| 1 | Clearing Grass and Removal of Rubish Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area SOR NO. 2.02 RDD |
| 2 | Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.SOR NO. 3.20 case (i) RDD |
| 3 | Construction of Subgrade and Earthen Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. SOR. ITEM NO. 3.18 RDD |
| 4 | Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. SOR. ITEM NO. 4.01 B(iii)RDD |
| 5 | Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing |
| 6 | Carriage of materialsCement |
| 7 | Stone Chips |
| 8 | Earth work in excavation for structures as per drawing and technical specification caluse 305.1, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matterial and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavation suitable material.S.O.R. Item No. 3.13 (i) A |
| 9 | Plain/Reinforced cement concrete in open foundation complete as per drawing and Tchnical Specification. |
| 10 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specification Clauses 702, 704, 1202 & 1203Coarse Rubble Masonary in C.M. (1:3) in foundation.S.O.R. Item No. 12.7(b) |
| 11 | Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specification Clauses 702, 704, 1202 & 1203Random Coarse Rubble Masonary in C.M. (1:3) in sub-structure.S.O.R. Item No. 13.4(A) |
| 12 | Plain/ Reinforced cement concreteon Top of Wall complete as per Drawing and Technical Specification. |
| 13 | Providing weep holes with day grades stone filter of 53 mm to 22.4 mm size in abutment and wing wall all complete job as per specification and direction of E/I.S.O.R. Item No. 13.8 |
| 14 | Tuck Pointing with cement mortar (1:3) on brick or stone masonary work as per drawing and technical specification Clauses 613.3 and 1204S.O.R. Item No. 5.7.10 (B.C.D.) |
| 15 | Carriage of MaterialsCEMENT |
| 16 | STONE CHIPS |
| 17 | STONE METAL |
| 18 | BOULDER |
| 19 | Add 18% GST Amount |
| 20 | Add 1% Labour Cess Amount Please Enable Macros to View BoQ information |