| 1 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the foundation bed and depositing the excavated materials clear of work site with all leads, lifts, delifts with cost of all labour, T&P, hire and running charges of all machineries, labour cess etc. complete in all respects as per specification and direction of the Engineer-in-Charge. |
| 2 | Double under reamed pile foundaiton with RCC M-30 using 20mm downgraded size black hard granite crusher broken stone chips including cost of boring but excluding cost of M/S tor steel and labour charges for cutting bending of steel with cost, conveyance, royalty of all materials, T&P and labour charges, cess etc. complete in all respects as per specification and direction of the Engineer-in-Charge. |
| 3 | Filling in foundation & plinth with sand well watered to saturated condition and rammed including all cost, carriage, royalty, taxes of materials with all labour charges cess etc. complete as per the direction of the Engineer-in-Charge. |
| 4 | Providing form work for concrete with F2 finish for all permanently exposed surfaces not prominently exposed to public view such as retaining wall with steel shutters including supply of rigid tie and supports with all labour, materials and T&P complete as per direction of Engineer-in-Charge. |
| 5 | Providing and laying of cement concrete of grade M-15 grade with 20 mm. and downgraded coarse aggregates (crusher broken) for concrete linning to the bed and slopes of canal with sleeper beam, keys etc in panels including supply of all materials labour and machineries compacting with vibrator or manually and finishing the concrete surface including trimming and dressing of canal bed and slopes including cutting trenches for sleeper beam, keys and drainage etc including compaction of slopes and bed to proper profile confirming to relevant BIS specification with cost, conveyance, royalty of all materials, T&P and labour charges, cess etc. complete including walk-ways for placing concrete of desired workability, curing for recommended period as per direction of Engineer-in-Charge |
| 6 | Cement Concrete M-25 with 20mm and downgraded size hard granite crusher broken chips for PCC / RCC work confirming to relevant BIS specifications for all materials including scaffolding, walkways & properly mixing, hoisting & laying with desired workability with all cost, conveyance, royalty of all materials, T&P labour charges, cess etc. complete including curring for recommended period as per the direction of the Engineer-in-Charge. |
| 7 | Supplying, fitting, fixing of HYSD including labour charges for straightening, cutting, bending and binding the HYSD bar or tor steel and tying the grills and placing in position (confirming to I.S.I specification) including jointing if necessary by lapping, welding as required for R.C.C work as per approved drawing and design & binding with binding wire 18 to 20 gauge including cost carriage and other taxes of all materials with all leads, lifts & delifts of reinforcement bars etc. complete as per the direction of the Engineer-in-charge. |
| 8 | Wall priming one coat with approved primer with brush to wall surface after cleaning the surface including cost, conveyance, taxes of all the materials required for the work with all labour. T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge |
| 9 | Providing weep holes in Brick massonary / plain / reinforcement cement concrete Abutment / wing wall / return wall / guard wall with 100mm dia A.C pipe extending through the full width of structure with slope 1V:20H towards dreawing force etc with all cost, carriage, conveyance, taxes & labour charges etc. Complete as per the direction of the Engineer-in-Charge. |
| 10 | Filling bitumen, cement & jute fibre in expansion joints including cost of materials, bitumen & cement proportion (3:1) including cleaning before pouring 12mm to 25mm wide and 10 cm depth etc. complete as per direction of the Engineer-in-Charge |
| 11 | Earth work in any approved type of soil except sand and sandy soil from approved borrow area after stripping the surface to required depth, loading into transport vehicles, carriage of earth by mechanical means, unloading the earth within lead of 5.00 Km on properly prepared and scientifically approved surface (trimming the surface, removing the debries, benching the old embankment & levelling to proper profile), spreading the earth in layers not exceeding 22.50 Cm in height, rough dressing & breaking the clods to maximum 5 to 7 cm in size and dressing the embankment to proper level and profile, including all taxes, royalty, cess etc. as per direction of the Engineer-in-Charge |
| 12 | Filling in foundation & plinth with excavated materials including watering and ramming etc. complete as per the direction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |