| 1 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specially provided for complete all as specified and directed by Engr-in-Charge. |
| 2 | M&L for 75mm thick Cement concrete type D- 2, 1:4:8 (40mm graded aggregate) in floors complete all as specified and directed by Engineer in charge. |
| 3 | M&L for PCC type B–1,1:2:4, (using 20 mm graded crushed stone aggregate) as in floors complete all as specified and directed by Engr-in-Charge. |
| 4 | M&L for Coloured Chequered cement concrete tiles 30cmx30cmx 20-25mm thick, set, jointed and pointed in neat cement slurry in floors with grey cement and pigments over 20mm thick screed bed in cement mortar 1:6 complete all as specified and directed by Engineer in charge. |
| 5 | M&L for machine pressed precast concrete interlocking paver block of grey cement and pigment rubber moulded glossy finish, any shape and size confirming to IS-15658-2006 of 80 mm thickness complete all as specified and directed. |
| 6 | M&L for machine pressed precast concrete interlocking paver block of grey cement and pigment rubber moulded glossy finish any shape and size confirming to IS-15658-2006 of 60 mm thickness complete all as specified and directed. |
| 7 | M& L for Sand filling under floor including watering and consolidation. complete all as specified and directed. |
| 8 | M&L for PCC 1:2:4 type B0 (12.5 mm graded aggregate) as in copings, kneelers, apex stones, like including weathering, slightly rounded or chamfered angles and throating, complete all as specified and directed by Engr-in-Charge. |
| 9 | Supply and Fixing in repairs 110mm dia PVC (SWR) pipes, single socketed in any length with rubber ring joints as in weep holes complete all as specified and directed by Engr-in-Charge. |
| 10 | Supply and Fixing in repairs, PVC (SWR) bends, 110mm dia fixed to PVC pipes complete all as specified and directed by Engr-in-Charge. |
| 11 | M&L for Precast cement concrete block type C-1, 1:3:6 (20mm graded aggregate) masonry with solid blocks, exc 10 cm in width and setting in cement mortar 1:6 including Demolition of Brickwork or stone / boulder masonry , built in cement mortar or cement lime mortar including all quoins, arches , pillars, etc, for ashlar facings, dressed stonework, precast concrete articles and precast concrete block walling complete all as specified and directed by Engr-in-Charge. |
| 12 | Taking down cement or cement lime plaster of any description on brick or stone walls etc including raking out joints, hacking for key etc complete all as specified and directed by Engr-in-Charge. |
| 13 | M&L for rendering 15mm thick in CM 1:4 on fair faces of brick work or concrete surfaces finished even and smooth without using extra cement complete all as specified and directed by Engr-in-Charge. |
| 14 | Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance,dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces. complete all as specified and directed by Engr-in-Charge. |
| 15 | M&L for providing and laying cement concrete type B-1, 1:2:4 (using 20mm graded stone aggrigate) in kerbs, rounded or chamfered on edges complete all as specified and directed by Engr-in-Charge. |
| 16 | Material and labour for preparation of plastered surface / concrete surfaces of any description and applying two coat of synthetic enemel paint over a coat of primer complete all as specified and directed by Engr-in-Charge. |
| 17 | Material and labour for preparation of old plastered surface / concrete surfaces of any description and applying one coat of synthetic enemel paint complete all as specified and directed by Engr-in-Charge. Note for all items mentioned here in before it is inform that the material incorporated in this work shall be purchased by contractor before starting of work at site as per make approved by GE. At least 75% of total material will be deposited to the custody of Engineer-in-charge and will be opened at the presence of Engineer-in-charge or the rap of EIC. This aspect shall be monitored by EIC. The purchase voucher of the same shall be kept on record duly defaced. Please Enable Macros to View BoQ information |