| 1 | Printing of MRP, Batch no. & Manufacturing date on 1 kg pouch using printing machine. | Printing of MRP, Batch no. & Manufacturing date on 1 kg pouch using printing machine. |
| 2 | Transportation of empty pouches from printing area to production floor. | Transportation of empty pouches from printing area to production floor. |
| 3 | Weighing, opening/cutting of raw material bags of 25 kg , discharging the material in different hopper, collection of empty bags, stacking of bags in bundle & shifting to disposal yard. | Weighing, opening/cutting of raw material bags of 25 kg , discharging the material in different hopper, collection of empty bags, stacking of bags in bundle & shifting to disposal yard. |
| 4 | Urea grinding ,weighing, opening/cutting of raw material bags of 50 kg & discharging the material in different hoppers , collection empty bags, stacking in bundle & shifting in disposal yard | Urea grinding ,weighing, opening/cutting of raw material bags of 50 kg & discharging the material in different hoppers , collection empty bags, stacking in bundle & shifting in disposal yard |
| 5 | Removal of product in 25 kg bag from blender. | Removal of product in 25 kg bag from blender. |
| 6 | Filling desired quantity of the product in 1 kg pouch, weighing & heat sealing of pouch | Filling desired quantity of the product in 1 kg pouch, weighing & heat sealing of pouch |
| 7 | Printing of MRP, Batch no. & Manufacturing date on 25 kg BOPP bag by using printing machine | Printing of MRP, Batch no. & Manufacturing date on 25 kg BOPP bag by using printing machine |
| 8 | Transporting of empty bags from printing area to production floor | Transporting of empty bags from printing area to production floor |
| 9 | Weighing, opening/cutting of raw material bags of 25 kg, discharging the material in different hoppers, collection of empty bags, stacking of bags in bundle & shifting to disposal yard | Weighing, opening/cutting of raw material bags of 25 kg, discharging the material in different hoppers, collection of empty bags, stacking of bags in bundle & shifting to disposal yard |
| 10 | Urea grinding weighing, opening/cutting of raw material bags of 50 kg, discharging the material in different hoppers, collection of empty bags, stacking of bags in bundle & shifting to disposal yard. | Urea grinding weighing, opening/cutting of raw material bags of 50 kg, discharging the material in different hoppers, collection of empty bags, stacking of bags in bundle & shifting to disposal yard. |
| 11 | Removal of product from blender. Filling the desired quantity of product in 25 kg PP bag, weighing the bag. | Removal of product from blender. Filling the desired quantity of product in 25 kg PP bag, weighing the bag. |
| 12 | Cleaning of blender | Cleaning of blender |
| 13 | Shifting of Iron waste material from plant to scrap yard /other places. | Shifting of Iron waste material from plant to scrap yard /other places. |
| 14 | Shifting of SS waste material from plant to scrap yard /other place | Shifting of SS waste material from plant to scrap yard /other place |
| 15 | Shifting of raw material/other material from store to plant | Shifting of raw material/other material from store to plant |
| 16 | Shifting of heat sealing machines/other small equipment’s from plant to workshops | Shifting of heat sealing machines/other small equipment’s from plant to workshops |
| 17 | Shifting of packaging material (all type) from store to plant | Shifting of packaging material (all type) from store to plant |
| 18 | Shifting of PN, PS, MAP, PDP raw materials from other locations within factory Sujala plant | Shifting of PN, PS, MAP, PDP raw materials from other locations within factory Sujala plant |
| 19 | Shifting of raw material from methyl amine platform to Sujala plant | Shifting of raw material from methyl amine platform to Sujala plant |
| 20 | Bringing oil, greases or other material from other plant. | Bringing oil, greases or other material from other plant. |