| 1 | Disconnection of incoming Power connection from main switch /MCCB/Voltage Stabilizer and checking the fault of Panel |
| 2 | Making of temporary arrangement for running of pumping machinery |
| 3 | Replacement of Damaged 25 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 4 | Replacement of Damaged 32 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 5 | Replacement of Damaged 40 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 6 | Replacement of Damaged 50 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 7 | Replacement of Damaged 70 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 8 | Replacement of Damaged 80 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 9 | Replacement of Damaged 95 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 10 | Replacement of Damaged 110 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 11 | Replacement of Damaged 140 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 12 | Replacement of Damaged 185 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 13 | Replacement of Damaged 225 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 14 | Replacement of Damaged 250 Amp. 3 pole power contactor by way of Providing /fitting of new 3 pole power contractor. |
| 15 | Replacement of Damaged Kit of 25 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 16 | Replacement of Damaged Kit of 32 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 17 | Replacement of Damaged Kit of 40 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 18 | Replacement of Damaged Kit of 50 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 19 | Replacement of Damaged Kit of 70 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 20 | Replacement of Damaged Kit of 80 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 21 | Replacement of Damaged Kit of 95 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 22 | Replacement of Damaged Kit of 110 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 23 | Replacement of Damaged Kit of 140 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 24 | Replacement of Damaged Kit of 185 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 25 | Replacement of Damaged Kit of 225 Amp. 3 pole power contactor by way of Providing /fitting of new kit |
| 26 | Replacement of Damaged Kit of 250 Amp. 3 pole power contractor by way of Providing /fitting of new kit |
| 27 | Replacement of Damaged coil of 25 Amp. 3 pole power contractor by way of Providing /fitting of new coil |
| 28 | Replacement of Damaged coil of 32 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 29 | Replacement of Damaged coil of 40 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 30 | Replacement of Damaged coil of 50 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 31 | Replacement of Damaged coil of 70 Amp. 3 pole power contractor by way of Providing /fitting of new coil |
| 32 | Replacement of Damaged coil of 80 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 33 | Replacement of Damaged coil of 95 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 34 | Replacement of Damaged coil of 110 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 35 | Replacement of Damaged coil of 140 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 36 | Replacement of Damaged coil of 185 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 37 | Replacement of Damaged coil of 225 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 38 | Replacement of Damaged coil of 250 Amp. 3 pole power contactor by way of Providing /fitting of new coil |
| 39 | Replacement of Damaged MPR |
| 40 | Replacement of damaged over load relay & P/F new overload relay |
| 41 | Replacement of damaged under load relay & P/F new underload relay |
| 42 | Replacement of single phase relay & P/F single phase relay |
| 43 | Replacement of reverse phase relay & P/F reverse phase relay |
| 44 | Replacement of Damaged MCCB 40 Amp. by way of Providing /fitting of new MCCB |
| 45 | Replacement of Damaged MCCB 50 Amp. by way of Providing /fitting of new MCCB |
| 46 | Replacement of Damaged MCCB 63 Amp. by way of Providing /fitting of new MCCB |
| 47 | Replacement of Damaged MCCB 80 Amp. by way of Providing /fitting of new MCCB |
| 48 | Replacement of Damaged MCCB 100 Amp. by way of Providing /fitting of new MCCB |
| 49 | Replacement of Damaged MCCB 125 Amp. by way of Providing /fitting of MCCB |
| 50 | Replacement of Damaged MCCB 160 Amp. by way of Providing /fitting of MCCB |
| 51 | Replacement of Damaged MCCB 200 Amp. by way of Providing /fitting of MCCB |
| 52 | Replacement of Damaged MCCB 250 Amp by way of Providing /fitting of MCCB |
| 53 | Replacement of Damaged MCCB 320 Amp by way of Providing /fitting of MCCB |
| 54 | Replacement of Damaged MCCB 400 Amp by way of Providing /fitting of MCCB |
| 55 | Making of incoming Power connection to main switch /MCCB/Voltage Stabilizer and checking on full load. |
| 56 | Upto 100 Amp |
| 57 | Charges for minor repair/servicing of LT Control Panel including minor parts like meters, indicators , timers etc |
| 58 | Providing /fitting of circuit wiring |
| 59 | Providing /fitting of voltmeter |
| 60 | Providing /fitting of ampmeter |
| 61 | Providing /fitting of Amp selector switch |
| 62 | Providing /fitting of volt selector switch |
| 63 | Providing /fitting of Push Button |
| 64 | Providing /fitting of indicator lamps |
| 65 | Providing /fitting of star delta timer |
| 66 | Providing /fitting of terminal plate |
| 67 | Providing /fitting of fault analyzer |
| 68 | Providing /fitting of quartz timer |
| 69 | Providing /fitting of delay timer |
| 70 | Providing /fitting of power wiring |
| 71 | Providing /fitting of thermal overload relay |
| 72 | Providing /fitting of bus bar |
| 73 | Providing /fitting of boiled fuse link |
| 74 | Providing /fitting of fuse holder suitable for bolted fuse link |
| 75 | Making of incoming Power connection to main switch /MCCB/Voltage Stabilizer and checking on full load. |
| 76 | 125 Amp. To 200 amp |
| 77 | Charges for minor repair/servicing of LT Control Panel including minor parts like meters, indicators , timers etc |
| 78 | Providing /fitting of circuit wiring |
| 79 | Providing /fitting of voltmeter |
| 80 | Providing /fitting of ampmeter |
| 81 | Providing /fitting of Amp selector switch |
| 82 | Providing /fitting of volt selector switch |
| 83 | Providing /fitting of indicator lamps |
| 84 | Providing /fitting of Push Button |
| 85 | Providing /fitting of star delta timer |
| 86 | Providing /fitting of terminal plate |
| 87 | Providing /fitting of fault analyzer |
| 88 | Providing /fitting of quartz timer |
| 89 | Providing /fitting of delay timer |
| 90 | Providing /fitting of power wiring |
| 91 | Providing /fitting of thermal overload relay |
| 92 | Providing /fitting of bus bar |
| 93 | Providing /fitting of boiled fuse link |
| 94 | Providing /fitting of fuse holder suitable for bolted fuse link |
| 95 | Making of incoming Power connection to main switch /MCCB/Voltage Stabilizer and checking on full load. |
| 96 | 225 Amp. To 300 Amp. |
| 97 | Charges for minor repair/servicing of LT Control Panel including minor parts like meters, indicators , timers etc |
| 98 | Providing /fitting of circuit wiring |
| 99 | Providing /fitting of voltmeter |
| 100 | Providing /fitting of ampmeter |
| 101 | Providing /fitting of Amp selector switch |
| 102 | Providing /fitting of volt selector switch |
| 103 | Providing /fitting of indicator lamps |
| 104 | Providing /fitting of Push Button |
| 105 | Providing /fitting of star delta timer |
| 106 | Providing /fitting of terminal plate |
| 107 | Providing /fitting of fault analyzer |
| 108 | Providing /fitting of quartz timer |
| 109 | Providing /fitting of delay timer |
| 110 | Providing /fitting of power wiring |
| 111 | Providing /fitting of thermal overload relay |
| 112 | Providing /fitting of bus bar |
| 113 | Providing /fitting of boiled fuse link |
| 114 | Providing /fitting of fuse holder suitable for bolted fuse link |
| 115 | Making of incoming Power connection to main switch /MCCB/Voltage Stabilizer and checking on full load. |
| 116 | Providing & Fitting of Change Over Switch 125 ampere |
| 117 | Providing & Fitting of Change Over Switch 160 ampere |
| 118 | Providing & Fitting of Change Over Switch 200 ampere |
| 119 | Providing & Fitting of Change Over Switch 250 ampere |
| 120 | Providing & Fitting of Change Over Switch 315 ampere |
| 121 | Providing & Fitting of Change Over Switch 400 ampere |
| 122 | Transformer Oil per litre |
| 123 | Providing and fitting of lamination core |
| 124 | Heat treatment of voltage stabilizer assembly |
| 125 | Old Transformer oil per litre |
| 126 | 63 KVA Voltage Stablizer |
| 127 | Reconditioning of Copper Coil |
| 128 | Rewinding of copper Coil |
| 129 | Providing & Fitting of Rotary Switch as per size |
| 130 | Providing & Fitting of Indicator |
| 131 | Providing & Fitting of Selector Switch |
| 132 | Providing & Fitting of Amperemeter |
| 133 | Providing & Fitting of Voltmeter |
| 134 | Wiring Complete job with insultor |
| 135 | Disconnecting of power connection of the Voltage Stabilizer, dismantling of stabilizer by unscrewing nut bolts. Extracting out of stabilizer coil structure by mounting of chain pulley block with the help of manual skilled labour. |
| 136 | Disconnecting of power connection of damaged Voltage Stabilizer and reconnecting of repaired voltage stabilizer with proper thimbling and insulation with the help of skilled labor. |
| 137 | Dismantling and assembling of voltage stabilizer at workshop. |
| 138 | Assembling of stabilizer, connecting the power connections and testing on load. |
| 139 | Carriage/Shifting of 63 KVA Voltage Stabilzer from pump room on head load to and fro up to stacking place on road side with loading/unloading charges. |
| 140 | Upto 200 mtr. |
| 141 | Upto 500 mtr. |
| 142 | Upto 1000 mtr. |
| 143 | Upto 1500 mtr. |
| 144 | Beyond 1500 mtr. |
| 145 | 100 KVA Voltage Stablizer |
| 146 | Rewinding of copper Coil |
| 147 | Reconditioning of Copper Coil |
| 148 | Providing & Fitting of Rotary Switch as per size |
| 149 | Providing & Fitting of Indicator |
| 150 | Providing & Fitting of Selector Switch |
| 151 | Providing & Fitting of Amperemeter |
| 152 | Providing & Fitting of Voltmeter |
| 153 | Wiring Complete job with insultor |
| 154 | Disconnecting of power connection of the Voltage Stabilizer, dismantling of stabilizer by unscrewing nut bolts. Extracting out of stabilizer coil structure by mounting of chain pulley block with the help of manual skilled labour. |
| 155 | Disconnecting of power connection of damaged Voltage Stabilizer and reconnecting of repaired voltage stabilizer with proper thimbling and insulation with the help of skilled labor. |
| 156 | Dismantling and assembling of voltage stabilizer at workshop. |
| 157 | Assembling of stabilizer, connecting the power connections and testing on load. |
| 158 | Carriage/Shifting of 100 KVA Voltage Stabilzer from pump room on head load to and fro up to stacking place on road side with loading/unloading charges. |
| 159 | Upto 200 mtr. |
| 160 | Upto 500 mtr. |
| 161 | Upto 1000 mtr. |
| 162 | Upto 1500 mtr. |
| 163 | Beyond 1500 mtr. |
| 164 | 150 KVA Voltage Stablizer |
| 165 | Rewinding of copper Coil |
| 166 | Reconditioning of Copper Coil |
| 167 | Providing & Fitting of Rotary Switch as per size |
| 168 | Providing & Fitting of Indicator |
| 169 | Providing & Fitting of Selector Switch |
| 170 | Providing & Fitting of Amperemeter |
| 171 | Providing & Fitting of Voltmeter |
| 172 | Wiring Complete job with insultor |
| 173 | Disconnecting of power connection of the Voltage Stabilizer, dismantling of stabilizer by unscrewing nut bolts. Extracting out of stabilizer coil structure by mounting of chain pulley block with the help of manual skilled labour. |
| 174 | Disconnecting of power connection of damaged Voltage Stabilizer and reconnecting of repaired voltage stabilizer with proper thimbling and insulation with the help of skilled labor. |
| 175 | Dismantling and assembling of voltage stabilizer at workshop. |
| 176 | Assembling of stabilizer, connecting the power connections and testing on load. |
| 177 | Carriage/Shifting of 150 KVA Voltage Stabilzer from pump room on head load to and fro up to stacking place on road side with loading/unloading charges. |
| 178 | Upto 200 mtr. |
| 179 | Upto 500 mtr. |
| 180 | Upto 1000 mtr. |
| 181 | Upto 1500 mtr. |
| 182 | Beyond 1500 mtr. |
| 183 | 200 KVA Voltage Stablizer |
| 184 | Rewinding of copper Coil |
| 185 | Reconditioning of Copper Coil |
| 186 | Providing & Fitting of Rotary Switch as per size |
| 187 | Providing & Fitting of Indicator |
| 188 | Providing & Fitting of Selector Switch |
| 189 | Providing & Fitting of Amperemeter |
| 190 | Providing & Fitting of Voltmeter |
| 191 | Wiring Complete job with insultor |
| 192 | Disconnecting of power connection of the Voltage Stabilizer, dismantling of stabilizer by unscrewing nut bolts. Extracting out of stabilizer coil structure by mounting of chain pulley block with the help of manual skilled labour. |
| 193 | Disconnecting of power connection of damaged Voltage Stabilizer and reconnecting of repaired voltage stabilizer with proper thimbling and insulation with the help of skilled labor. |
| 194 | Dismantling and assembling of voltage stabilizer at workshop. |
| 195 | Assembling of stabilizer, connecting the power connections and testing on load. |
| 196 | Carriage/Shifting of 200 KVA Voltage Stabilzer from pump room on head load to and fro up to stacking place on road side with loading/unloading charges. |
| 197 | Upto 200 mtr. |
| 198 | Upto 500 mtr. |
| 199 | Upto 1000 mtr. |
| 200 | Beyound 1000 mtr. |
| 201 | 250 KVA Voltage Stablizer |
| 202 | Rewinding of copper Coil |
| 203 | Reconditioning of Copper Coil |
| 204 | Providing & Fitting of Rotary Switch as per size |
| 205 | Providing & Fitting of Indicator |
| 206 | Providing & Fitting of Selector Switch |
| 207 | Providing & Fitting of Amperemeter |
| 208 | Providing & Fitting of Voltmeter |
| 209 | Providing & Fitting of Nut Bolts |
| 210 | Wiring Complete job with insultor |
| 211 | Disconnecting of power connection of the Voltage Stabilizer, dismantling of stabilizer by unscrewing nut bolts. Extracting out of stabilizer coil structure by mounting of chain pulley block with the help of manual skilled labour. |
| 212 | Disconnecting of power connection of damaged Voltage Stabilizer and reconnecting of repaired voltage stabilizer with proper thimbling and insulation with the help of skilled labor. |
| 213 | Dismantling and assembling of voltage stabilizer at workshop. |
| 214 | Assembling of stabilizer, connecting the power connections and testing on load. |
| 215 | Carriage/Shifting of 250 KVA Voltage Stabilzer from pump room on head load to and fro up to stacking place on road side with loading/unloading charges. |
| 216 | Upto 200 mtr. |
| 217 | Upto 500 mtr. |
| 218 | Upto 1000 mtr. |
| 219 | Beyound 1000 mtr. |
| 220 | Oil Immersed Start Delta Starter |
| 221 | Repair of Star Delta Oil Immersed starter upto 20HP Capacity by way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 222 | Repair of Star Delta Oil Immersed starter upto 30HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 223 | Repair of Star Delta Oil Immersed starter upto 40HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 224 | Repair of Star Delta Oil Immersed starter upto 50HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 225 | Repair of Star Delta Oil Immersed starter upto 60HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 226 | Repair of Star Delta Oil Immersed starter upto 70HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 227 | Repair of Star Delta Oil Immersed starter upto 80HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 228 | Repair of Star Delta Oil Immersed starter upto 100HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 229 | Repair of Star Delta Oil Immersed starter upto 125HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 230 | Repair of Star Delta Oil Immersed starter upto 125-150HP Capacityby way of replacement of damaged contact points, no load coil, contact point holders , replacement of T oil and testing. |
| 231 | Repairing of 200 ampere main switch alonwith providing and fitting of HRC fuse set. |
| 232 | Repairing of 400 ampere main switch alonwith providing and fitting of HRC fuse set. |
| 233 | Providing and fitting of Heavy duty main switch of 100 amp capacity fitted with HRC. (Reputed make) |
| 234 | Providing and fitting of Heavy duty main switch of 200 amp capacity fitted with HRC. (Reputed make) |
| 235 | Providing and fitting of Heavy duty main switch of 400 amp capacity fitted with HRC. (Reputed make) |
| 236 | Providing and laying of Earthing of Electro Mechanical Machinery (Transformer/motors/LT Panels/Voltage Stablizer) Please Enable Macros to View BoQ information |