| 1 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-4) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 2 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-6) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 3 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-8) from borewell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 4 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-6) from dugwell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 5 | Disconnecting of power connections from Starter/Panel, extraction of submersible pump set (V-8) from dugwell along with column pipes by way of hoisting chain pulley block. Then lowering of repaired submersible pump set along with column pipes, making of power connections to Starter/Panel. Complete job includes cost of material such as nut/bolts, insulation tapes, thimbles & gaskets etc. and labour charges (skilled/semi- skilled). |
| 6 | Labour Charges for carriage/ shifting of submersible pump set from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges. (Up to 25 HP) |
| 7 | Up to 200 mtr. |
| 8 | Up to 500 mtr. |
| 9 | Up to 1000 mtr. |
| 10 | Up to 1500 mtr. |
| 11 | Beyond 1500 mtr. |
| 12 | Labour Charges for carriage/ shifting of submersible pump set from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges. ( 26 HP to 50 HP) |
| 13 | Up to 200 mtr. |
| 14 | Up to 500 mtr. |
| 15 | Up to 1000 mtr. |
| 16 | Up to 1500 mtr. |
| 17 | Beyond 1500 mtr. |
| 18 | Labour Charges for carriage/ shifting of submersible pump set from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges. ( 51 HP to 75 HP) |
| 19 | Up to 200 mtr. |
| 20 | Up to 500 mtr. |
| 21 | Up to 1000 mtr. |
| 22 | Up to 1500 mtr. |
| 23 | Beyond 1500 mtr. |
| 24 | Dismantling/assembling and testing of Submersible pump set at workshop including loading/unloading. |
| 25 | Disconnecting of Power connections from starter/ panel, disconnecting from delivery line and extracting out mono Submersible Pump Set complete along with column pipes and submersible cable by hoisting chain pulley block/Manual labour at Dug Well/Percolation Well. The job also includes stacking of column pipes at suitable place and loading of damaged mono submersible Pump Set in Mechanical transport. |
| 26 | Lowering of standby/repaired mono submersible pump set alongwith column pipes and submersible cable by hoisting chain pulley block/Manual labour at Dug Well/Percolation Well. The job includes connecting of power connection to starter/panel with proper thimbling, insulation and connecting delivery of pump with the pipe line. Complete job includes cost of labour, nut bolts, rubber joints, insulation material etc. at site of work. |
| 27 | Dismantling/assembling and testing of mono Submersible pump set at workshop including loading/unloading. |
| 28 | Labour Charges for carriage/ shifting of mono submersible pump set from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges |
| 29 | Complete rewinding of Submersible motors |
| 30 | 3.0 HP |
| 31 | 5.0 HP |
| 32 | 7.5 HP |
| 33 | 10.0 HP |
| 34 | 12.5 HP |
| 35 | 15.0 HP |
| 36 | 17.5 HP |
| 37 | 20.0 HP |
| 38 | 22.5 HP |
| 39 | 25.0 HP |
| 40 | 27.5 HP |
| 41 | 30.0 HP |
| 42 | 33.0 HP |
| 43 | 35.0 HP |
| 44 | 37.0 HP |
| 45 | 40.0 HP |
| 46 | 45.0 HP |
| 47 | 50.0 HP |
| 48 | 60.0 HP |
| 49 | 75.0 HP |
| 50 | Complete rewinding of Submersible Motors (Single Phase) |
| 51 | 1.5 HP |
| 52 | 2.00 HP |
| 53 | 3.00 HP |
| 54 | Complete rewinding of Open well Mono sub motors (three phase) |
| 55 | 7.5HP |
| 56 | 10 HP |
| 57 | 12.5 HP |
| 58 | 15 HP |
| 59 | 20 HP |
| 60 | Complete rewinding of Horizontal Squirel Cage Motors High Speed (Three Phase) |
| 61 | 7.5 HP |
| 62 | 10.0 HP |
| 63 | 12.5 HP |
| 64 | 15.0 HP |
| 65 | 20.0 HP |
| 66 | 25.0 HP |
| 67 | 30.0 HP |
| 68 | 35.0 HP |
| 69 | 40.0 HP |
| 70 | 50.0 HP |
| 71 | 60.0 HP |
| 72 | 75.0 HP |
| 73 | 80.0 HP |
| 74 | 100.0 HP |
| 75 | Disconnecting of power connection of damaged induction motor then dismantling from base frame by way of unscrewing of nuts bolts. Refitting by way of mounting of repaired motor on the base frame, making alignment then coupling with the pump and making of power connections with the help of skilled labours. The job includes cost of copper thimbles, nuts/bolts, sundry items and testing of HCP set on load. |
| 76 | Up to 40HP |
| 77 | 41 HP to 60HP |
| 78 | 61 HP to 100HP |
| 79 | Labour Charges for carriage/ shifting of induction motor from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges. ( Upto 40 HP) |
| 80 | Up to 200 mtr. |
| 81 | Up to 500 mtr. |
| 82 | Up to 1000 mtr. |
| 83 | Up to 1500 mtr. |
| 84 | Beyond 1500 mtr. |
| 85 | Labour Charges for carriage/ shifting of induction motor from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges. ( 41HP to 60 HP) |
| 86 | Up to 200 mtr. |
| 87 | Up to 500 mtr. |
| 88 | Up to 1000 mtr. |
| 89 | Up to 1500 mtr. |
| 90 | Beyond 1500 mtr. |
| 91 | Labour Charges for carriage/ shifting of induction motor from Pumping station to road side and back to pumping station on Head Load including loading/unloading charges. ( 61HP to 100 HP) |
| 92 | Up to 200 mtr. |
| 93 | Up to 500 mtr. |
| 94 | Up to 1000 mtr. |
| 95 | Up to 1500 mtr. |
| 96 | Beyond 1500 mtr. Please Enable Macros to View BoQ information |