| 1 | 63 KVA Transformer |
| 2 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform and extracting out transformer core assembly by using chain pulley block, tripod stand and skilled labour etc. |
| 3 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform by using chain pulley block, tripod stand skilled labour etc. |
| 4 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform using JCB/hydra crane and skilled labour, loading in Mechanical Transport and unloading at workshop. |
| 5 | Draining of Transformer oil in barrels, dismantling of top cover and extracting out transformer core assembly using chain pulley block and tripod stand . |
| 6 | Reconditioning of LV copper coil per kg |
| 7 | Reconditioning of LV Aluminium coil per kg |
| 8 | Providing and fitting of HV leg coil copper S.E (per Kg) |
| 9 | Providing and fitting of HV leg coil copper DPC (per Kg) |
| 10 | Providing and fitting of HV leg coil Aluminium S.E (per Kg) |
| 11 | Providing and fitting of HV leg coil Aluminium DPC (per Kg) |
| 12 | Providing and fitting of LV leg coil copper DPC (per Kg) |
| 13 | Providing and fitting of LV leg coil Aluminium DPC (per Kg) |
| 14 | Providing & fitting of HV bushing |
| 15 | Providing & fitting of LV bushing |
| 16 | Providing & fitting of HV bush rod (metal part) per rod |
| 17 | Providing & fitting of LV bush rod (metal part) per rod |
| 18 | Providing & fitting of gasket set |
| 19 | Providing & fitting of LT terminal plate |
| 20 | Providing & fitting of Oil drain valve |
| 21 | Providing & fitting of core laminations per Kg |
| 22 | Providing & fitting of sundry items |
| 23 | Heat treatment of repaired transformer |
| 24 | Arresting of oil leakages if any by way of welding etc. |
| 25 | Painting of transformer body |
| 26 | Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. |
| 27 | Loading of repaired transformer into Mechanical Transport using hydra crane/JCB/chain pulley block and skilled labour at workshop and unloading/Mounting the transformer on poles/platform at site of installation. |
| 28 | Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions. |
| 29 | Carriage/shifting of 63 KVA Transformer from station on head load to and fro up to stacking place on road side with loading/unloading charges. |
| 30 | a) Upto 500 mtr. |
| 31 | b) Upto 1000 mtr. |
| 32 | c) Upto 1500 mtr |
| 33 | d) Upto 2000 mtr. |
| 34 | e) Beyond 2000 mtr. |
| 35 | 100 KVA Transformer |
| 36 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform and extracting out transformer core assembly by using chain pulley block, tripod stand and skilled labour etc. |
| 37 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform by using chain pulley block, tripod stand skilled labour etc. |
| 38 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform using JCB/hydra crane and skilled labour, loading in Mechanical Transport and unloading at workshop. |
| 39 | Draining of Transformer oil in barrels, dismantling of top cover and extracting out transformer core assembly using chain pulley block and tripod stand . |
| 40 | Reconditioning of LV copper coil per kg |
| 41 | Reconditioning of LV Aluminium coil per kg |
| 42 | Providing and fitting of HV leg coil copper S.E (per Kg) |
| 43 | Providing and fitting of HV leg coil copper DPC (per Kg) |
| 44 | Providing and fitting of HV leg coil Aluminium S.E (per Kg) |
| 45 | Providing and fitting of HV leg coil Aluminium DPC (per Kg) |
| 46 | Providing and fitting of LV leg coil copper DPC (per Kg) |
| 47 | Providing and fitting of LV leg coil Aluminium DPC (per Kg) |
| 48 | Providing & fitting of HV bushing |
| 49 | Providing & fitting of LV bushing |
| 50 | Providing & fitting of HV bush rod (metal part) per rod |
| 51 | Providing & fitting of LV bush rod (metal part) per rod |
| 52 | Providing & fitting of gasket set |
| 53 | Providing & fitting of LT terminal plate |
| 54 | Providing & fitting of Oil drain valve |
| 55 | Providing & fitting of core laminations per Kg |
| 56 | Providing & fitting of sundry items |
| 57 | Heat treatment of repaired transformer |
| 58 | Arresting of oil leakages if any by way of welding etc. |
| 59 | Painting of transformer body |
| 60 | Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. |
| 61 | Loading of repaired transformer into Mechanical Transport using hydra crane/JCB/chain pulley block and skilled labour at workshop and unloading/Mounting the transformer on poles/platform at site of installation. |
| 62 | Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions. |
| 63 | Carriage/shifting of 100 KVA Transformer from station on head load to and fro up to stacking place on road side with loading/unloading charges. |
| 64 | a) Upto 500 mtr. |
| 65 | b) Upto 1000 mtr. |
| 66 | c) Upto 1500 mtr |
| 67 | d) Upto 2000 mtr. |
| 68 | e) Beyond 2000 mtr. |
| 69 | 250 KVA Transformer |
| 70 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform and extracting out transformer core assembly by using chain pulley block, tripod stand and skilled labour etc. |
| 71 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform by using chain pulley block, tripod stand skilled labour etc. |
| 72 | Disconnecting of distribution transformer HT links and HT/LT side cables. Dismounting from poles/platform using JCB/hydra crane and skilled labour, loading in Mechanical Transport and unloading at workshop. |
| 73 | Draining of Transformer oil in barrels, dismantling of top cover and extracting out transformer core assembly using chain pulley block and tripod stand . |
| 74 | Reconditioning of LV copper coil per kg |
| 75 | Reconditioning of LV Aluminium coil per kg |
| 76 | Providing and fitting of HV leg coil copper S.E (per Kg) |
| 77 | Providing and fitting of HV leg coil copper DPC (per Kg) |
| 78 | Providing and fitting of HV leg coil Aluminium S.E (per Kg) |
| 79 | Providing and fitting of HV leg coil Aluminium DPC (per Kg) |
| 80 | Providing and fitting of LV leg coil copper DPC (per Kg) |
| 81 | Providing and fitting of LV leg coil Aluminium DPC (per Kg) |
| 82 | Providing & fitting of HV bushing |
| 83 | Providing & fitting of LV bushing |
| 84 | Providing & fitting of HV bush rod (metal part) per rod |
| 85 | Providing & fitting of LV bush rod (metal part) per rod |
| 86 | Providing & fitting of gasket set |
| 87 | Providing & fitting of LT terminal plate |
| 88 | Providing & fitting of Oil drain valve |
| 89 | Providing & fitting of core laminations per Kg |
| 90 | Providing & fitting of sundry items |
| 91 | Heat treatment of repaired transformer |
| 92 | Arresting of oil leakages if any by way of welding etc. |
| 93 | Painting of transformer body |
| 94 | Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. |
| 95 | Loading of repaired transformer into Mechanical Transport using hydra crane/JCB/chain pulley block and skilled labour at workshop and unloading/Mounting the transformer on poles/platform at site of installation. |
| 96 | Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions. |
| 97 | Carriage/shifting of 250 KVA Transformer from station on head load to and fro up to stacking place on road side with loading/unloading charges. |
| 98 | a) Upto 500 mtr. |
| 99 | b) Upto 1000 mtr. |
| 100 | c) Beyond 1000 mtr |
| 101 | Providing and filling of transformer oil for topping (per litre) |
| 102 | Rebate of old T-oil per ltr. |
| 103 | Rebate of burnt core lamination per kg Please Enable Macros to View BoQ information |