| 1 | Supplying, laying, fixing, jointing and testing LT under ground XLPE insulated, galvanised teel strip or wire armoured heavy duty electric cable with alumimium conductor, 1100 volts grade, cross sectional area 16 Sqmm x 4 Core, IS 7098 marked, with electric connection lugs, laid in trenches/under floor or fixed naked with walls / on poles/ in ducts / in GI pipes etc. and including taking down, complete all as specified and directed.Note - Excavation, earth work, sand cushioning, PCC cover and GI pipe shall be measured and paid separately. |
| 2 | Description all as per serial Item No. 01 here-in-before, but cross sectional area 25 sqmm x 4 Core, complete all as specified and directed. |
| 3 | Description all as per serial Item No. 01 here-in-before, but cross sectional area 50 sqmm x 3.5 Core, complete all as specified and directed. |
| 4 | Description all as per serial Item No. 01 here-in-before, but cross sectional area 95sqmm x 3.5 Core, complete all as specified and directed. |
| 5 | Description all as per serial Item No. 01 here-in-before, but cross sectional area 120sqmm x 3.5 Core, complete all as specified and directed. |
| 6 | Description all as per serial Item No. 01 here-in-before, but cross sectional area 150sqmm x 3.5 Core, complete all as specified and directed. |
| 7 | Description all as per serial Item No. 01 here-in-before, but cross sectional area 185sqmm x 3.5 Core, complete all as specified and directed. |
| 8 | Description all as per serial Item No. 01 here-in-before, but cross sectional area 240sqmm x 3.5 Core, complete all as specified and directed. |
| 9 | Supply and laying GI pipe 'light grade' 40 mm in trenches, under floors, roads, along poles for protection of cables with all necessary fittings and sealing ends, complete all as specified and directed |
| 10 | Supply and laying GI pipe 'light grade' 50mm in trenches, under floors, roads, along poles for protection of cables with all necessary fittings and sealing ends, complete all as specified and directed. |
| 11 | Supply and laying GI pipe 'light grade' 50mm in trenches, under floors, roads, along poles for protection of cables with all necessary fittings and sealing ends, complete all as specified and directed. |
| 12 | Excavation in trenches, not exc 1.5 m wide and not exc 1.5 m in depth; for laying of cables, pipes etc. and getting out all excavated material in any type of soil, complete all as specified and directed. |
| 13 | Returning, filling in and including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick, complete all as specified and as directed. |
| 14 | Removing of excavated surplus soil to a distance not exc 50 m and depositing where directed at a level not exc. 1.5 m above the starting point, complete all as specified and directed. |
| 15 | M&L of locally available river sand in trenches 15 cm below cable and 8cm above / around UG cable for cable protection, in duct under and above the cables including punning around cable complete all as specified and directed.Note - Punned thickness shall only be measured and paid. |
| 16 | Supply and laying unreinforced PCC Cable protection cover, class LV, type-1 flat with size 250 x 150 x 40 mm laid flat width wise, complete all as specified and directed. |
| 17 | S&F in replacement of unserviceable Stragiht throught LT joint including jointing material and excavation upto 3mtr length and make good surface after jointing of cable complete of size 95 to 120 sqmm 3.5 core, complete all as specified and directed. |
| 18 | S&F in replacement of unserviceable Stragiht throught LT joint including jointing material and excavation upto 3mtr length and make good surface after jointing of cable complete of size 150 to 185 sqmm 3.5 core, complete all as specified and directed. |
| 19 | Material and labour for road cutting of minimum sizes 30cm x 30cm and minimum width of 3 mtrs for laying cables etc upto 10 mtr and making good the disturbed surface to match existing surface using PCC 1:2:4 type B-2 (using 40mm graded crushed stone aggregate), complete all as specified and as derected. |
| 20 | S&F MCCB 4 pole 63 Amps breaking capacity 25 kA, including spreader link and including taking down old existing MCCB, complete all as specified and directed. |
| 21 | S&F MCCB 3 pole 100 Amps breaking capacity 25 kA, including spreader link and including taking down old existing MCCB, complete all as specified and directed. |
| 22 | S&F MCCB 4 pole 100 Amps breaking capacity 25 kA, including spreader link and including taking down old existing MCCB, complete all as specified and directed. |
| 23 | S&F MCCB 4 pole 160 Amps breaking capacity 36 kA, including spreader link and including taking down old existing MCCB, complete all as specified and directed. |
| 24 | S&F MCCB 3 pole 160 Amps breaking capacity 36 kA, including spreader link and including taking down old existing MCCB, complete all as specified and directed. |
| 25 | S&F MCCB 4 pole 200 Amps breaking capacity 36 kA, including spreader link and including taking down old existing MCCB, complete all as specified and directed. |
| 26 | S&F MCCB 4 pole 250 Amps breaking capacity 36 kA, including spreader link and including taking down old existing MCCB, complete all as specified and directed. |
| 27 | S&F MCCB 4 pole 400 Amps breaking capacity 36 kA, including spreader link and including taking down old existing MCCB, complete all as specified and directed. |
| 28 | Supply and fixing Onload Change over Switch cubical type 4 pole of rating 630 Amps, with rotary handles including taking down old existing Onload Change over any capacity, complete all as specified and directed. |
| 29 | Supply and fixing replacement offload Change over Switch cubical type 4 pole of rating 400 Amps, with rotary handles including taking down old existing Onload Change over any capacity, complete all as specified and directed. |
| 30 | Supply and fixing offload Change over Switch cubical type 4 pole of rating 250 Amps, with rotary handles including taking down old existing Onload Change over any capacity, complete all as specified and directed. |
| 31 | Supply and fixing offload Change over Switch cubical type 4 pole of rating 200 Amps, with rotary handles including taking down old existing Onload Change over any capacity, complete all as specified and directed. Please Enable Macros to View BoQ information |
| 32 | Supply and fixing offload Change over Switch cubical type 4 pole of rating 200 Amps, with rotary handles including taking down old existing Onload Change over any capacity, complete all as specified and directed. Please Enable Macros to View BoQ information |