|
| 1 | Repair/Replacement of 7.5 HP Mody make submersible pump of following parts (old material to be retained by the firm):- Rewinding kit including enamel copper wire, Nomex paper, sheet paper, varnish, lead wire, transformer fiber glass sleeves, etc. as required (Item no. 01 to 10pertains to 7.5 HP mody submersible pump). |
| 2 | Replacement of set of 'O' ring |
| 3 | Replacement of Mechanical seal upper. |
| 4 | Replacement of Mechanical seal lower. |
| 5 | Replacement of ball bearing upper. |
| 6 | Replacement of ball bearing lower. |
| 7 | Replacement of oil. |
| 8 | Replacement of cable size 7C x 4 sq mm + 2C x 1 sqmm |
| 9 | Labour charge for oil filling & servicing of seal module. |
| 10 | Labour charge for disantling/ assembling/ testing/ painting etc. |
| 11 | Reparing of sewage submersible pump set 15HP (Mody make) (Item no. 11 to 22 pertains to 15 HP mody submersible pump):'O' ring |
| 12 | Mechanical seal upper. |
| 13 | Mechanical seal lower. |
| 14 | Ball bearing upper. |
| 15 | Ball bearing lower. |
| 16 | Hardware |
| 17 | Rewinding kit |
| 18 | Labour charge for rewinding |
| 19 | Labour charge for repairing & balancing of rotor |
| 20 | Labour charge for dismantling/assembling/testing/painting etc. |
| 21 | Labour charge for fixing upper & lower bearing |
| 22 | Repairing of the following dia/model of storm water pump i/c dismantling of pump set frombase from by cutting of nut bolts of suction and delivery side, i/c gland plate/split gland, MS lock nut with lock washer, impeller, keys and coupling, stud of gland plate and all packings i/coiling greasing, replacement of required body studs and nuts, coupling tyre, required machining works for proper balancing of complete pump unit and minor repair works and dynamic balancing with existing motor i/c installation, testing and commissioning on full load etc. as required complete in all aspects.Having suction of 80 mm(Model no. SP3L) |
| 23 | Overhauling of the following ratings/models of diesel engine i/c dismantling of engine from baseframe by cutting of nut bolts i/c loading/unloading by skilled labour, to & fro cartage, replacement of parts/accessories i/c piston, piston rings, lube oil filter, diesel filter, gear pump, nozzle, cylinder liner, axle, rubber wheels, connection pipe set, head repair and crank gringing i/c grinding, polishing etc., replacement of all packings complete in all respects, required body studs & nuts, mobil oil and minor repair works along with dynamic balancing with existing pump i/c installation, testing and commissioning on full load etc. as required complete in all respects. (Make: Kirloskar)6 BHP rating (Model no. TAF1) Please Enable Macros to View BoQ information |