|
| 1 | Earth work in excavation by manual means in trenches for foundations,drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, includingdressing of sides and ramming of bottoms lift upto 1.5 m, including gettingout excavated earth and disposal of surplus excavated earth as directed All kinds of soil : |
| 2 | P/L of nllah muck soling hand packed for foundation i/c carriage . complete job.(I/C 10% Deduction of voids) |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 40mm nominal size aggregate.with 20% Plum |
| 5 | PLUMS |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) for foundation. |
| 7 | B/W WITH COMMON BURNT CLAY F.P.S(NON MODULAR) BRICKS OF CLASS DESIGNATION 75 IN FOUNDATION AND PLINTH INCLD CURING IN 1:6 MIX |
| 8 | 12mm Cement plaster of mix: 1 : 6 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 10 | Centering and Shuttering etc and removal of formwork |
| 11 | Centering and Shuttering etc and removal of formwork for Suspended Floors (avg) |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Mild steel and medium tensile steel bars |
| 13 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. |
| 14 | Providing and fixing 1st quality ceramic glazed floor tiles conforming toIS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete |
| 15 | Carriage of materials sand and agg 40 km INCLD 50MH/L |
| 16 | CARRIAGE OF BRICK BY50 KM MT |
| 17 | Providing & fixing White vitreous china water closet squatting pan(Indian type) along with “S” or “P” trap incl. 10 litre low level flushing cistern Long pattern W.C Pan of size 580x440 mm |
| 18 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank |
| 19 | P/f of bib cocks /Angle Cocks of 15mm nominal bore of quality like PVC TYPE |
| 20 | Providing and fixing 3 layer PP-R (Poly propylene Random copolymer)pipes conforming to IS: 15801, UV stabilized and anti-microbial fusionwelded, having thermal stability for hot and cold water supply includingall PP-R plain and brass threaded Polypropylene random fittings. Thisincludes testing of joints complete as per direction of Engineer-incharge.16mm |
| 21 | PVC SOIL WASTE PIPE 100MM INCLUDING NECESSARY FITTING |
| 22 | PVC SOIL WASTE PIPE 75MM INCLUDING NECESSARY FITTING |
| 23 | Providing anfd fixing of S/S doors and vents as frame including all necessary Fitting Items.DOOR AND SHUTTER |
| 24 | P/F OF COLOURED CGI SHEET FOR DOORS COMPLETE JOB |
| 25 | Add Provision for CIB |