oa ,y-Vh- ykbZuksa dks LFkkukUrfjr djus dk dk;ZA |
| 2 | Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. |
| 3 | S.T Pole 13 Mtr. Long |
| 4 | S.T Pole 11 Mtr. Long |
| 5 | PCC POLE 11 Mtr. Long |
| 6 | PCC POLE 9 Mtr. Long |
| 7 | PCC Pole 8.5 mtr Long. |
| 8 | Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 9 | Carriage of XLPE CABLE from store center BSR to j.e store Sub station. |
| 10 | Carriage of T/F from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms. |
| 11 | 25 KVA T/F |
| 12 | 63 KVA T/F |
| 13 | 100 KVA T/F |
| 14 | Erection of Single pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 15 | S.T Pole 13 Mtr. Long |
| 16 | S.T Pole 11 Mtr. Long |
| 17 | PCC POLE 11 Mtr. Long |
| 18 | PCC POLE 9 Mtr. Long |
| 19 | PCC Pole 8.5 mtr Long. |
| 20 | Erection of Double pole/Scation Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 21 | S.T Pole 13 Mtr. Long |
| 22 | S.T Pole 11 Mtr. Long |
| 23 | PCC POLE 11 Mtr. Long |
| 24 | PCC POLE 9 Mtr. Long |
| 25 | PCC Pole 8.5 mtr Long. |
| 26 | Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 27 | S.T Pole 13 Mtr. Long |
| 28 | S.T Pole 11 Mtr. Long |
| 29 | PCC POLE 11 Mtr. Long |
| 30 | PCC POLE 9 Mtr. Long |
| 31 | PCC Pole 8.5 mtr Long. |
| 32 | Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 33 | S.T Pole 13 Mtr. Long |
| 34 | S.T Pole 11 Mtr. Long |
| 35 | PCC POLE 11 Mtr. Long |
| 36 | PCC POLE 9 Mtr. Long |
| 37 | PCC Pole 8.5 mtr Long. |
| 38 | Carriage of All line Material from J.E store Sub station to Pit Site ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 39 | Cutting /drilling /Welding of MS Angle iron for making guarding angle size 65x65x6/50x50x6 mm including the work of fixing the bracket on PCC/ST pole for construction of the line. |
| 40 | Carriage of 11 Kv CT/PT metering polemounted unit Varius ratio |
| 41 | Carriage and installation of 11 Kv Pilferresistant metering cubicle with out cable termination kit |
| 42 | Mounting of 11 KV CT/PT Unit Varius ratio |
| 43 | Making/Filling of 11 Kv Cable Jointing kit Varius size XLPE cable |
| 44 | fixing of 11 Kv Stay rod with Stay wire in proper way with Nozelling |
| 45 | Grouting of 11 Kv Stay rods |
| 46 | Laying, sagging. Stringing and binding and jumpering of 11 Kv XLPE cable 3*70/3X120 Square MM & Outher size newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 47 | Laying, sagging. Stringing and binding and jumpering of ACSR Weisal , rabbit, dog newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 48 | ACSR weisal conductor |
| 49 | ACSR Rabbit/Dog conductor |
| 50 | ABC Cable 1X16 Square MM |
| 51 | ABC Cable 3*50 Square MM |
| 52 | ABC Cable 3*95 Square MM |
| 53 | ABC Cable 3*120 Square MM |
| 54 | Fixing of Earthing rod |
| 55 | Fixing of pin insulator |
| 56 | Fixing disc insulator |
| 57 | Fixing of V Type x Arm/Toff Channel |
| 58 | Fixing of Sub station Angle. |
| 59 | Ressagging of Loose & Bad Sag of LT/HT Line. |
| 60 | Tightening of Stay |
| 61 | Alignment of PCC/STP Pole |
| 62 | Grouting of Old PCC/STP Pole |
| 63 | Dismentalling of STP/ PCC Pole |
| 64 | Removal of STP/ PCC Pole |
| 65 | Dismentalling/ Removal of existing Meter Cubicle/CT & PT. |
| 66 | Removal of Old And Used ACSR Weasel Conductor & Opening from Insulator & Binding the Same. |
| 67 | Dismentalling & Removal of Old & Used T/F and Opening of All Accessories. |
| 68 | 25/63/100 KVA T/F |
| 69 | 250/400 KVA T/F |
| 70 | Cartage of Old & Used STP/PCC from site of work to Store Center with loading & Unloading at Both End. |
| 71 | Cartage of Old & Used 25/63/100 KVA T/f from site of work to Store Center with loading & Unloading at Both End. |
| 72 | Cartage of Old & Used Meter Cubicle/ CT/PT from site of work to Store Center with loading & Unloading at Both End. |
| 73 | Cartage of Removal Old & Used ACSR Weasel Conductor from site of work to Store Center with loading & Unloading at Both End. |
| 74 | Mounting & Installation of T/F From D/P |
| 75 | 25 KVA T/F |
| 76 | 63 KVA T/F |
| 77 | 100 KVA T/F |
| 78 | The folloing material is required to be supplied by the contractor. |
| 79 | Holding clamp. |
| 80 | 11Kv Cable Jointing kit 3*70 Square mm XLPE cable |
| 81 | Double Pole clamp |
| 82 | F Clamp |
| 83 | LT Clamp |
| 84 | PG Clamp |
| 85 | J hook |
| 86 | Side Braket |
| 87 | Earth clamp |
| 88 | Stay clamp |
| 89 | dead & clamps |
| 90 | Stay insulator for 11 Kv |
| 91 | Suspension clamps |
| 92 | LT Insulator |
| 93 | Bolt & nut off size. Please Enable Macros to View BoQ information |