| 1 | Safe Loading, Carriage & unloading of following Materials from Centre Store to Pit Site/J.E. Dump Store. |
| 2 | STP Pole 11 Mtr. Long |
| 3 | 33 KV Disc Insulator |
| 4 | 33 KV Disc Fitting |
| 5 | 33 KV Pin Insulator |
| 6 | 33 KV Pin with Nut |
| 7 | ACSR Dog/Weasel Conductor |
| 8 | Stay Set Complete |
| 9 | Stay Wire |
| 10 | 33 KV V Type Cross Arm |
| 11 | 11 KV VCB I/C CTR 600/300/5 Amp. |
| 12 | 11 KV VCB O/G CTR 200/100/5 Amp. |
| 13 | 11 KV VCB B/C O/D CTR 200/100/5A 350 MVA |
| 14 | Earthing Rod Complete |
| 15 | GI Wire |
| 16 | Cable 3x300 Sq. mm. XLPE for 33 KV |
| 17 | 33 KV O/D 3x300 Sq. mm. |
| 18 | MS Angle |
| 19 | Dragging of ST/PCC Pole digging of pit erection of sub-station type double pole structure on ST/PCC Pole with fixing of necessary item such as Top Channel, along with grouting (As per RESPO Norms) Dropper Channel, 33 pin insulator with Pin & 33 KV Disc Insulator with fitting, DO Fuse set its ramming, as per RESPO Specification. Only centralized material will be Provided by the Department |
| 20 | Dragging of ST/PCC Pole to pit site, diging of pit erection and grouting (As per RESPO Norms) of 33 KV line with fixing of necessary item, such as V-type X-arm, F-bracket, 33 KV Pin insulator, Gaurding angle (1.8 mm 65x65x6) with Nut & bolts its ramming as per RESSPO Specification. Only Pole and insulator will be Provided by the Department. |
| 21 | Grouting & Nuzzling of 33 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand, Brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 22 | Laying Stringing & sagging of 3 Phase 3 wire 33 KV New Line on ACSR Weasel/Dog/Panther conductor as per RESPO Specification and direction on E/I. All material except ACSR Weasel/Dog/Panther conductor shall be supplied by the contractor. |
| 23 | Ordinary earthing by 33 KV MS earth Rod 2500mm long as per RESPO Schedule. All material except earthing wire shall be supplied by the contractor |
| 24 | Installation of 11 KV VCB I/C CTR 600/300/5 Amp. as per RESPO Norms. (All Material and labour except 11 KV VCB I/C CTR 600/300/5 Amp. supplied by the contractor) |
| 25 | Installation of 11 KV VCB O/G CTR 200/100/5 Amp. as per RESPO Norms. (All Material and labour except 11 KV VCB O/G CTR 200/100/5 Amp. supplied by the contractor) |
| 26 | Installation of 11 KV VCB B/C O/D CTR 200/100/5A 350 MVA as per RESPO Norms. (All Material and labour execpt 11 KV VCB B/C O/D CTR 200/100/5A 350 MVA supplied by the contractor) |
| 27 | Cable Laying of 3x300 Sq. mm Double Circuit in normal soil by digging of trench 900 mm deep 500 mm wide including supply of required material such as 1st Class bricks, fine sand, stone slab. (All material shall be provided by the contractor except 33 KV cable) as per RESPO Norms. |
| 28 | Hoisting of 33 KV 3x300 sq. mm. XLPE Cable with GI Pipe dia 6\\". Its Jumpering with clamps, nuts and bolts |
| 29 | High Pressure testing of 33 KV 3x300 sq. mm. XLPE Cable Please Enable Macros to View BoQ information |