|
| 1 | Electrical Works |
| 2 | Supply, Installation, Testing and Commissioning of 9 Mtr long 300 Kg PSC Pole including earth excavation work, concreting of pole (1.5 Mtr X 0.5 Mtr X 0.5 Mtr=0.375 Cum) with PCC (1:1.5:3) with couping of support (0.3Mtr X 0.5 Mtr X 0.5 Mtr=0.075Cum) with PCC (1:1.5:3) , all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . |
| 3 | Supply and Laying of LT XLPE Insulated AB Cable of size 3x35+1x25+1x16 sq mm including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . |
| 4 | Supply, Installation, Testing and Commissioning of Suspension type Pole Clamp with Eye Hook including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . |
| 5 | Supply, Installation, Testing and Commissioning of Dead End Clamp including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . |
| 6 | Supply, installation and commissioning of LT Stay set(Complete), LT Stay Insulator, LT stay clamp(1.95Kg/Pair), 7/10 SWG Stay Wire 12Kg/Stay and concreting of stay (1.65 Mtrx0.3 Mtrx0.3 Mtr =0.1485 Cum - PCC 1:2:4)including all accessories, labour cost, T&P etc. complete work as per direction of EIC. |
| 7 | Supply and Laying of 3.5C x 35 Sq mm 1.1 kV grade XLPE Insulated Aluminum Armoured cable drawn with 50 mm dia HDPE Pipe with earth excavation back filling with the excavated soil including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . |
| 8 | Supply, Installation, Testing and Commissioning of Suspension type Pole Clamp with Eye Hook including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . |
| 9 | Sundries for survey ,tree cutting, small size nut & bolt with washer , Aluminum Binding Tape, Danger Board, Dismantling of Existing HT Overhead Line etc including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge. Please Enable Macros to View BoQ information |