|
| 1 | Dismantling aluminum /Gypsum partitions,doors,windows,fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. |
| 2 | Providing and fixing tiled false ceiling of specified materials of size 595x595 mm in true horizontal level, suspended on inter locking metal grid of hol dipped galvanized steel sections (galvanized @120 grams/sqm, both side inclusive) consisting of main \\"T\\" runner with suitably spaced joints to get required length and of size 24x38 mm made from 0.30 imm thick (minimum) sheet, spaced at 1200 mm center to center and Cross T of size 24x25 mm made of 0.30 mm thick (minimum) sheel, 1200 mm long spaced between main \\"T\\" at 600 mm center to center to form a grid of 1200x600 mm and secondary cross \\"T\\" of length 600 mm and size 24x25 mm made of 0.30 mm thick (minimum) sheet to be interlocked at middle of the 1200x600 mm panel to form grids of 600x600 mm and wall angle of size 24x24x0.3 mm and laying false ceiling tiles of approved texture in the grid including, required culting/making, opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc. Main \\"T\\" runners to be suspended from ceiling using Gl slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long dash fasteners, 4 mm Gl adjustable rods with galvanised butterfly level clips of size 85 x 30 x 0.8 mm spaced at 1200 mm center to center along main T, bollom exposed width of 24 mm of all T-sections shall be pre-painted with polyester paint, 12.5 mm thick fully Perforated Gypsum Board tile made from plasterboard having glass fibre conforming to IS:2005 part 1, of size 595x595 mm, having perforation of 9.7x9.7 mm al 19.4 mm c/c with center borders of 48 mm and the side borders of 30 mm, backed with non woven tissue on the back side, having an NRC (Noise Reduction Coefficient) of 0.79, with 50 mm resin bonded glass wool backing all complete for all heights as per specifications, drawings and as directed by Engineer-in-charge. |
| 3 | Demolishing cement concreate 1:3:6 or richer mix (i/c equivalet design mix)manually/ by mechanical means including disposal of material within 50 metres leads as per direction of engineer-in-charge. |
| 4 | Hard core of gauge not exceeding 63mm, deposited, spread and levelled in layers not exceeding 15cm thick watered and well rammed to a true surface complete all as specified and as directed. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level. 1:2:4 (1 Cement: 2 coarse sand (zone-III) derived from natural sources 4 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | Earth work in excavation in all kind of soils by mechanical means (Hydraulic Cu excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. |
| 7 | Earth work in excavation in all kind of ordinary rocks by mechanical means (Hydraulic Cu excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 9 | Removing excavated surplus earth to a distance of 500 m and depositing where directed at a level n exc 1.5m above the starting point all as specifiedand as directed. |
| 10 | Dismantling bituminous road manually/ by mechanical means including stacking of serviceable malerial and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 11 | Earth work in surface excavation / dressing in all kind of soils not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge |
| 12 | Preparation and consolidation of subgrade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. |
| 13 | Providing 150 mm thick (spread thickness) soling (or sub base) with broken boulders or quarried stones, interstices filled, surfaces formed and rolled & consolidated to required gradient & chamber with 8 to 12 tonne power roller, complete all as specified and as directed. |
| 14 | Providing and applying Two layer of 75 mm thick each (compacted thickness) WBM with coarse aggregates of lime/sand stone, flint or quartzite of grading 2 (63 mm to 40 mm size) spread, rolled and consolidated to gradient and chamber required with power roller 8 to 12 tonne complete all as specified and as directed. |
| 15 | Providing and applying pnming/fack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler cleaning and preparing the existing road surface as per specifications: On W.B.M. @ 0.75 Kg/sqm |
| 16 | Providing and laying 75mm thick (compacted thickness) bituminous macadam with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previous y prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. |
| 17 | Providing and applying priming/tack coat using hot straight run bitumen of grade VG 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen bciler, cleaning and preparing the existing road surface as per specifications: On bituminous surface @ 0.50 Kg/sqm |
| 18 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. |
| 19 | M & L for Constructing brick masonry manhole in cement mortar 14 (1Cement 4 coarsesand) E wath RCC top slab with 1:1.5:3 mix (1Cement 1.5 Coarse sand (Zone-III) 3 graded stone aggngate 20mm nominal size), foundation concrete 1.4.8 mix (1Cement: 4 Coarse sand (Zone-III) 8 graded stone aggrigate 40mm nominal size), inside plastenng 12mm thick with cement mortar 1.3 (1Cement 3 Coarse sand) finished with floating coat of neat cement and making channels in cement concree 1.2:4 (1 Cement 2 Coarse snad 4 graded stone aggregate 20mm nominal size finished with a floating coat of neat cement complete as per standard design of inside size 90x80 cm and 45 cm deep incl. CI. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) with comman burnt clay FPS (non modular) backs of class designation 7.5, |
| 20 | M & L for Reinforced concrete 200 mm dia pipe class NP-2 laid & jointed complete with collars, complete all as specified and directed. |
| 21 | M & L for Cement concrete (1:3:6) type C2 using 40mm graded crushed stone aggregate as in bed of RCC NP-2 pipe 200mm bore including packing under and haunching against the sides of pipes after laying and testing complete all as specified |
| 22 | HOT WATER GENERATOR FOR WINTER HEATINGHot Water BoilerSupplying, fixing, testing and commissioning of Horizontal fire tube boiler operative. All accessories, Including automatic burner pre heaters interconnecting H.P. flexible/ copper piping. Fuel pumping and blower with damper & auto electric sequance control/ operational panel complete all as specified of 4,00,000 Kcal / Hr Each, (1W+1S).The job includes PCC foundation in 1:2:4 as directed by OEM and Engineer-in Charge. Hot Water Outlet Temperature : 90 deg C (194˚ F)Hot Water Inlet Temperature : 70 deg C (158˚ F)Capacity in KW : 465Hot Water Generator 4,00,000 Kcal (1W+1S)Note : Testing of heating plant shall be carried out by the contractor on GE's own fomat as prescribed. This note is applicable for Item No 22 to 53.07 of this BOQ |
| 23 | Supply,Installation, testing & commissioning of centrifugal End sunction pump set factory assembled & tested for rated efficiency.compatible motor with class F insulation & common base frame, coupling guard, cladded insulation, etc. for re-circulation of hot water for the central Heating system. The pumps shall be suitable for operation on 415 ± 10% Volts, 50 Hz, 3 Phase AC power supply, The pump characteristic shall be as follows : |
| 24 | Hot Water PUMP for Heating (1 Working+ 1 Stand by) Primery CircuitWater flow rate : 20 MTR cubic.Head : 32 MTRMotor HP : 10 HP (suggested) or as per actual selection |
| 25 | Hot Water PUMP for Heating (1 Working+ 1 Stand by) Secondary CircuitWater flow rate : 465 USGPMHead : 45 MTRMotor HP : 30 HP (suggested) or as per actual selection |
| 26 | PRESSURLESS HOT WATER EXPANSION TANKSupplying, installing, testing and commissioning of Pressure less HOT WATER EXPANSION TANK suitable for total volume of water in Hot water circuits along with necessary accessories such as centrifugal air separator, pumps etc. The tank shall be precharged steel expansion tank with replaceable heavy duty butyl rubber bladder. The tank shall have 50 MM system connection and 20 mm drain and charging valve connection to facilitate the on site charging of the tank to meet system requirement. The tank shall be fitted with lifting rings and a floor mounting skirt for vertical installation. The tank and must be constructed in accordance with section VIII of the ASME/GB Boiler and pressure vessel (Unfired) code and stamped PSI working pressure as per PN25 requirement. The complete system shall be sourced from single manufacturer and supplied and installed with all accessories The closed expansion tank will be of M.S. construction of 6 mm thick with interchangeable EPDM-BUTYL rubber membrane or a rubber membrane of heavy duty Butyl material. . The tank will be of pressure rating to suit the system pressure and will be sized to adequately compensate for water expansion due to operating temperature variations. The tank shall be fabricated 1 for “non-fired pressure vessels” and the flanges shall be as per ANSI.For chilled water application, it will be insulated with 50mm thick insulation to the specifications and cladded with 26G-aluminium cladding. The expansion tank shall be supplied along with pressurization unit. The pressurization unit shall consist of two nos. (1 working + 1 stand-by) high pressure pumps of suitable pressure rating mounted on M.S. frame, complete with interconnecting piping, isolation valves, NRV, Y- strainer, pressure gauge, pressure transmitter, auto-logic panel (IP 55) with dry-run protection, electrical MCB and interconnecting wiring. The total Volume of water in Hot water circuit 500 Lt. The contractor shall submit calculations for total system volume and tank sizing. |
| 27 | COMBINED AIR SEPARATORS (to be placed in return chilled water pipe before primary chilled water Pump) Supply, Installation, Testing & Commissioning of combined Automatic Air Separators as per the Specifications on the return water line located at the pump suction or a suitable location as suggested and suitable for (435) USGPM 125mm dia flange HW water flow respectively. The Separator should be capable of removing all micro bubbles and should have a steel tube & copper wire media to carry out its operation. The separator should be complete with high capacity air vent, service valve, Drain Valve etc. The Minimum Free area of the Air Vent on top should be 50mm. Necessary civil work required for the above equipment shall be included in this item quoted price.. |
| 28 | HOT WATER GENERATOR FOR WINTER HEATINGHot Water BoilerSupplying, fixing, testing and commissioning of Horizontal fire tube boiler operative. All accessories, Including automatic burner pre heaters interconnecting H.P. flexible/ copper piping. Fuel pumping and blower with damper & auto electric sequence control/ operational panel complete all as specified of 6,00,000 Kcal / Hr Each, (1W+1S). The job includes PCC foundation as directed by OEM. Hot Water Outlet Temperature : 90 deg C (194˚ F)Hot Water Inlet Temperature : 70 deg C (158˚ F)Capacity in KW : 698Hot Water Generator 6,00,000 Kcal (1W+1S) |
| 29 | Supply,Installation, testing & commissioning of centrifugal End sunction pump set factory assembled & tested for rated efficiency. VFD compatible motor with class F insulation & common base frame, coupling guard, cladded insulation, etc. for re-circulation of hot water for the central Heating system. The pumps shall be suitable for operation on 415 ± 10% Volts, 50 Hz, 3 Phase AC power supply, The pump characteristic shall be as follows : |
| 30 | Hot Water PUMP for Heating (1 Working+ 1 Stand by) Primary CircuitWater flow rate : 30 MTR cubic/ hr.Head : 32 MTRMotor HP : 10 HP (suggested) or as per actual selection |
| 31 | Hot Water PUMP for Heating (1 Working+ 1 Stand by) Secondary CircuitWater flow rate : 550 USGPMHead : 45 MTRMotor HP : 35 HP (suggested) or as per actual selection |
| 32 | PRESSURLESS HOT WATER EXPANSION TANKSupplying, installing, testing and commissioning of Pressure less HOT WATER EXPANSION TANK suitable for total volume of water in Hot water circuits along with necessary accessories such as centrifugal air separator, pumps etc. The tank shall be precharged steel expansion tank with replaceable heavy duty butyl rubber bladder. The tank shall have 50 MM system connection and 20 mm drain and charging valve connection to facilitate the on site charging of the tank to meet system requirement. The tank shall be fitted with lifting rings and a floor mounting skirt for vertical installation. The tank and must be constructed in accordance with section VIII of the ASME/GB Boiler and pressure vessel (Unfired) code and stamped PSI working pressure as per PN25 requirement. The complete system shall be sourced from single manufacturer and supplied and installed with all accessories The closed expansion tank will be of M.S. construction of 6 mm thick with interchangeable EPDM-BUTYL rubber membrane or a rubber membrane of heavy duty Butyl material. . The tank will be of pressure rating to suit the system pressure and will be sized to adequately compensate for water expansion due to operating temperature variations. The tank shall be fabricated 1 for “non-fired pressure vessels” and the flanges shall be as per ANSI.For chilled water application, it will be insulated with 50mm thick insulation to the specifications and cladded with 26G-aluminium cladding. The expansion tank shall be supplied along with pressurization unit. The pressurization unit shall consist of two nos. (1 working + 1 stand-by) high pressure pumps of suitable pressure rating mounted on M.S. frame, complete with interconnecting piping, isolation valves, NRV, Y- strainer, pressure gauge, pressure transmitter, auto-logic panel (IP 55) with dry-run protection, electrical MCB and interconnecting wiring. The total Volume of water in Hot water circuit 500 Lt. The contractor shall submit calculations for total system volume and tank sizing. |
| 33 | COMBINED AIR SEPARATORS (to be placed in return chilled water pipe before primary chilled water Pump) Supply, Installation, Testing & Commissioning of combined Automatic Air Separators as per the Specifications on the return water line located at the pump suction or a suitable location as suggested and suitable for (550) USGPM 150mm dia Flange HW water flow respectively. The Separator should be capable of removing all micro bubbles and should have a steel tube & copper wire media to carry out its operation. The separator should be complete with high capacity air vent, service valve, Drain Valve etc. The Minimum Free area of the Air Vent on top should be 50mm. Necessary civil work required for the above equipment shall be included in this item quoted price. |
| 34 | INSULATED HOT WATER PIPING (INSIDE THE BUILDING)Supplying, laying/ fixing, testing and commissioning of following nominal sizes of Hot water plumbing Pipes of sizes 150mm & following below shall be M.S. 'C' class as per IS : 1239 (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) and pipes size above 150mm shall be welded black steel pipe heavy class as per IS: 3589 including SITC Insulated MS pipe, having minimum thickness of PUF insulation mention below and density 36Kg/Cum,after a thick coat of cold setting adhesive (CPRX compound) with vapor barrier of 120gm/sqmt polythen sheet with 50 mm overlap and tide down with lacing wire and 26 gauge Aluminium Cladding all as specidied and directed. |
| 35 | 150mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 36 | 125mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 37 | 100mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 38 | 80mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 39 | 65mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 40 | 50mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 41 | 40mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 42 | 32mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 43 | 25mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 44 | 20mm dia MS Pipes (with 50 mm Thick Insulation & 26 gauge Aluminium Cladding) |
| 45 | INSULATED HOT WATER PIPING (BURIED AND LAID UNDER GROUND )Supplying, laying/ fixing, testing and commissioning of following nominal sizes of Hot water plumbing Pipes of sizes 150mm & below shall be M.S. 'C' class as per IS : 1239 (with necessary clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) and pipes size above 150mm shall be welded black steel pipe heavy class as per IS: 3589 including SITC of Insulated MS pipe,having minimum thickness of PUF insulation mention belowand density 36Kg/Cum, after a thick coat of cold setting adhesive (CPRX compound) with vapor barrier of 120gm/sqmt polythen sheet with 50 mm overlap and tide down with lacing wire,and 3mm thick HDPE Jacket completed all as specidied and directed. |
| 46 | 100mm dia MS Pipes (with 50 mm Thick PUF & 3mm Thick HDPE jacket) |
| 47 | 80mm dia MS Pipes (with 50 mm Thick PUF & 3mm Thick HDPE jacket) |
| 48 | 65mm dia MS Pipes (with 50 mm Thick PUF & 3mm Thick HDPE jacket) |
| 49 | 50mm dia MS Pipes (with 50 mm Thick PUF & 3mm Thick HDPE jacket) |
| 50 | INSULATED VALVES Supplying, fixing, testing and commissioning of following insulated BUTTERFLY VALVE (MANUAL) with CI (Cast Iron) body SS Disc, Nitrile Rubber Seal & O- Ring PN 16 pressure rating for chilled/ hot water circulation including insulation. These valves to be installed in Hot water plumbing duly insulated to the same specifications as the connected piping and adequately supported completed all as specified and directed |
| 51 | 150 mm dia |
| 52 | 125 mm dia |
| 53 | 100 mm dia |
| 54 | 80 mm dia |
| 55 | 65 mm dia |
| 56 | 50 mm dia |
| 57 | 40 mm dia |
| 58 | Supplying, fixing, testing and commissioning of insulated Y - STRAINER of Ductile CI (Cast Iron) Body flanged ends with stainless steel strainer for chilled / hot water circulation including insulation. Y- Strainer to be installed in Hot water plumbing duly insulated to the same specifications as the connected piping and adequately supported completed all as specified and directed |
| 59 | 150 mm dia |
| 60 | 125 mm dia |
| 61 | 80 mm dia |
| 62 | Supplying, fixing, testing and commissioning of following insulated NON - RETURN VALVE/Check Valve with dual plate/wafer swing of CI (cast iron) body SS plates vulcanized NBR seal flanged end & PN 16 pressure rating for chilled / hot water circulation including insulation. These valves to be installed in Hot water plumbing duly insulated to the same specifications as the connected piping and adequately supported completed all as specified and directed completed all as specified and directed |
| 63 | 150 mm dia |
| 64 | 125 mm dia |
| 65 | 80 mm dia |
| 66 | Supplying, fixing, testing and commissioning of insulated BALANCING VALVE WITH BUILT-IN MEASURING FACILITY with C I body flanged construction with EPDM coated disc with long pitch & PN 16 pressure rating for condensor water circulation completed all as specified and directed all as specified and directed. |
| 67 | 150 mm dia |
| 68 | 125 mm dia |
| 69 | 100 mm dia |
| 70 | 80 mm dia |
| 71 | 65 mm dia |
| 72 | Supply, installation, testing and commissioning of insulated neoprene Rubber Expansion Belows with integral reinforced rubber flanges at chiller & chilled water pumps (inlet & outlet) and duly insulated to the same specifications as the connected piping and adequately supported completed all as specified and directed. |
| 73 | 150 mm dia |
| 74 | 125 mm dia |
| 75 | 80 mm dia |
| 76 | PICB VALVE (PRESSURE INDEPENDENT CONTROL & BALANCING VALVE) / HIGH RANGABILITRY VALVESSupply, Installation Testing and Commissioning of PICB Valves (pressure independent valves) (PN-16 rated) with modulating, 2- way control device. The Valves should have self-Dynamic Flow Control that are pressure independent. It should be diaphragm type & pressure balancing valve. Pressure Drop across the valve must not exceed 20 kpa up to DN 32 and 30 Kpa in bigger Sizes. Actuator should be Gear type only shall be rated to IP54. Valve shall be of Brass Construction up to DN32. Valve & Actuator combination should be able to give logarithmic control characteristics to achieve linear control. 25 mm dia FCU Valves of Modulating Type completed all as specified and directed. |
| 77 | Supply, installation, testing and commissioning of Heating Thermostats for various Air Handling Units and Fan Coil Units as per specifications including all accessaries, mountings, wiring between thermostat & unit, terminations etc.Snap acting thermostats for Fan Coil Units completed all as specified and directed. |
| 78 | Supply,Installation Testing and Commissioning of the following Ball Valves with Strainer duly insulated as per specifications and drawings. It shall be bronze forged body construction with chrome plated bronze ball and handle of stainless steel constructions completed all as specified and directed.. |
| 79 | 25 mm dia |
| 80 | 20 mm dia |
| 81 | Supply,Installation Testing and Commissioning of the following Ball Valves without strainer duly insulated as per specifications and drawings. It shall be bronze forged body construction with chrome plated bronze ball and handle of stainless steel constructions completed all as specified and directed.. |
| 82 | 25 mm dia |
| 83 | 20 mm dia |
| 84 | Supply, installation, testing and commissioning of Auto Purge Valves of brass construction with screwed ends duly insulated as per specifications and drawings completed all as specified and directed. |
| 85 | 25 mm dia |
| 86 | 20 mm dia |
| 87 | Providing and fixing in position the industrial type Pressure gauges with gun metal/brass valves completed all as specified and directed. |
| 88 | Providing & fixing in position the mercury in glass industrial type thermometer completed all as specified and directed. |
| 89 | FAN COILS UNITS (CEILING SUSPENDED TYPE) Supply, installation, testing and commissioning of GI powder coated horizantal ceiling suspended fan coil units complete with fan, 3 speed motor, 3 row deep cooling copper coil, 5 mm external static, aluminium filters with filter box, double sandwitched insulated tray, ball valve with strainer, copper connection within 1.0mtr, rotary switch, supporting arrangement, electrical wiring etc.The thickness of GSS sheet should be 1.25 mm & thickness of filter shall be 15 mm. The fan shall be selected for 5 mm external static pressure. The complete fan coil unit shall be in line with the standard specification. The capacity of fan coil units shall be as follows. Proper supporting system for FCU to be provided & will be in contractor's scope and rates quoted shall be inclusive of supporting arrangement completed all as specified and directed. |
| 90 | 1000 CFM (2.5 TR) (7.0 kw-8.7 kw) |
| 91 | 1200 CFM (3.0 TR) (8.7 kw-10.5 kw) |
| 92 | 1600 CFM (4.0 TR) (10.5 kw-14 kw) |
| 93 | HI- WALL HOT WATER FAN COIL UNIT (FCU)Supply, installation ,testing and commisioning of High Wall Hot Water Fan Coil Unit (FCU) with inbuilt 2-way valves, comprising of two 2 rows deep hot water cooling copper coil, centrifugal blowers, fractional horse power (FHP) motor, synthetic fibre filters, insulated & extended condensate drain pan, casing, copper piping connections within 1.0mtr, condensate drain piping etc. including connections & wiring. Units shall be suitable for operation on 220 +/- 6% Volts, 50Hz, single phase power supply of following sizes & capacities completed all as specified and directed. |
| 94 | 400 CFM (1.0 TR) (1.0 kw-5.5 kw) |
| 95 | 600 CFM (1.5 TR) (5.0 kw- 7.0 kw) |
| 96 | 800 CFM (2.0 TR) (7.0 kw-10.5 kw) |
| 97 | Supply, installation, testing and commissioning of Hot water hydronic cassette type unit complete as required as per following specifications:- Casing ‐ The unit casing shall be fabricated from G.I sheets (as per OEM) and decorative panel with ABS Plastic. Access panel shall have positive locking fasteners for easy removal. Filter ‐ Filter Unit shall be provided with cleanable fabric filter having an efficiency of at least 70% down to 20 microns. Fan ‐ The fan shall be directly driven Centrifugal forward curved statically and dynamically balanced. Fan motor ‐ It shall be suitable for 220v +/‐ 10%, 50 Hz, single phase A.C supply with minimum 3 speeds., Motor shall be energy efficient, six pole with max. speed not exceeding 1000 rpm, heating coil ‐as per OEM. Drain Pan ‐ Pan shall be self‐contained with 12/15mm thick EPS/Nitrile rubber insulation. The inside of the insulation shall be suitably treated for preventing water absorption.The cassette unit shall be provided with cordless remote controller having controlling functions like set temperature, fan speed, change modes and timer on/ off. Alternate provision for wired controller with digital display shall also be provided. Each unit shall have high lift drain pump. |
| 98 | 2.5 TR |
| 99 | 3.0 TR |
| 100 | 4.0 TR |
| 101 | Site Fabricated GSS (Galvanized Sheet Steel) Duct (AS PER SMACNA STANDARDS)Supply, installation, balancing and commissioning of fabricated at site GSS (Galvanized Sheet Steel) sheet metal rectangular/ round ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per approved drawings and specifications of following sheet thickness complete as required. |
| 102 | Sheet thickness of 24 Gauge. |
| 103 | Sheet thickness of 22 Gauge. |
| 104 | Supply, installation, testing and commissioning of GI Volume control duct damper. The damper blade shall not be less than 1.25 mm (18) Gauge thickness, reinforced with 25 mm angles 3 mm thick complete with neoprene rubber gaskets, nuts, bolts, screws linkages, flanges etc, as per specifications. |
| 105 | SUPPLY / RETURN AIR DIFFUSERS |
| 106 | Supplying, fixing, testing and commissioning of supply air diffusers of powder coated aluminium with aluminium volume control dampers and with anti smudge ring & removable core. The damper blade shall not be less than 1.25 mm (18) Gauge thickness, reinforced with 25 mm angles 3 mm thick. |
| 107 | Supplying, fixing, testing and commissioning of Return air diffusers of powder coated aluminium without volume control dampers with anti smudge ring & removable core. |
| 108 | SUPPLY / RETURN AIR GRILLES |
| 109 | Supplying & fixing of powder coated extruded aluminium Supply Air Grilles with aluminium volume control dampers as per specifications. The damper blade shall not be less than 1.25 mm (18) Gauge thickness, reinforced with 25 mm angles 3 mm thick. |
| 110 | Supplying & fixing of powder coated extruded aluminium Return Air Grilles with louvers but without volume control dampers complete as required. Please Enable Macros to View BoQ information |
| 111 | Supplying & fixing of powder coated extruded aluminium Return Air Grilles with louvers but without volume control dampers complete as required. Please Enable Macros to View BoQ information |