| 1 | Earth work in embankment mechanically compacted to 95% proctor density In ordinary soil, excavation to be done form of regular pits not exceeding 0.5mtr in depth and work in embankment to be in 20cm layer including ramming and dressing pulverization surfacing including Supply of Labour, T&P, Roller and water sprinkleras per latest P.W.D. schedule S.I. 253+253(a) |
| 2 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. as SI 251 (Rates are including all Taxes but excluding GST)(all from Ch-4 SI.No-1) |
| 3 | Providing and laying cement concrete in 1:6:12 (1 Cement : 6 Fine sand : 12 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation. etc. Complete of work.as SI 273(Rates are including all Taxes but excluding GST) |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheeled roller to achieve the desired density, complete as per clause 401. |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4-53mmto water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification Clause 405. |
| 6 | Supply and laying of precast concrete Block (Interlocking tiles) for paving of thickness 80 mm (Compressive strength not Less then 30 Mpa) Including 25 mm thick local sand base levelling and dressing of surface to required level and slop, filling joints with local sand all complete work as specified in IS 15658:2006 |
| 7 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.DSR SI .No 6.1 |
| 8 | Supply and laying of RCC NP-3 Hume pipe including cost of all material, labour, T&P etc. complete.(Rates are including all Taxes but excluding GST) (350 mm dia) |
| 9 | Providing and laying Cement concrete in 1:2:4 with cement, approoved Coarse sand & stone grit 20 mm nominal size and curing complete, including cost of form work in foundation and floors. As SI 279(a) (Rates are including all Taxes but excluding GST) |
| 10 | Supply and Fixing of informatory Sign board / Lokarpan Patiya Painting & Lettering etc Complete work. (Rates are including all Taxes but excluding GST) Please Enable Macros to View BoQ information |