| 1 | Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-incharge. |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. |
| 3 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications P.C.C.1:3:6 . |
| 4 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Random rubble masonry In cement mortar (1:5) |
| 5 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar in breast walls, retaining walls, scuppers etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications . |
| 6 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.1000 mm dia |
| 7 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Rubble Stone Masonry in Cement Mortar |
| 8 | Plastering with cement mortar (1:4), 15 mm thick on brickwork/ Stone work in substructure as per technical specification |
| 9 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications P.C.C.1:2:4 . |
| 10 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification R.C.C. grade M 25 |
| 11 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification. |
| 12 | Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting, hoisting, fixing in position for composite girders with shear connectors complete with painting as per drawing and technical specifications |
| 13 | Brick masonry work in cement mortar in substructure complete as per drawing and technical specification In 1:4 Cement mortar |
| 14 | Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality Circular shape 560 mm internal diameter |
| 15 | Providing & Fixing of M.S. Gate (1.20 M X 1.50 m)for Distribution of water Supply for canal including all material, labour T&P etc complete |
| 16 | Providing & Fixing of M.S.Shutter (0.40 M X 0.90 M) for Distribution of water Supply for canal including all material, labour T&P etc complete Pointing with cement mortar (1:3) as per drawing and technical specification Clauses 613.3 and 1204 Please Enable Macros to View BoQ information |