| 1 | Diversion of nallah/ dewatering of trenches during execution of work incld construction of diversion complete JOB |
| 2 | Earth work in excavation by mechanical means in trenches for foundations drains , pipes , cables etc. (exceeding 1.5 m in width ) and for shafts , wells , cesspits and the like exceeding 10 sqm on plan depth up to 5 m including disposal of excavated earth up to 50 m from cutting edge disposal earth is to be leveled and neatly dressed( in all kinds of soil) .(ABUTTS AND CRATES) |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : |
| 4 | P/L in position specified grade of cement concrete excld. the cost of centering , shuttering , finishing . 1:4:8 ( 1 cement :4 coarse sand : 8 graded stone agg. 40 mm nominal size) All works upto plinth level incld all carriages complete |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)(RAFT) |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 7 | P/L in position specified grade of cement concrete excld. the cost of centering , shuttering , finishing . 1:3:6 ( 1 cement :3coarse sand : 6 graded stone agg. 40 mm nominal size) All works upto plinth level incld all carriages complete APPROACHES |
| 8 | PLUMS |
| 9 | Centering and Shuttering including Strutting Propping etc and removal of form work:-(RAFT, ABUTT FOOTING , APPORACH) |
| 10 | Centering and Shuttering including Strutting Propping etc and removal of form work:- (ABUT STEM, CAP) |
| 11 | Reinforcement for Rcc work, Including binding , cutting, bending, straightening complete incld carriages involved. |
| 12 | Bearings Providing and installing in position of POT- PTFE/ Elastomeric bearings at free/ fixed ends of Truss girder. over abutments and pier locations as per drawings which shall include the following: |
| 13 | Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete |
| 14 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 15 | Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates |
| 16 | Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials |
| 17 | Supply of stones 60% Available |
| 18 | Cost of crates 4 mm GI wire |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work |
| 20 | Supply and filling of GSB/Nallah Muck Watering,Ramming,Consolidation etc i/c all carriages |
| 21 | Carriage of materials from nearest source to site Strc steel Carriage upto 25 kms ( Rs/ Ton) |
| 22 | Stone aggregates from a lead of 30 Kms |
| 23 | sand/fine aggregate from a lead of 30kms |
| 24 | Stones from a lead of 20 Kms |
| 25 | Provision for photographs and sign board INCLD FOUDATION STONE L/S Please Enable Macros to View BoQ information |