| 1 | Horizontal Centrifugal Pump RKB Make |
| 2 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) |
| 3 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) |
| 4 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) |
| 5 | Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump) |
| 6 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump) |
| 7 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump) |
| 8 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump) |
| 9 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump) |
| 10 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump) |
| 11 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (11 Stage Pump) |
| 12 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump) |
| 13 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification.( Beyond 12 Stage Pump) |
| 14 | Providing and fitting of Brass Impeller as per sample |
| 15 | Providing and fitting of C.I Impeller as per sample |
| 16 | Repairing of brass Impeller |
| 17 | Repairing of C.I Impeller |
| 18 | Fabrication & fitting of neck ring. |
| 19 | Fabrication & fitting of diffuser bush |
| 20 | Fabrication of Stainless steel gland bush |
| 21 | Fabrication of chuck nut |
| 22 | Providing & Fitting of pump bowl |
| 23 | Repair to bearing housing by sleeve fitting & boring for bearing size |
| 24 | Providing of bearing housing along with side cover plate |
| 25 | Providing and fitting of Delivery Body |
| 26 | Providing and fitting of Suction Body |
| 27 | Replacement of ball thrust bearing-7307 |
| 28 | Replacement of ball thrust bearing-7308 |
| 29 | Replacement of ball thrust bearing-7309 |
| 30 | Providing and fitting of diffuser |
| 31 | Replacement of Roller bearing-N-307 |
| 32 | Replacement of Roller bearing-N-308 |
| 33 | Replacement of Roller bearing-N-309 |
| 34 | Providing & Fitting of Oil seal |
| 35 | Providing & Fitting Coupling bolts nuts & rubber bushes. |
| 36 | Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop. |
| 37 | Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop. |
| 38 | Dismantling & fitting of Pump (Beyond 10 stage) at work Shop. |
| 39 | Horizontal Centrifugal Pump Mather & Platt Make |
| 40 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) |
| 41 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) |
| 42 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) |
| 43 | Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump) |
| 44 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump) |
| 45 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump) |
| 46 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump) |
| 47 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump) |
| 48 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump) |
| 49 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (11 Stage Pump) |
| 50 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump) |
| 51 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (Beyond 12 Stage Pump) |
| 52 | Providing and fitting of Brass Impellers as per sample |
| 53 | Providing and fitting of C.I Impellers as per sample |
| 54 | Repairing of brass Impellers |
| 55 | Repairing of C.I Impellers |
| 56 | Fabrication & fitting of neck ring. |
| 57 | Fabrication & fitting of spacer bushes. |
| 58 | Fabrication of Stainless steel gland bushes |
| 59 | Providing & Fitting of pump bowl |
| 60 | Repair to bearing housing by sleeve fitting & boring for bearing size |
| 61 | Providing/Fitting of bearing housing along with side cover plates |
| 62 | Providing and fitting of Delivery Body |
| 63 | Providing and fitting of Suction Body |
| 64 | Replacement of ball thrust bearing-6306 |
| 65 | Replacement of Roller bearing-NU-306 |
| 66 | Providing & Fitting of Oil seal |
| 67 | Fabrication & fitting of balancing plate |
| 68 | Providing & Fitting Coupling bolts nuts & rubber bushes. |
| 69 | Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop. |
| 70 | Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop. |
| 71 | Dismantling & fitting of Pump (Beyond 10 stage) at work Shop. |
| 72 | Horizontal Centrifugal Pump KSB Make |
| 73 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) |
| 74 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) |
| 75 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) |
| 76 | Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump) |
| 77 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump) |
| 78 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump) |
| 79 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump) |
| 80 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump) |
| 81 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump) |
| 82 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (11 Stage Pump) |
| 83 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump) |
| 84 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (Beyond 12 Stage Pump) |
| 85 | Providing and fitting of Brass Impellers as per sample |
| 86 | Providing and fitting of C.I Impellers as per sample |
| 87 | Repairing of brass Impellers |
| 88 | Repairing of C.I Impellers |
| 89 | Fabrication & fitting of neck ring. |
| 90 | Fabrication & fitting of body bushes. |
| 91 | Fabrication of Stainless steel gland bushes |
| 92 | Fabrication of chuck nut |
| 93 | Providing & Fitting of pump bowl |
| 94 | Repair to bearing housing by sleeve fitting & boring for bearing size |
| 95 | Providing/Fitting of bearing housing along with side cover plates |
| 96 | Providing and fitting of Delivery Body |
| 97 | Providing and fitting of Suction Body |
| 98 | Replacement of ball thrust bearing-7309 |
| 99 | Replacement of ball thrust bearing-7308 |
| 100 | Providing & Fitting of Oil seal |
| 101 | Providing & Fitting Coupling bolts nuts & rubber bushes. |
| 102 | Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop. |
| 103 | Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop. |
| 104 | Dismantling & fitting of Pump (Beyond 10 stage) at work Shop. |
| 105 | Horizontal Centrifugal Pump FNC Make |
| 106 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) |
| 107 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) |
| 108 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) |
| 109 | Providing, Fabrication & fitting of new S.S. pump shaft as per size and specification. (5 Stage Pump) |
| 110 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (6 Stage Pump) |
| 111 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (7 Stage Pump) |
| 112 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (8 Stage Pump) |
| 113 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (9 Stage Pump) |
| 114 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (10 Stage Pump) |
| 115 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (11 Stage Pump) |
| 116 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (12 Stage Pump) |
| 117 | Providing, Fabrication & fitting of new S.S.pump shaft as per size and specification. (Beyond 12 Stage Pump) |
| 118 | Providing and fitting of Brass Impellers as per sample |
| 119 | Providing and fitting of C.I Impellers as per sample |
| 120 | Repairing of brass Impellers |
| 121 | Repairing of C.I Impellers |
| 122 | Fabrication & fitting of neck ring. |
| 123 | Fabrication & fitting of body bushes. |
| 124 | Fabrication of Stainless steel gland bushes |
| 125 | Fabrication of chuck nut |
| 126 | Providing & Fitting of pump bowl |
| 127 | Repair to bearing housing by sleeve fitting & boring for bearing size |
| 128 | Providing of bearing housing along with side cover plates |
| 129 | Providing and fitting of Delivery Body |
| 130 | Providing and fitting of Suction Body |
| 131 | Replacement of Roller bearing-N-204 |
| 132 | Replacement of Roller bearing-N-205 |
| 133 | Providing & Fitting of Oil seal |
| 134 | Fabrication & fitting of balancing plate |
| 135 | Providing & Fitting Coupling bolts nuts & rubber bushes. |
| 136 | Dismantling & fitting of Pump (3 stage to 5 stage) at work Shop. |
| 137 | Dismantling & fitting of Pump (6 stage to 10 stage) at work Shop. |
| 138 | Dismantling & fitting of Pump (Beyond 10 stage) at work Shop. |
| 139 | Submersible Pump {V-8} |
| 140 | Repairing of pump shaft by welding, turning, polishing & making of key ways |
| 141 | Fabrication / providing of pump shaft as per exact size & specification (up to 5 stage) |
| 142 | Fabrication / providing of S.S. pump shaft as per exact size & specification (6 stage to 10 stage) |
| 143 | Fabrication / providing of pump shaft as per exact size & specification (11 stage to 15 stage) |
| 144 | Fabrication / providing of S.S. pump shaft as per exact size & specification (Beyond 15 stage) |
| 145 | Fabrication / providing of Impeller |
| 146 | Repairs to Impeller |
| 147 | Fabrication / providing of Neck Ring |
| 148 | Fabrication / providing of Body Bush |
| 149 | Fabrication / providing of Guide Bush |
| 150 | Fabrication / providing of Spacer Bush |
| 151 | Fabrication / providing of Cotter |
| 152 | Fabrication / providing of Coupling pulley with cotter for V-8 submersible pump set |
| 153 | Fabrication / providing of Pump Body along with studs |
| 154 | Fabrication / providing of intermediate bowl body |
| 155 | Fabrication / providing of Suction Body |
| 156 | Fabrication / providing of NRV with adaptor for V8 pump |
| 157 | Fabrication / providing of flanged adaptor with threading at other end for V8 pump |
| 158 | Dismantling and fitting charges of V-8 submersible pump at work Shop |
| 159 | Submersible Pump {V-6} |
| 160 | Repairing of pump shaft by welding, turning, polishing & making of key ways |
| 161 | Fabrication / providing of pump shaft as per exact size & specification (up to 5 stage) |
| 162 | Fabrication / providing of S.S. pump shaft as per exact size & specification (6 stage to 10 stage) |
| 163 | Fabrication / providing of pump shaft as per exact size & specification (11 stage to 15 stage) |
| 164 | Fabrication / providing of S.S. pump shaft as per exact size & specification (Beyond 15 stage) |
| 165 | Fabrication / providing of impeller |
| 166 | Providing/Fitting of V-6 plastic impeller |
| 167 | Repairs to Impeller |
| 168 | Fabrication / providing of Neck Ring |
| 169 | Fabrication / providing of Body Bush |
| 170 | Fabrication / providing of Guide Bush |
| 171 | Fabrication / providing of Spacer Bush |
| 172 | Fabrication / providing of Cotter |
| 173 | Fabrication / providing of Pump Body |
| 174 | Fabrication / providing of Suction Body |
| 175 | Fabrication / providing of Coupling pulley with cotter for V-6 Submersible pump motor set |
| 176 | Fabrication / providing of intermediate bowl body |
| 177 | Dismantling and fitting charges of pump at workshop |
| 178 | Submersible Pump {V-4} |
| 179 | Repairing of pump shaft by welding, turning, polishing & making of key ways |
| 180 | Fabrication / providing of pump shaft as per exact size & specification |
| 181 | Fabrication / providing of impeller |
| 182 | Providing/Fitting of V-4 plastic impeller |
| 183 | Repairs to Impeller |
| 184 | Fabrication / providing of Neck Ring |
| 185 | Fabrication / providing of Body Bush |
| 186 | Fabrication / providing of Guide Bush |
| 187 | Fabrication / providing of Spacer Bush |
| 188 | Fabrication / providing of Cotter |
| 189 | Fabrication / providing of Coupling pulley with cotter |
| 190 | Fabrication / providing of Pump Body |
| 191 | Fabrication / providing of Suction Body |
| 192 | Dismantling and fitting charges of V-4 submersible pump at work Shop. |
| 193 | Miscelleanous |
| 194 | Fabrication & providing of 80 mm dia. flanged adaptor with threading at other side |
| 195 | Fabrication & providinf of 65 mm dia. flanged adaptor with threading at other side |
| 196 | Fabrication & providing of 100 mm dia. flanged adaptor with threading at other side |
| 197 | Fabrication & providing of 50 mm dia. flanged adaptor with threading at other side |
| 198 | Fabrication & providing of MS Clamp 2½\\" |
| 199 | Fabrication & providing of MS Clamp 3\\" |
| 200 | Fabrication & providing of MS Clamp 4\\" |
| 201 | Fabrication & providing of MS Clamp 6\\" |
| 202 | Fabrication of Shling for holding of 05 Ton capacity Chain block for same load |
| 203 | Providing and Fabrication of GI column pipes of 100 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. |
| 204 | Providing and Fabrication of GI column pipes of 80 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. |
| 205 | Providing and Fabrication of GI column pipes of 65 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. |
| 206 | Providing and Fabrication of Top column pipe of 100 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. |
| 207 | Providing and Fabrication of Top column pipe of 80 mm dia. 10 feet in length suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. |
| 208 | Fabrication of Top column pipe of 65 mm dia. 10 feet in length each (GI pipe to be provided by the department) suitable for lowering inside -200 mm dia. casing of B/W by way of turning both the ends of each column pipe on lathe . Providing & welding suitable MS flanges with 04 No. holes on each side of column pipe with proper alignment. The column pipe shall be fabricated by providing one No. MS Flange of size 250 mm dia. in the centre so as to rest the complete connected column pipes with submersible pump motor set on 200 mm casing pipe and 01 No. Bend of requisite size. |
| 209 | Fabrication of Foundation Bolts 21 No.welded with extended Steel and Chuck Nut |
| 210 | Fabrication of Foundation Bolts 24 No.welded with extended Steel and Chuck Nut |
| 211 | Fabrication of Foundation Bolts 27 No.welded with extended Steel and Chuck Nut |
| 212 | Fabrication of Foundation Bolts 32No.welded with extended Steel and Chuck Nut |
| 213 | Replacement by providing & fitting of bearing-7307 (SKF/NBC/FAG/Reputed make) |
| 214 | Replacement by providing & fitting of bearing-7308 (SKF/NBC/FAG/Reputed make) |
| 215 | Replacement by providing & fitting of bearing-7309 (SKF/NBC/FAG/Reputed make) |
| 216 | Replacement by providing & fitting of bearing-6209 (SKF/NBC/FAG/Reputed make) |
| 217 | Replacement by providing & fitting of bearing-6212 (SKF/NBC/FAG/Reputed make) |
| 218 | Replacement by providing & fitting of bearing-6213 (SKF/NBC/FAG/Reputed make) |
| 219 | Replacement by providing & fitting of bearing NU-204 (SKF/NBC/FAG/Reputed make) |
| 220 | Replacement by providing & fitting of bearing NU-205 (SKF/NBC/FAG/Reputed make) |
| 221 | Replacement by providing & fitting of bearing NU-206 (SKF/NBC/FAG/Reputed make) |
| 222 | Replacement by providing & fitting of bearing NU-208 (SKF/NBC/FAG/Reputed make) |
| 223 | Replacement by providing & fitting of bearing NU-308 (SKF/NBC/FAG/Reputed make) |
| 224 | Replacement by providing & fitting of bearing NU-309 (SKF/NBC/FAG/Reputed make) |
| 225 | Replacement by providing & fitting of bearing N- 6305 (SKF/NBC/FAG/Reputed make) |
| 226 | Replacement by providing & fitting of bearing 6306-ZZ (SKF/NBC/FAG/Reputed make) |
| 227 | Replacement by providing & fitting of bearing 6307-ZZ (SKF/NBC/FAG/Reputed make) |
| 228 | Replacement by providing & fitting of bearing 6308-ZZ (SKF/NBC/FAG/Reputed make) |
| 229 | Replacement by providing & fitting of bearing 6309-ZZ (SKF/NBC/FAG/Reputed make) |
| 230 | Replacement by providing & fitting of bearing 6310-ZZ (SKF/NBC/FAG/Reputed make) |
| 231 | Replacement by providing & fitting of bearing 6311-ZZ (SKF/NBC/FAG/Reputed make) |
| 232 | Replacement by providing & fitting of bearing 6312-ZZ (SKF/NBC/FAG/Reputed make) |
| 233 | Replacement by providing & fitting of bearing 6313-ZZ (SKF/NBC/FAG/Reputed make) |
| 234 | Replacement by providing & fitting of bearing - 6314 (SKF/NBC/FAG/Reputed make) |
| 235 | Replacement by providing & fitting of bearing - 6315 (SKF/NBC/FAG/Reputed make) |
| 236 | Replacement by providing & fitting of bearing - 6316 (SKF/NBC/FAG/Reputed make) |
| 237 | Providing//Fitting Star Coupling Complete L-150 (Reputed Make) |
| 238 | Providing//Fitting Star Coupling Complete L-190 (Reputed Make) |
| 239 | Providing//Fitting Star Coupling Complete L-225 (Reputed Make) |
| 240 | Providing//Fitting Star Coupling Complete L-226 (Reputed Make) |
| 241 | Fabrication / providing of heavy duty flanged type coupling pulley set machined to exact size with cotters and coupling bolts. |
| 242 | Providing & fitting of 50 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 243 | Providing & fitting of 65 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 244 | Providing & fitting of 80 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 245 | Providing & fitting of 100 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 246 | Providing & fitting of 150 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 247 | Providing & fitting of 50 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 248 | Providing & fitting of 65 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 249 | Providing & fitting of 80 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 250 | Providing & fitting of 100 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 251 | Providing & fitting of 150 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 252 | Providing of Gland Packing of assorted size 8mm, 10mm, 12mm (Champion/Reputed Make) |
| 253 | Providing of Rubber insertion Sheet (Reputed Make ) |
| 254 | Providing of Nut Bolts of assorted size & length (19 no.,21 no.,24 no. 27 no. etc.) |
| 255 | Providing of Puncher Roll (Reputed Make) |
| 256 | Providing of Insulation Tape (Reputed Make) |
| 257 | Repairs to V-4 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 258 | Repairs to V-6 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 259 | Repairs to V-8 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set.Repair of thrust pad 01 set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 260 | Repairs to V-4 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 261 | Repairs to V-6 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 262 | Repairs to V-8 submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set.P/F of studs with nuts and T-bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 263 | Repair to submersible Motor (V-6) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing. |
| 264 | Repair to submersible Motor (V-8) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing. |
| 265 | Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
| 266 | Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
| 267 | Repair to 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
| 268 | Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
| 269 | Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
| 270 | Repair to 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
| 271 | Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
| 272 | Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
| 273 | Repair to 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
| 274 | Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
| 275 | Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
| 276 | Repair to 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
| 277 | Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
| 278 | Repair to 70 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor. |
| 279 | Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor. |
| 280 | Repair to 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor. |
| 281 | Repair to 20 HP to 50HP motor by way of replecement of bearing at DE end and assembling of motor. |
| 282 | Repair to 51 HP to 100HP motor by way of replecement of bearing at DE end and assembling of motor. |
| 283 | Repair to 20 HP to 50HP motor by way of replecement of bearing at NDE end and assembling of motor. |
| 284 | Repair to 51 HP to 100HP motor by way of replecement of bearing at NDE end and assembling of motor. |
| 285 | Repair to 20 HP to 50HP motor by way of replecement of bearing at DE and NDE end and assembling of motor. |
| 286 | Repair to 51 HP to 100HP motor by way of replecement of bearing at DE and NDE end and assembling of motor. |
| 287 | Dismantling of damaged HC pump from the base frame by way of unscrewing nut /bolts. Refitting of repaired pump by way of mounting on the base frame, making alignment then coupling with the motor with the help of skilled labours. The job includes cost material such nuts/bolts, washers and sundry items. Testing the HCP on load. |
| 288 | Up to 7 stage. |
| 289 | 7 stage -14 stage. |
| 290 | Labour Charges for carriage/shifting of damaged/repaired HC pump from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges. (Up to 07 stage.) |
| 291 | Up to 200 mtr.. |
| 292 | Up to 500 mtr.. |
| 293 | Up to 1000 mtr.. |
| 294 | Up to 1500 mtr.. |
| 295 | Beyond 1500 mtr.. |
| 296 | Labour Charges for carriage/ shifting of damaged/repaired HC pump from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges. (7 stage to 14 stage.) |
| 297 | Up to 200 mtr.. |
| 298 | Up to 500 mtr.. |
| 299 | Up to 1000 mtr.. |
| 300 | Up to 1500 mtr.. |
| 301 | Beyond 1500 mtr.. |
| 302 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-4) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 303 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-6) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 304 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-8) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 305 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-6) from dugwell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 306 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-8) from dugwell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 307 | Loading of damaged Submersible Pump (V6) from site of work by way of head load carriage to Mechanical Transport and carriage back to site of work after repairing and unloading at site. |
| 308 | Up to 200 mtr.. |
| 309 | Up to 500 mtr.. |
| 310 | Up to 1000 mtr.. |
| 311 | Up to 1500 mtr.. |
| 312 | Beyond 1500 mtr.. |
| 313 | Loading of damaged Submersible Pump (V8) from site of work by way of head load carriage to Mechanical Transport and carriage back to site of work after repairing and unloading at site. |
| 314 | Up to 200 mtr.. |
| 315 | Up to 500 mtr.. |
| 316 | Up to 1000 mtr.. |
| 317 | Up to 1500 mtr.. |
| 318 | Beyond 1500 mtr.. Please Enable Macros to View BoQ information |